Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; Isabella Wind, LLC, 50025-50026 [2019-20625]
Download as PDF
Federal Register / Vol. 84, No. 185 / Tuesday, September 24, 2019 / Notices
the information needed in an efficient
manner. This collection includes
burden at the SEA level.
Dated: September 19, 2019.
Kate Mullan,
PRA Coordinator, Information Collection
Clearance Program, Information Management
Branch, Office of the Chief Information
Officer.
[FR Doc. 2019–20663 Filed 9–23–19; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14999–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Four Lakes Task Force
On June 20, 2019, Four Lakes Task
Force filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Edenville
Dam Hydroelectric Project located on
the Tittabawassee and Tobacco River
system approximately one mile north of
Edenville, in Gladwin and Midland
Counties, Michigan. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The project is located immediately
upstream of the confluence of
Tittabawassee and Tobacco rivers and
would consist of the following facilities:
(1) A 6-square-mile, 40,000 acre-feet at
normal maximum surface elevation of
676.1 National Geodetic Vertical Datum
29 (NGVD29) existing reservoir (Wixom
Lake); (2) a 6,200.0-foot-long existing
earthen gravity dam with a minimum
crest elevation of 682.1 feet NGVD29
including: (i) a 625.0-foot-long left
(south-east) embankment; (ii) a 68.6foot-wide spillway containing two 20.0foot-wide by 9.5-foot-high steel Tainter
gates and one 23.6-foot-wide by 9.5-foothigh steel Tainter gate each with a sill
elevation of 667.8 feet NGVD29; (iii) a
50.5-foot-wide, 114.7-foot-long existing
concrete and steel powerhouse
containing two 2.4 megawatts (MW)
turbine-generators; (iv) a 3,428.7-footlong center section embankment; (v) a
60.0-foot-wide, 60.0-foot-long new
VerDate Sep<11>2014
17:37 Sep 23, 2019
Jkt 247001
concrete and steel powerhouse
containing one 1.2 MW turbinegenerator; (vi) a 72.2-foot-wide spillway
containing two 23.6-foot-wide by 9.5foot-high steel Tainter gates and one
20.0-foot-wide by 9.5-foot-high steel
Tainter gate each with a sill elevation of
667.8 feet NGVD29; and (vii) a 1,895.0foot-long right (west) embankment; (3) a
50.6 to 65.0-foot-wide, 47.0-foot-long
tailrace; (4) an 800-foot-long, 2.3
kilovolt existing transmission line
conveying the project power to
Edenville Dam Substation owned by
Consumers Energy; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 21,000
megawatt-hours.
Applicant Contact: David E. Kepler,
II, Four Lakes Task Force, 233 E. Larkin
St., Suite 2, Midland, MI 48640; phone:
(989) 636–7701.
FERC Contact: Sergiu Serban; phone:
(202) 502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14999–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14999) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20628 Filed 9–23–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
50025
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2823–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization; Isabella Wind, LLC
This is a supplemental notice in the
above-referenced proceeding of Isabella
Wind, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is October 8,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
E:\FR\FM\24SEN1.SGM
24SEN1
50026
Federal Register / Vol. 84, No. 185 / Tuesday, September 24, 2019 / Notices
Docket Numbers: ER18–1266–002.
Applicants: Moxie Freedom LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Dated: September 18, 2019.
Filed Date: 9/18/19.
Nathaniel J. Davis, Sr.,
Accession Number: 20190918–5125.
Deputy Secretary.
Comments Due: 5 p.m. ET 10/9/19.
[FR Doc. 2019–20625 Filed 9–23–19; 8:45 am]
Docket Numbers: ER19–470–002.
BILLING CODE 6717–01–P
Applicants: ISO New England Inc.,
Eversource Energy Service Company.
Description: Compliance filing:
DEPARTMENT OF ENERGY
Update Eff Date of Previously Filed
Revisions Implementing Trans. Chrg
Federal Energy Regulatory
Exemption to be effective 12/1/2019.
Commission
Filed Date: 9/18/19.
Combined Notice of Filings #1
Accession Number: 20190918–5139.
Comments Due: 5 p.m. ET 10/9/19.
Take notice that the Commission
Docket Numbers: ER19–2276–001.
received the following electric rate
Applicants: New York Independent
filings:
System Operator, Inc.
Docket Numbers: ER10–1818–018.
Description: Tariff Amendment:
Applicants: Public Service Company
NYISO response to deficiency letter re:
of Colorado.
June 27, 2019 DER filing to be effective
Description: Supplement to January
5/1/2020.
11, 2019 Triennial MBR Update
Filed Date: 9/18/19.
(Treatment of TRM/CBM in SIL Study)
Accession Number: 20190918–5138.
of Public Service Company of Colorado.
Comments Due: 5 p.m. ET 10/9/19.
Filed Date: 9/17/19.
Docket Numbers: ER19–2825–000.
Accession Number: 20190917–5140.
Applicants: Southwest Power Pool,
Comments Due: 5 p.m. ET 10/8/19.
Inc.
Docket Numbers: ER15–1456–008;
Description: § 205(d) Rate Filing:
ER10–2959–015; ER11–3859–019;
Western Area Power Administration
ER19–967–002; ER15–748–005; ER16–
Contract Services Agreement
999–009; ER11–4634–008; ER10–2934–
Amendment to be effective 11/16/2019.
014; ER19–968–002; ER18–920–004;
Filed Date: 9/17/19.
ER17–436–007; ER14–1699–009; ER10–
Accession Number: 20190917–5115.
2615–013; ER11–2335–014; ER10–1933–
Comments Due: 5 p.m. ET 10/8/19.
006; ER15–1457–008; ER19–464–001.
Docket Numbers: ER19–2826–000.
Applicants: Beaver Falls, L.L.C.,
Applicants: PJM Interconnection,
Chambers Cogeneration, Limited
L.L.C.
Partnership, Dighton Power, LLC,
Description: § 205(d) Rate Filing:
Fairless Energy, L.L.C., Garrison Energy
Amendment to WMPA SA No. 5128,
Center LLC, Greenleaf Energy Unit 1
Queue No. AD1–156 to be effective 6/
LLC, Hazleton Generation LLC, Logan
15/2018.
Generating Company, L.P., Manchester
Filed Date: 9/17/19.
Street, L.L.C., Marco DM Holdings,
Accession Number: 20190917–5121.
L.L.C., Marcus Hook Energy, L.P.,
Comments Due: 5 p.m. ET 10/8/19.
Milford Power, LLC, Plum Point Energy
Docket Numbers: ER19–2827–000.
Associates, LLC, Plum Point Services
Applicants: Southwest Power Pool,
Company, LLC, RockGen Energy, LLC,
Inc.
Syracuse, L.L.C., Vermillion Power,
Description: § 205(d) Rate Filing:
L.L.C.
Description: Supplement to August 8, 2987R1 Associated Electric/PSC of OK/
KAMO Electric Inter Agr to be effective
2019 Notice of Change in Status of the
9/16/2019.
SEG MBR Entities, et al.
Filed Date: 9/18/19.
Filed Date: 9/11/19.
Accession Number: 20190918–5010.
Accession Number: 20190911–5143.
Comments Due: 5 p.m. ET 10/2/19.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ER17–802–006.
Docket Numbers: ER19–2828–000.
Applicants: Exelon Generation
Applicants: AEP Ohio Transmission
Company, LLC.
Company, Inc., Ohio Power Company,
Description: Compliance filing:
PJM Interconnection, L.L.C.
Informational Filing Regarding
Description: § 205(d) Rate Filing: AEP
Mothballing of SE Chicago Energy
Ohio submits Revised ILDSA, SA No.
Project Units to be effective N/A.
1336 and 8 Facilities Agreements to be
Filed Date: 9/18/19.
effective 8/21/2019.
Accession Number: 20190918–5076.
Filed Date: 9/18/19.
Comments Due: 5 p.m. ET 10/9/19.
Accession Number: 20190918–5059.
khammond on DSKJM1Z7X2PROD with NOTICES
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
VerDate Sep<11>2014
17:37 Sep 23, 2019
Jkt 247001
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ER19–2829–000.
Applicants: Phalanx Energy Services,
LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective 9/
19/2019.
Filed Date: 9/18/19.
Accession Number: 20190918–5075.
Comments Due: 5 p.m. ET 10/9/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–55–000.
Applicants: ITC Great Plains, LLC.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Extend Maturity of
Revolving Credit Facility of ITC Great
Plains, LLC.
Filed Date: 9/18/19.
Accession Number: 20190918–5110.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ES19–56–000.
Applicants: ITC Midwest LLC.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Extend Maturity of
Revolving Credit Facility of ITC
Midwest LLC.
Filed Date: 9/18/19.
Accession Number: 20190918–5113.
Comments Due: 5 p.m. ET 10/9/19.
Docket Numbers: ES19–57–000.
Applicants: International
Transmission Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Extend Maturity of
Revolving Credit Facility of
International Transmission Company.
Filed Date: 9/18/19.
Accession Number: 20190918–5124.
Comments Due: 5 p.m. ET 10/9/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 84, Number 185 (Tuesday, September 24, 2019)]
[Notices]
[Pages 50025-50026]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20625]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER19-2823-000]
Supplemental Notice That Initial Market-Based Rate Filing
Includes Request for Blanket Section 204 Authorization; Isabella Wind,
LLC
This is a supplemental notice in the above-referenced proceeding of
Isabella Wind, LLC's application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is October 8, 2019.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the website that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
[[Page 50026]]
[email protected]. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: September 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20625 Filed 9-23-19; 8:45 am]