Combined Notice of Filings #1, 51531-51532 [2019-21044]
Download as PDF
Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–1580–000.
Applicants: Greylock Pipeline, LLC.
Description: Compliance filing Notice
of Rates 2019 Oct to be effective 10/1/
2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5026.
Comments Due: 5 p.m. ET 10/2/19.
Docket Numbers: RP19–1581–000.
Applicants: New England NG Supply,
Limited, Boston Gas Company.
Description: Joint Petition for
Temporary Waiver of Commission
Policies, Capacity Release Regulations
and Policies, et al. of New England NG
Supply, Limited, et al. under RP19–
1581.
Filed Date: 9/20/19.
Accession Number: 20190920–5145.
Comments Due: 5 p.m. ET 10/2/19.
Docket Numbers: RP19–1582–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendment to NC Neg Rate Agmt (BP
46441–2) to be effective 9/16/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5054.
Comments Due: 5 p.m. ET 10/7/19.
Docket Numbers: RP19–1583–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: ANR
Centra Negotiated Rate Agreement
Filing to be effective 11/1/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5116.
Comments Due: 5 p.m. ET 10/7/19.
Docket Numbers: RP19–1584–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: ANR
Centra Non-Conforming Amendment to
be effective 4/1/2020.
Filed Date: 9/23/19.
Accession Number: 20190923–5121.
Comments Due: 5 p.m. ET 10/7/19.
Docket Numbers: RP19–1585–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing
Lambertville East (CP18–26) In-Service
Compliance Filing to be effective 11/1/
2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5148.
Comments Due: 5 p.m. ET 10/7/19.
Docket Numbers: RP19–1586–000.
VerDate Sep<11>2014
19:16 Sep 27, 2019
Jkt 247001
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreements Filing
(XTO Energy) to be effective 9/24/2019.
Filed Date: 9/23/19.
Accession Number: 20190923–5154.
Comments Due: 5 p.m. ET 10/7/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 24, 2019.
Nathaniel J. Davis Sr.,
Deputy Secretary.
[FR Doc. 2019–21139 Filed 9–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–139–000.
Applicants: Bethel Wind Energy LLC,
Elk Wind Energy LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Elk Wind Energy
LLC, et al.
Filed Date: 9/19/19.
Accession Number: 20190919–5125.
Comments Due: 5 p.m. ET 10/10/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2138–023;
ER10–2139–023.
Applicants: Grand Ridge Energy II
LLC, Grand Ridge Energy III LLC.
Description: Notice of Change in Facts
Under Market-Based Rate Authority of
Grand Ridge Energy II LLC, et al.
Filed Date: 9/19/19.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
51531
Accession Number: 20190919–5121.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19–1680–002.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
2236R11 GSEC NITSA/NOA—Extension
of Time for FERC Action to be effective
4/1/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5114.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2434–000.
Applicants: Citizens Imperial Solar
LLC.
Description: Supplement to July 22,
2019 Citizens Imperial Solar LLC tariff
filing.
Filed Date: 9/19/19.
Accession Number: 20190919–5122.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19–2534–000.
Applicants: Citizens Energy
Corporation.
Description: Supplement to August 5,
2019 Citizens Energy Corporation tariff
filing.
Filed Date: 9/19/19.
Accession Number: 20190919–5123.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19–2833–000.
Applicants: Power Supply Partners,
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 9/20/2019.
Filed Date: 9/19/19.
Accession Number: 20190919–5112.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19–2834–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amendments to SGIA and LGIA,
Tehachapi Wind Wall, LLC, SA 185/186
to be effective 9/23/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5000.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2835–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–09–20_Attachment X True-up to
Remove Rejected Site Control Language
to be effective 4/24/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5050.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2836–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Camp Lawton Solar LGIA Filing to be
effective 9/6/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5054.
E:\FR\FM\30SEN1.SGM
30SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
51532
Federal Register / Vol. 84, No. 189 / Monday, September 30, 2019 / Notices
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2837–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Peach Blossom Energy III LGIA Filing to
be effective 9/9/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5055.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2838–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Second Revised ISA No. 3840; Queue
No. AD2–167 to be effective 8/21/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5056.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2839–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Orginal WMPA SA No. 5487; Queue No.
AB2–122 to be effective 8/23/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5075.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2840–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: 2019
Amendment to PWRPA SAs, revising
rates based on 2018 demand (SA 30) to
be effective 10/1/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5091.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2841–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217, Exhibit B to be
effective 11/20/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5101.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2842–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended and Restated Victorville-Lugo
Interconnection Agreement, RS FERC
No. 51 to be effective 11/20/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5102.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2843–000.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Cancellation:
Notice of Termination of Elkhorn
Energy Storage E&P Agreement to be
effective 11/19/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5112.
Comments Due: 5 p.m. ET 10/11/19.
VerDate Sep<11>2014
19:16 Sep 27, 2019
Jkt 247001
Docket Numbers: ER19–2844–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
PG&E Elkhorn Energy Storage LGIA (SA
379) to be effective 11/19/2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5113.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2845–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Require Phasor
Measurement Units at New Generator
Interconnections to be effective 11/20/
2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5115.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19–2846–000.
Applicants: Trans Bay Cable LLC.
Description: § 205(d) Rate Filing:
Revisions to Appendix I of the Trans
Bay TO Tariff to be effective 11/23/
2019.
Filed Date: 9/20/19.
Accession Number: 20190920–5131.
Comments Due: 5 p.m. ET 10/11/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–21044 Filed 9–27–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14993–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Premium Energy
Holdings, LLC
On May 9, 2019, Premium Energy
Holdings, LLC, filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Intermountain Pumped Storage
Project (Intermountain Project or
project) to be located on the Sevier River
and Fool Creek, near the city of Delta,
Millard County, Utah. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would be a
closed-loop pumped storage
hydropower facility. The applicant
proposes three alternative upper
reservoirs: Dry Fork Reservoir, Mill
Canyon Reservoir, or Williams
Reservoir. The proposed DMAD 2
Reservoir would be the lower reservoir
for each alternative.
Upper Reservoir Alternative 1: Dry
Fork Reservoir
The Dry Fork Reservoir alternative
consists of: (1) A 277-acre upper
reservoir having a total storage capacity
of 39,612 acre-feet at a normal
maximum operating elevation of 6,200
feet mean sea level (msl); (2) a 370-foothigh, 2,637-foot-long roller compacted
concrete upper reservoir dam; (3) a 1.2mile-long, 38-foot-diameter concretelined headrace tunnel; (4) a 0.16-milelong, 34-foot-diameter concrete-lined
vertical shaft; (5) a 7.05-mile-long, 34foot-diameter concrete-lined horizontal
tunnel; (6) five 0.10-mile-long, 22-footdiameter steel penstocks; (7) a 500-footlong, 125-foot-wide, 150-foot-high
concrete-lined powerhouse located in
an underground cavern, housing five
pump-turbine generator-motor units
rated for 400 megawatts (MW) each; and
(8) a 1.2-mile-long, 40-foot-diameter
concrete-lined tailrace tunnel
discharging into the proposed DMAD 2
Reservoir.
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 84, Number 189 (Monday, September 30, 2019)]
[Notices]
[Pages 51531-51532]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-21044]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-139-000.
Applicants: Bethel Wind Energy LLC, Elk Wind Energy LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Elk Wind Energy LLC, et al.
Filed Date: 9/19/19.
Accession Number: 20190919-5125.
Comments Due: 5 p.m. ET 10/10/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2138-023; ER10-2139-023.
Applicants: Grand Ridge Energy II LLC, Grand Ridge Energy III LLC.
Description: Notice of Change in Facts Under Market-Based Rate
Authority of Grand Ridge Energy II LLC, et al.
Filed Date: 9/19/19.
Accession Number: 20190919-5121.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19-1680-002.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 2236R11 GSEC NITSA/NOA--Extension of
Time for FERC Action to be effective 4/1/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5114.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2434-000.
Applicants: Citizens Imperial Solar LLC.
Description: Supplement to July 22, 2019 Citizens Imperial Solar
LLC tariff filing.
Filed Date: 9/19/19.
Accession Number: 20190919-5122.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19-2534-000.
Applicants: Citizens Energy Corporation.
Description: Supplement to August 5, 2019 Citizens Energy
Corporation tariff filing.
Filed Date: 9/19/19.
Accession Number: 20190919-5123.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19-2833-000.
Applicants: Power Supply Partners, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 9/20/2019.
Filed Date: 9/19/19.
Accession Number: 20190919-5112.
Comments Due: 5 p.m. ET 10/10/19.
Docket Numbers: ER19-2834-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amendments to SGIA and LGIA,
Tehachapi Wind Wall, LLC, SA 185/186 to be effective 9/23/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5000.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2835-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-09-20_Attachment X
True-up to Remove Rejected Site Control Language to be effective 4/24/
2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5050.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2836-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Camp Lawton Solar LGIA
Filing to be effective 9/6/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5054.
[[Page 51532]]
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2837-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Peach Blossom Energy III
LGIA Filing to be effective 9/9/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5055.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2838-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Second Revised ISA No. 3840;
Queue No. AD2-167 to be effective 8/21/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5056.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2839-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Orginal WMPA SA No. 5487;
Queue No. AB2-122 to be effective 8/23/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5075.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2840-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: 2019 Amendment to PWRPA SAs,
revising rates based on 2018 demand (SA 30) to be effective 10/1/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5091.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2841-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Rate Schedule No. 217,
Exhibit B to be effective 11/20/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5101.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2842-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended and Restated
Victorville-Lugo Interconnection Agreement, RS FERC No. 51 to be
effective 11/20/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5102.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2843-000.
Applicants: Pacific Gas and Electric Company.
Description: Tariff Cancellation: Notice of Termination of Elkhorn
Energy Storage E&P Agreement to be effective 11/19/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5112.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2844-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: PG&E Elkhorn Energy Storage
LGIA (SA 379) to be effective 11/19/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5113.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2845-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Require Phasor
Measurement Units at New Generator Interconnections to be effective 11/
20/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5115.
Comments Due: 5 p.m. ET 10/11/19.
Docket Numbers: ER19-2846-000.
Applicants: Trans Bay Cable LLC.
Description: Sec. 205(d) Rate Filing: Revisions to Appendix I of
the Trans Bay TO Tariff to be effective 11/23/2019.
Filed Date: 9/20/19.
Accession Number: 20190920-5131.
Comments Due: 5 p.m. ET 10/11/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 20, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-21044 Filed 9-27-19; 8:45 am]
BILLING CODE 6717-01-P