Village of Gouverneur, New York; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 52500-52501 [2019-21409]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
52500
Federal Register / Vol. 84, No. 191 / Wednesday, October 2, 2019 / Notices
Docket Numbers: ER19–2867–000.
Applicants: Cameron Ridge, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5039.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2868–000.
Applicants: Cameron Ridge II, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5041.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2869–000.
Applicants: San Gorgonio Westwinds
II—Windustries, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5046.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2870–000.
Applicants: Victory Garden Phase IV,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5049.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2871–000.
Applicants: Arizona Public Service
Company.
Description: Tariff Cancellation: Rate
Schedule No. 98 Cancellation to be
effective 12/1/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5053.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2872–000.
Applicants: Pacific Crest Power, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5075.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2873–000.
Applicants: Ridgetop Energy, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5078.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2874–000.
Applicants: San Gorgonio Westwinds
II, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5084.
VerDate Sep<11>2014
16:42 Oct 01, 2019
Jkt 250001
Comments Due: 5 p.m. ET 10/17/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21406 Filed 10–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14635–001]
Village of Gouverneur, New York;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
Minor License.
b. Project No.: 14635–001.
c. Date Filed: September 20, 2019.
d. Applicant: Village of Gouverneur,
New York.
e. Name of Project: Gouverneur
Hydroelectric Project.
f. Location: The existing project is
located on the Oswegatchie River, in St.
Lawrence County, New York. The
project does not occupy any federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(a).
h. Applicant Contact: Ronald P.
McDougall, Mayor, Village of
Gouverneur, 33 Clinton Street,
Gouverneur, NY 13642; (315) 287–1720
i. FERC Contact: Jody Callihan, (202)
502–8278 or jody.callihan@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 19, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14635–001.
m. This application is not ready for
environmental analysis at this time.
n. The Gouverneur Project consists of
the following existing facilities: (1) A
250-foot-long concrete gravity dam,
including two bridge piers, which
separate the dam into three spillways
that range in crest elevation from 403.4
to 403.7 feet North American Vertical
Datum of 1988 (NAVD88); (2) an
impoundment with a surface area of 109
acres at the normal pool elevation of
403.8 feet NAVD88; (3) a concrete intake
structure containing two trash rack bays
separated by a 2-foot-wide center pier;
(4) a 20-foot-long by 36-foot-wide
powerhouse that is integral with the
dam and contains two vertical bulb
turbines rated at 100 kilowatts each and
two 100-kilovolt-ampere Westinghouse
generators with a power factor of 0.8;
and (5) appurtenant facilities.
The Village proposes to continue
operating the project in a run-of-river
E:\FR\FM\02OCN1.SGM
02OCN1
Federal Register / Vol. 84, No. 191 / Wednesday, October 2, 2019 / Notices
mode. In addition, the Village proposes
to release a minimum flow of 110 cubic
feet per second over the project’s
spillways. The project generated an
annual average of 1,195 megawatt-hours
between 2014 and 2017.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule may be made as appropriate.
Issue Deficiency Letter (if necessary):
November 2019
Request Additional Information:
November 2019
Issue Acceptance Letter: February 2020
Issue Scoping Document 1 for
comments: March 2020
Request Additional Information (if
necessary): May 2020
Issue Scoping Document 2 (if
necessary): June 2020
Issue notice of ready for environmental
analysis: June 2020
Commission issues Environmental
Assessment (EA): December 2020
Comments on EA: January 2021
khammond on DSKJM1Z7X2PROD with NOTICES
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21409 Filed 10–1–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:42 Oct 01, 2019
Jkt 250001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR19–36–000]
Pilot Travel Centers LLC v. Colonial
Pipeline Company; Notice of
Complaint
Take notice that on September 25,
2019, pursuant to Rule 206 of the Rules
of Practice and Procedure of the Federal
Energy Regulatory Commission’s
(Commission) 18 CFR 385.206 (2019),
Part 343 of the Commission’s Rules and
Regulations, 18 CFR 343, et seq. (2019)
and sections 1(5), 6, 8, 9,13, 15, and 16
of the Interstate Commerce Act (ICA), 49
U.S.C. App. 1(5), 6, 8, 9, 13, 15, and 16
and section 1803 of the Energy Policy
Act of 1992, Pilot Travel Centers LLC
(Complainant) filed a formal complaint
against Colonial Pipeline Company
(Colonial or Respondent) challenging
the justness and reasonableness of (1)
Colonial’s cost-based transportation
rates in Tariff F.E.R.C. No. 99.52.0 and
predecessor tariffs; (2) Colonial’s
market-based rate authority and rates
charged pursuant to that authority; and
(3) Colonial’s charges relating to product
loss allocation and transmix, all as more
fully explained in the complaint.
Pilot certifies that copies of the
complaint were served on the contacts
for Colonial as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
52501
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 25, 2019.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21405 Filed 10–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: CP19–511–000.
Applicants: Gulf South and Enable
Gas Transmission.
Description: Joint Abbreviated
Application for Certificate of Public
Convenience and Necessity,
Abandonment, Acquisition, and Related
Authorizations of Gulf South Pipeline
Company, LP, et al. under CP19–511.
Filed Date: 9/23/19.
Accession Number: 20190923–5145.
Comments Due: 10/15/19.
Docket Numbers: RP19–1596–000.
Applicants: Young Gas Storage
Company, Ltd.
Description: Annual Operational
Purchases and Sales Report of Young
Gas Storage Company, Ltd. under RP19–
1596.
Filed Date: 9/25/19.
Accession Number: 20190925–5049.
Comments Due: 5 p.m. ET 10/7/19.
Docket Numbers: RP19–1597–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: Annual Operational
Purchases and Sales Report of Wyoming
Interstate Company, L.L.C. under RP19–
1597.
Filed Date: 9/25/19.
Accession Number: 20190925–5060.
Comments Due: 5 p.m. ET 10/7/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 84, Number 191 (Wednesday, October 2, 2019)]
[Notices]
[Pages 52500-52501]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21409]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14635-001]
Village of Gouverneur, New York; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Minor License.
b. Project No.: 14635-001.
c. Date Filed: September 20, 2019.
d. Applicant: Village of Gouverneur, New York.
e. Name of Project: Gouverneur Hydroelectric Project.
f. Location: The existing project is located on the Oswegatchie
River, in St. Lawrence County, New York. The project does not occupy
any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(a).
h. Applicant Contact: Ronald P. McDougall, Mayor, Village of
Gouverneur, 33 Clinton Street, Gouverneur, NY 13642; (315) 287-1720
i. FERC Contact: Jody Callihan, (202) 502-8278 or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: November 19, 2019.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-14635-001.
m. This application is not ready for environmental analysis at this
time.
n. The Gouverneur Project consists of the following existing
facilities: (1) A 250-foot-long concrete gravity dam, including two
bridge piers, which separate the dam into three spillways that range in
crest elevation from 403.4 to 403.7 feet North American Vertical Datum
of 1988 (NAVD88); (2) an impoundment with a surface area of 109 acres
at the normal pool elevation of 403.8 feet NAVD88; (3) a concrete
intake structure containing two trash rack bays separated by a 2-foot-
wide center pier; (4) a 20-foot-long by 36-foot-wide powerhouse that is
integral with the dam and contains two vertical bulb turbines rated at
100 kilowatts each and two 100-kilovolt-ampere Westinghouse generators
with a power factor of 0.8; and (5) appurtenant facilities.
The Village proposes to continue operating the project in a run-of-
river
[[Page 52501]]
mode. In addition, the Village proposes to release a minimum flow of
110 cubic feet per second over the project's spillways. The project
generated an annual average of 1,195 megawatt-hours between 2014 and
2017.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule may be made as appropriate.
Issue Deficiency Letter (if necessary): November 2019
Request Additional Information: November 2019
Issue Acceptance Letter: February 2020
Issue Scoping Document 1 for comments: March 2020
Request Additional Information (if necessary): May 2020
Issue Scoping Document 2 (if necessary): June 2020
Issue notice of ready for environmental analysis: June 2020
Commission issues Environmental Assessment (EA): December 2020
Comments on EA: January 2021
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21409 Filed 10-1-19; 8:45 am]