Power Supply Partners, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 51534-51535 [2019-21048]
Download as PDF
51534
Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices
90-day Federal Authorization Decision
Deadline—May 9, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the projects’
progress.
Project Descriptions
Acadiana Project
KMLP proposes to install three new
natural gas-fired compressor units
(31,900 horsepower [hp] each) and rewheel two existing compressor units at
its existing Compressor Station 760 in
Acadia Parish, make modifications to
meter piping and new control valves at
its existing Columbia Gulf Meter Station
in Evangeline Parish, as well as install
auxiliary facilities at both locations.
Louisiana Xpress Project
Columbia Gulf proposes to construct
and operate three new greenfield
compressor stations, and modify one
existing compressor station. Each new
compressor station (Shelburn
Compressor Station in East Carroll
Parish, Red Mountain Compressor
Station in Catahoula Parish, and Chicot
Compressor Station in Evangeline
Parish) would include two 23,470 hp
natural gas turbine driven compressors
(totaling 46,940 hp), filter/separators,
gas cooling bays, 48-inch-diameter
suction and 42-inch-diameter discharge
piping, and related appurtenant
facilities.
Modifications to the existing
Alexandria Compressor Station in
Rapides Parish would include
additional cooling bays with associated
piping and appurtenant facilities.
khammond on DSKJM1Z7X2PROD with NOTICES
Background
On August 28, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Acadiana Project and Request
for Comments on Environmental Issues
(NOI). Also on August 28, 2019, the
Commission issued a Notice of Intent to
Prepare an Environmental Assessment
for the Proposed Louisiana Xpress
Project, Request for Comments on
Environmental Issues, and Notice of
Public Scoping Session. The NOIs were
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers.
In response to the NOI for the
Acadiana Project, the Commission
received comments from the Louisiana
Department of Wildlife and Fisheries
and Cheniere Energy. The primary
VerDate Sep<11>2014
19:16 Sep 27, 2019
Jkt 247001
issues raised by the commentors are
potential impacts on the wild coco
orchid. The comment from Cheniere
Energy was a statement in support of the
Acadiana Project. In response to the NOI
for the Louisiana Xpress Project, the
Commission received comments from
SKL Farm Inc., and the Choctaw Nation
of Oklahoma. The primary issues raised
by the commentors are adverse effects of
artificial light, noise, and increased
activity from the proposed compressor
stations. The Choctaw Nation of
Oklahoma requested GIS shapefiles, and
the cultural resource surveys for the
Louisiana Xpress Project. All
substantive comments will be addressed
in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP19–484 or CP19–488), and
follow the instructions. For assistance
with access to eLibrary, the helpline can
be reached at (866) 208–3676, TTY (202)
502–8659, or at FERCOnlineSupport@
ferc.gov. The eLibrary link on the FERC
website also provides access to the texts
of formal documents issued by the
Commission, such as orders, notices,
and rule makings.
Dated: September 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21140 Filed 9–27–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2833–000]
Power Supply Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Power
Supply Partners, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 10,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\30SEN1.SGM
30SEN1
Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21048 Filed 9–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL19–98–000; EL19–99–000]
Notice of Institution of Section 206
Proceeding and Refund Effective Date;
York Haven Power Co., LLC, Lake Lynn
Generation, LLC
On September 20, 2019, the
Commission issued an order in Docket
Nos. EL19–98–000 and EL19–99–000,
pursuant to section 206 of the Federal
Power Act (FPA), 16 U.S.C. 824e (2018),
instituting an investigation into whether
York Haven Power Co., LLC and Lake
Lynn Generation, LLC’s Reactive
Service rate schedules remains just and
reasonable. York Haven Power Co., LLC,
et al., 168 FERC ¶ 61,187 (2019).
The refund effective date in Docket
Nos. EL19–98–000 and EL19–99–000,
established pursuant to section 206(b) of
the FPA, will be the date of publication
of this notice in the Federal Register.
Any interested person desiring to be
heard in Docket Nos. EL19–98–000 and
EL19–99–000 must file a notice of
intervention or motion to intervene, as
appropriate, with the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426, in
accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2019),
within 21 days of the date of issuance
of the order.
Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21046 Filed 9–27–19; 8:45 am]
BILLING CODE 6717–01–P
khammond on DSKJM1Z7X2PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–120–000.
VerDate Sep<11>2014
19:16 Sep 27, 2019
Jkt 247001
Applicants: El Paso Electric Company,
Sun Jupiter Holdings LLC.
Description: Supplement to August
13, 2019 Joint Application for
Authorization Under Section 203 of the
Federal Power Act of El Paso Electric
Company, et al.
Filed Date: 9/23/19.
Accession Number: 20190923–5084.
Comments Due: 5 p.m. ET 10/15/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–187–000.
Applicants: Bronco Plains Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Bronco Plains Wind,
LLC.
Filed Date: 9/20/19.
Accession Number: 20190920–5183.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: EG19–188–000.
Applicants: Poseidon Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Poseidon Wind,
LLC.
Filed Date: 9/23/19.
Accession Number: 20190923–5183.
Comments Due: 5 p.m. ET 10/15/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1470–009;
ER18–836–002; ER10–1290–009; ER16–
1833–005; ER10–3026–008.
Applicants: San Diego Gas & Electric
Company, Energia Sierra Juarez U.S.,
LLC, Energia Sierra Juarez 2 U.S., LLC,
Sempra Gas & Power Marketing, LLC,
Termoelectria U.S., LLC.
Description: Second Supplement to
December 28, 2018 Updated Market
Power Analysis for the Southwest
Region of Energia Sierra Juarez U.S.,
LLC, et al.
Filed Date: 9/23/19.
Accession Number: 20190923–5161.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER18–1442–002.
Applicants: Citizens SycamorePenasquitos Transmission LLC.
Description: Compliance filing:
Compliance Filing in Docket No. ER18–
1442–000 to be effective 12/31/9998.
Filed Date: 9/23/19.
Accession Number: 20190923–5151.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER18–1822–001.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2019–
09–24 Compliance Filing to add
Citizens Sycamore-Penasquitos to TCA
to be effective 9/23/2019.
Filed Date: 9/24/19.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
51535
Accession Number: 20190924–5053.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2439–000.
Applicants: Tampa Electric Company.
Description: Supplement to July 23,
2019 Petition for Waiver of Affiliate
Transaction Pricing Rule of Tampa
Electric Company.
Filed Date: 9/18/19.
Accession Number: 20190918–5002.
Comments Due: 5 p.m. ET 9/30/19.
Docket Numbers: ER19–2852–000.
Applicants: Connecticut Yankee
Atomic Power Company.
Description: § 205(d) Rate Filing:
Connecticut Yankee Rate Schedule
Revision Filing to be effective 12/1/
2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5139.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2853–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Orginal WMPA SA No. 5489; Queue No.
AB2–168 to be effective 8/26/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5142.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2854–000.
Applicants: Maine Yankee Atomic
Power Company.
Description: § 205(d) Rate Filing:
Maine Yankee Rate Schedule Revision
Filing to be effective 12/1/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5143.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2855–000.
Applicants: Yankee Atomic Electric
Company.
Description: § 205(d) Rate Filing:
Yankee Atomic Rate Schedule Revision
Filing to be effective 12/1/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5144.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2856–000.
Applicants: Birchwood Power
Partners, L.P.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule to be
effective 9/24/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5149.
Comments Due: 5 p.m. ET 10/15/19.
Docket Numbers: ER19–2857–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SA777 NTEC Brandy Branch Tap to
Darco DPA Amend and Restated to be
effective 9/15/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5152.
Comments Due: 5 p.m. ET 10/15/19.
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 84, Number 189 (Monday, September 30, 2019)]
[Notices]
[Pages 51534-51535]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21048]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-2833-000]
Power Supply Partners, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Power Supply Partners, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is October 10, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC
[[Page 51535]]
Online service, please email [email protected]. or call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21048 Filed 9-27-19; 8:45 am]
BILLING CODE 6717-01-P