Power Supply Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 51534-51535 [2019-21048]

Download as PDF 51534 Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices 90-day Federal Authorization Decision Deadline—May 9, 2020 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the projects’ progress. Project Descriptions Acadiana Project KMLP proposes to install three new natural gas-fired compressor units (31,900 horsepower [hp] each) and rewheel two existing compressor units at its existing Compressor Station 760 in Acadia Parish, make modifications to meter piping and new control valves at its existing Columbia Gulf Meter Station in Evangeline Parish, as well as install auxiliary facilities at both locations. Louisiana Xpress Project Columbia Gulf proposes to construct and operate three new greenfield compressor stations, and modify one existing compressor station. Each new compressor station (Shelburn Compressor Station in East Carroll Parish, Red Mountain Compressor Station in Catahoula Parish, and Chicot Compressor Station in Evangeline Parish) would include two 23,470 hp natural gas turbine driven compressors (totaling 46,940 hp), filter/separators, gas cooling bays, 48-inch-diameter suction and 42-inch-diameter discharge piping, and related appurtenant facilities. Modifications to the existing Alexandria Compressor Station in Rapides Parish would include additional cooling bays with associated piping and appurtenant facilities. khammond on DSKJM1Z7X2PROD with NOTICES Background On August 28, 2019, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Acadiana Project and Request for Comments on Environmental Issues (NOI). Also on August 28, 2019, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Proposed Louisiana Xpress Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Session. The NOIs were sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI for the Acadiana Project, the Commission received comments from the Louisiana Department of Wildlife and Fisheries and Cheniere Energy. The primary VerDate Sep<11>2014 19:16 Sep 27, 2019 Jkt 247001 issues raised by the commentors are potential impacts on the wild coco orchid. The comment from Cheniere Energy was a statement in support of the Acadiana Project. In response to the NOI for the Louisiana Xpress Project, the Commission received comments from SKL Farm Inc., and the Choctaw Nation of Oklahoma. The primary issues raised by the commentors are adverse effects of artificial light, noise, and increased activity from the proposed compressor stations. The Choctaw Nation of Oklahoma requested GIS shapefiles, and the cultural resource surveys for the Louisiana Xpress Project. All substantive comments will be addressed in the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP19–484 or CP19–488), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: September 24, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–21140 Filed 9–27–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2833–000] Power Supply Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Power Supply Partners, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is October 10, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC E:\FR\FM\30SEN1.SGM 30SEN1 Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 20, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–21048 Filed 9–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL19–98–000; EL19–99–000] Notice of Institution of Section 206 Proceeding and Refund Effective Date; York Haven Power Co., LLC, Lake Lynn Generation, LLC On September 20, 2019, the Commission issued an order in Docket Nos. EL19–98–000 and EL19–99–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2018), instituting an investigation into whether York Haven Power Co., LLC and Lake Lynn Generation, LLC’s Reactive Service rate schedules remains just and reasonable. York Haven Power Co., LLC, et al., 168 FERC ¶ 61,187 (2019). The refund effective date in Docket Nos. EL19–98–000 and EL19–99–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket Nos. EL19–98–000 and EL19–99–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2019), within 21 days of the date of issuance of the order. Dated: September 20, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–21046 Filed 9–27–19; 8:45 am] BILLING CODE 6717–01–P khammond on DSKJM1Z7X2PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–120–000. VerDate Sep<11>2014 19:16 Sep 27, 2019 Jkt 247001 Applicants: El Paso Electric Company, Sun Jupiter Holdings LLC. Description: Supplement to August 13, 2019 Joint Application for Authorization Under Section 203 of the Federal Power Act of El Paso Electric Company, et al. Filed Date: 9/23/19. Accession Number: 20190923–5084. Comments Due: 5 p.m. ET 10/15/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–187–000. Applicants: Bronco Plains Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Bronco Plains Wind, LLC. Filed Date: 9/20/19. Accession Number: 20190920–5183. Comments Due: 5 p.m. ET 10/11/19. Docket Numbers: EG19–188–000. Applicants: Poseidon Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Poseidon Wind, LLC. Filed Date: 9/23/19. Accession Number: 20190923–5183. Comments Due: 5 p.m. ET 10/15/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1470–009; ER18–836–002; ER10–1290–009; ER16– 1833–005; ER10–3026–008. Applicants: San Diego Gas & Electric Company, Energia Sierra Juarez U.S., LLC, Energia Sierra Juarez 2 U.S., LLC, Sempra Gas & Power Marketing, LLC, Termoelectria U.S., LLC. Description: Second Supplement to December 28, 2018 Updated Market Power Analysis for the Southwest Region of Energia Sierra Juarez U.S., LLC, et al. Filed Date: 9/23/19. Accession Number: 20190923–5161. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER18–1442–002. Applicants: Citizens SycamorePenasquitos Transmission LLC. Description: Compliance filing: Compliance Filing in Docket No. ER18– 1442–000 to be effective 12/31/9998. Filed Date: 9/23/19. Accession Number: 20190923–5151. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER18–1822–001. Applicants: California Independent System Operator Corporation. Description: Compliance filing: 2019– 09–24 Compliance Filing to add Citizens Sycamore-Penasquitos to TCA to be effective 9/23/2019. Filed Date: 9/24/19. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 51535 Accession Number: 20190924–5053. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2439–000. Applicants: Tampa Electric Company. Description: Supplement to July 23, 2019 Petition for Waiver of Affiliate Transaction Pricing Rule of Tampa Electric Company. Filed Date: 9/18/19. Accession Number: 20190918–5002. Comments Due: 5 p.m. ET 9/30/19. Docket Numbers: ER19–2852–000. Applicants: Connecticut Yankee Atomic Power Company. Description: § 205(d) Rate Filing: Connecticut Yankee Rate Schedule Revision Filing to be effective 12/1/ 2019. Filed Date: 9/23/19. Accession Number: 20190923–5139. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2853–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Orginal WMPA SA No. 5489; Queue No. AB2–168 to be effective 8/26/2019. Filed Date: 9/23/19. Accession Number: 20190923–5142. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2854–000. Applicants: Maine Yankee Atomic Power Company. Description: § 205(d) Rate Filing: Maine Yankee Rate Schedule Revision Filing to be effective 12/1/2019. Filed Date: 9/23/19. Accession Number: 20190923–5143. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2855–000. Applicants: Yankee Atomic Electric Company. Description: § 205(d) Rate Filing: Yankee Atomic Rate Schedule Revision Filing to be effective 12/1/2019. Filed Date: 9/23/19. Accession Number: 20190923–5144. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2856–000. Applicants: Birchwood Power Partners, L.P. Description: § 205(d) Rate Filing: Reactive Power Rate Schedule to be effective 9/24/2019. Filed Date: 9/23/19. Accession Number: 20190923–5149. Comments Due: 5 p.m. ET 10/15/19. Docket Numbers: ER19–2857–000. Applicants: Southwestern Electric Power Company. Description: § 205(d) Rate Filing: SA777 NTEC Brandy Branch Tap to Darco DPA Amend and Restated to be effective 9/15/2019. Filed Date: 9/23/19. Accession Number: 20190923–5152. Comments Due: 5 p.m. ET 10/15/19. E:\FR\FM\30SEN1.SGM 30SEN1

Agencies

[Federal Register Volume 84, Number 189 (Monday, September 30, 2019)]
[Notices]
[Pages 51534-51535]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21048]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER19-2833-000]


Power Supply Partners, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding of 
Power Supply Partners, LLC's application for market-based rate 
authority, with an accompanying rate tariff, noting that such 
application includes a request for blanket authorization, under 18 CFR 
part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE, Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is October 10, 2019.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the website that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC

[[Page 51535]]

Online service, please email [email protected]. or call (866) 
208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21048 Filed 9-27-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.