Big Wood Canal Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 52081 [2019-21328]
Download as PDF
Federal Register / Vol. 84, No. 190 / Tuesday, October 1, 2019 / Notices
Comments: Comments are invited on:
(1) Whether the collection of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: September 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21337 Filed 9–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7686–004]
jbell on DSK3GLQ082PROD with NOTICES
Big Wood Canal Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Conduit Exemption.
b. Project No.: 7686–004.
c. Date Filed: August 22, 2019.
d. Applicant: Big Wood Canal
Company.
e. Name of Project: Jim Knight
Hydroelectric Project.
f. Location: The project is located on
the South Gooding Main Canal in
Gooding County, near Gooding, Idaho.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Nicholas E.
Josten, GeoSense LLC, 2742 Saint
Charles Ave., Idaho Falls, ID 83404,
(208) 528–6152.
i. FERC Contact: Linda Stewart, (202)
502–8184, linda.stewart@ferc.gov.
j. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
5 Fuel
Adjustment Clause (FAC)
VerDate Sep<11>2014
18:10 Sep 30, 2019
Jkt 250001
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
must be filed with the Commission
within 45 days from the issuance date
of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–7686–004.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, it must
also serve a copy of the document on
that resource agency.
k. Description of Request: Big Wood
Canal Company (exemptee) proposes to
construct a new powerhouse and
remove the existing powerhouse.
Specifically, the exemptee proposes to
construct a new intake structure and a
new powerhouse containing a single
475-kilowatt (kW) turbine generating
unit. These project features would be
located immediately downstream of the
existing powerhouse. The exemptee also
proposes to remove the existing intake
structure and the existing powerhouse,
which contains three turbine generating
units with a total installed capacity of
289 kW.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number,
PO 00000
Frm 00022
Fmt 4703
Sfmt 9990
52081
P–7686, in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
deadline date for the particular
application.
n. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). A copy
of all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: September 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21328 Filed 9–30–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\01OCN1.SGM
01OCN1
Agencies
[Federal Register Volume 84, Number 190 (Tuesday, October 1, 2019)]
[Notices]
[Page 52081]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21328]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7686-004]
Big Wood Canal Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, Protests,
Recommendations, and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Conduit Exemption.
b. Project No.: 7686-004.
c. Date Filed: August 22, 2019.
d. Applicant: Big Wood Canal Company.
e. Name of Project: Jim Knight Hydroelectric Project.
f. Location: The project is located on the South Gooding Main Canal
in Gooding County, near Gooding, Idaho.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Nicholas E. Josten, GeoSense LLC, 2742
Saint Charles Ave., Idaho Falls, ID 83404, (208) 528-6152.
i. FERC Contact: Linda Stewart, (202) 502-8184,
[email protected].
j. Deadline for filing responsive documents: Due to the small size
of the proposed project, as well as the resource agency consultation
letters filed with the application, the 60-day timeframe specified in
18 CFR 4.34(b) for filing all comments, motions to intervene, protests,
recommendations, terms and conditions, and prescriptions is shortened
to 30 days from the issuance date of this notice. All reply comments
must be filed with the Commission within 45 days from the issuance date
of this notice.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-7686-004.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, it must also serve a
copy of the document on that resource agency.
k. Description of Request: Big Wood Canal Company (exemptee)
proposes to construct a new powerhouse and remove the existing
powerhouse. Specifically, the exemptee proposes to construct a new
intake structure and a new powerhouse containing a single 475-kilowatt
(kW) turbine generating unit. These project features would be located
immediately downstream of the existing powerhouse. The exemptee also
proposes to remove the existing intake structure and the existing
powerhouse, which contains three turbine generating units with a total
installed capacity of 289 kW.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number, P-7686, in the docket number
field to access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
deadline date for the particular application.
n. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'',
``MOTION TO INTERVENE,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,''
``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the
heading, the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, motions to intervene, or protests must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: September 25, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21328 Filed 9-30-19; 8:45 am]
BILLING CODE 6717-01-P