instream flow for the bypassed reach.
However, a flow of 20 cfs is provided to
the bypassed reach over the crest of the
dam. When river flow is less than or
greater than the hydraulic capacity of
the turbine (i.e., 230 cfs and 850 cfs,
respectively), water is spilled over the
dam into the bypassed reach. The
Woonsocket Falls project has an average
annual generation of approximately
4,584 megawatt-hours.
The City proposes to: (1) Operate the
impoundment in a run-of-river mode
pursuant to an operating plan and
Memorandum of Agreement (MOA)
with the Corps; (2) provide a year-round
minimum flow of 20 cfs to the bypassed
reach pursuant to an operating plan and
MOA with the Corps; (3) provide
upstream eel passage; and (4)
implement nighttime turbine shutdowns
during the downstream eel passage
season to protect eels during passage.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction inspection
and reproduction at the addresses in
item h above.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
All filings must (1) bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
VerDate Sep<11>2014
16:42 Oct 01, 2019
Jkt 250001
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural Schedule: The
application will be processed according
to the following revised schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Filing of interventions, protests, comments, recommendations, preliminary terms and conditions, and preliminary
fishway prescriptions.
Commission issues Environmental Assessment.
Comments on Environmental Assessment.
November 2019.
April 2020.
May 2020.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of this notice.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21408 Filed 10–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
52499
Docket Numbers: ER19–62–003.
Applicants: OneEnergy Baker Point
Solar, LLC.
Description: Compliance filing:
Reactive Power Settlement Compliance
to be effective 12/1/2018.
Filed Date: 9/26/19.
Accession Number: 20190926–5114.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–668–001.
Applicants: Energy Center Dover LLC.
Description: Compliance filing:
Informational Filing Re Upstream
Change in Control and Request for
Waiver to be effective N/A.
Filed Date: 9/26/19.
Accession Number: 20190926–5048.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2517–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment:
Request to Hold Proceeding in
Abeyance under Docket No. ER19–2517
to be effective 12/31/9998.
Filed Date: 9/25/19.
Accession Number: 20190925–5131.
Comments Due: 5 p.m. ET 10/16/19.
Docket Numbers: ER19–2529–001.
Applicants: Black Hills Wyoming,
LLC.
Description: Tariff Amendment:
Response to Staff Letter to be effective
10/2/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5040.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2864–000.
Applicants: Mankato Energy Center,
LLC.
Description: § 205(d) Rate Filing:
Mankato Amended Reactive Supply
Service Tariff Filing to be effective 12/
31/9998.
Filed Date: 9/25/19.
Accession Number: 20190925–5124.
Comments Due: 5 p.m. ET 10/16/19.
Docket Numbers: ER19–2865–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1518R18 Arkansas Electric Cooperative
Corp NITSA NOA to be effective 9/1/
2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5026.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2866–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–09–26_Termination of SA 3219
Flying Cow Wind-OTP E&P (J493 J510)
to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5038.
Comments Due: 5 p.m. ET 10/17/19.
E:\FR\FM\02OCN1.SGM
02OCN1
khammond on DSKJM1Z7X2PROD with NOTICES
52500
Federal Register / Vol. 84, No. 191 / Wednesday, October 2, 2019 / Notices
Docket Numbers: ER19–2867–000.
Applicants: Cameron Ridge, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5039.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2868–000.
Applicants: Cameron Ridge II, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5041.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2869–000.
Applicants: San Gorgonio Westwinds
II—Windustries, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5046.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2870–000.
Applicants: Victory Garden Phase IV,
LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5049.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2871–000.
Applicants: Arizona Public Service
Company.
Description: Tariff Cancellation: Rate
Schedule No. 98 Cancellation to be
effective 12/1/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5053.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2872–000.
Applicants: Pacific Crest Power, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5075.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2873–000.
Applicants: Ridgetop Energy, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5078.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19–2874–000.
Applicants: San Gorgonio Westwinds
II, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff to be
effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926–5084.
VerDate Sep<11>2014
16:42 Oct 01, 2019
Jkt 250001
Comments Due: 5 p.m. ET 10/17/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21406 Filed 10–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14635–001]
Village of Gouverneur, New York;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original
Minor License.
b. Project No.: 14635–001.
c. Date Filed: September 20, 2019.
d. Applicant: Village of Gouverneur,
New York.
e. Name of Project: Gouverneur
Hydroelectric Project.
f. Location: The existing project is
located on the Oswegatchie River, in St.
Lawrence County, New York. The
project does not occupy any federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(a).
h. Applicant Contact: Ronald P.
McDougall, Mayor, Village of
Gouverneur, 33 Clinton Street,
Gouverneur, NY 13642; (315) 287–1720
i. FERC Contact: Jody Callihan, (202)
502–8278 or jody.callihan@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: November 19, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14635–001.
m. This application is not ready for
environmental analysis at this time.
n. The Gouverneur Project consists of
the following existing facilities: (1) A
250-foot-long concrete gravity dam,
including two bridge piers, which
separate the dam into three spillways
that range in crest elevation from 403.4
to 403.7 feet North American Vertical
Datum of 1988 (NAVD88); (2) an
impoundment with a surface area of 109
acres at the normal pool elevation of
403.8 feet NAVD88; (3) a concrete intake
structure containing two trash rack bays
separated by a 2-foot-wide center pier;
(4) a 20-foot-long by 36-foot-wide
powerhouse that is integral with the
dam and contains two vertical bulb
turbines rated at 100 kilowatts each and
two 100-kilovolt-ampere Westinghouse
generators with a power factor of 0.8;
and (5) appurtenant facilities.
The Village proposes to continue
operating the project in a run-of-river
E:\FR\FM\02OCN1.SGM
02OCN1
Agencies
[Federal Register Volume 84, Number 191 (Wednesday, October 2, 2019)]
[Notices]
[Pages 52499-52500]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21406]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-62-003.
Applicants: OneEnergy Baker Point Solar, LLC.
Description: Compliance filing: Reactive Power Settlement
Compliance to be effective 12/1/2018.
Filed Date: 9/26/19.
Accession Number: 20190926-5114.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-668-001.
Applicants: Energy Center Dover LLC.
Description: Compliance filing: Informational Filing Re Upstream
Change in Control and Request for Waiver to be effective N/A.
Filed Date: 9/26/19.
Accession Number: 20190926-5048.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2517-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Request to Hold Proceeding in
Abeyance under Docket No. ER19-2517 to be effective 12/31/9998.
Filed Date: 9/25/19.
Accession Number: 20190925-5131.
Comments Due: 5 p.m. ET 10/16/19.
Docket Numbers: ER19-2529-001.
Applicants: Black Hills Wyoming, LLC.
Description: Tariff Amendment: Response to Staff Letter to be
effective 10/2/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5040.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2864-000.
Applicants: Mankato Energy Center, LLC.
Description: Sec. 205(d) Rate Filing: Mankato Amended Reactive
Supply Service Tariff Filing to be effective 12/31/9998.
Filed Date: 9/25/19.
Accession Number: 20190925-5124.
Comments Due: 5 p.m. ET 10/16/19.
Docket Numbers: ER19-2865-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1518R18 Arkansas Electric
Cooperative Corp NITSA NOA to be effective 9/1/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5026.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2866-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-09-26_Termination of SA
3219 Flying Cow Wind-OTP E&P (J493 J510) to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5038.
Comments Due: 5 p.m. ET 10/17/19.
[[Page 52500]]
Docket Numbers: ER19-2867-000.
Applicants: Cameron Ridge, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5039.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2868-000.
Applicants: Cameron Ridge II, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5041.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2869-000.
Applicants: San Gorgonio Westwinds II--Windustries, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5046.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2870-000.
Applicants: Victory Garden Phase IV, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5049.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2871-000.
Applicants: Arizona Public Service Company.
Description: Tariff Cancellation: Rate Schedule No. 98 Cancellation
to be effective 12/1/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5053.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2872-000.
Applicants: Pacific Crest Power, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5075.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2873-000.
Applicants: Ridgetop Energy, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5078.
Comments Due: 5 p.m. ET 10/17/19.
Docket Numbers: ER19-2874-000.
Applicants: San Gorgonio Westwinds II, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff to be effective 9/27/2019.
Filed Date: 9/26/19.
Accession Number: 20190926-5084.
Comments Due: 5 p.m. ET 10/17/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21406 Filed 10-1-19; 8:45 am]
BILLING CODE 6717-01-P