Sunshine Act Meetings; Notice of Vote, Explanation of Action Closing Meeting and List of Persons To Attend, 49722 [2019-20626]

Download as PDF 49722 Federal Register / Vol. 84, No. 184 / Monday, September 23, 2019 / Notices 41st Lane, Phoenix, AZ 85041; phone: (602) 696–3608. FERC Contact: Tim Konnert; phone: (202) 502–6359. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14992–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14992) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: September 17, 2019. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meetings; Notice of Vote, Explanation of Action Closing Meeting and List of Persons To Attend jbell on DSK3GLQ082PROD with NOTICES Kimberly D. Bose, Secretary, Telephone (202) 502–8400. Chairman Chatterjee and Commissioners Glick, and McNamee voted to hold a closed meeting on September 25, 2019. The certification of the General Counsel explaining the action closing the meeting is available for public inspection in the Commission’s Public Reference Room at 888 First Street NE, Washington, DC 20426. The Chairman and the Commissioners, the General Counsel, and members of their staff, members of the Nuclear Regulatory Commission, and members of their staff are expected to attend the meeting. Other staff members from the Commission’s program offices who will advise the Commissioners in the matters discussed will also be present. Issued: September 18, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–20626 Filed 9–19–19; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Pumped Hydro Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications BILLING CODE 6717–01–P The following notice of meeting is published pursuant to Section 3(a) of the Government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. TIME AND DATE: September 25, 2019. *NOTE—The Closed meeting will follow the Joint meeting of the Federal 17:55 Sep 20, 2019 CONTACT PERSON FOR MORE INFORMATION: [Project No. 14990–000] [FR Doc. 2019–20503 Filed 9–20–19; 8:45 am] VerDate Sep<11>2014 Energy Regulatory Commission and the Nuclear Regulatory Commission.1 PLACE: U.S. Nuclear Regulatory Commission, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852. STATUS: Closed. MATTERS TO BE CONSIDERED: Non-Public Investigations and Inquiries, Enforcement Related Matters. Jkt 247001 On May 3, 2019, Pumped Hydro Storage, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a closed loop pumped storage project in Maricopa County, Arizona. On August 1, 2019, the applicant filed a revised application for the project to address Commission staff’s June 19, 2019 comments. The sole purpose of a preliminary permit, if issued, is to grant 1 See Notice of Joint Meeting of the Federal Energy Regulatory Commission and the Nuclear Regulatory Commission, September 18, 2019. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Salt River Project Indian Spring Pumped Storage Project would consist of the following: (1) A new 240-foot-high, 1,000-foot-long upper dam and reservoir; (2) a new 260foot-high, 2,200-foot-long lower dam and reservoir; (3) six 250-megawatt, turbine-generator units, for a total installed capacity of 1,500 megawatts; (4) a new 200-foot-long, 345-kilovolt transmission line from the powerhouse to an existing grid interconnection point; and (5) appurtenant facilities. The proposed project would have an average annual generation of 3,285 gigawatthours. Applicant Contact: Steve Irwin, Pumped Hydro Storage, LLC, 6514 S 41st Lane, Phoenix, AZ 85041; phone: (602) 696–3608. FERC Contact: Tim Konnert; phone: (202) 502–6359. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14990–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14990) in the docket number field to access the document. For assistance, contact FERC Online Support. E:\FR\FM\23SEN1.SGM 23SEN1

Agencies

[Federal Register Volume 84, Number 184 (Monday, September 23, 2019)]
[Notices]
[Page 49722]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20626]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meetings; Notice of Vote, Explanation of Action 
Closing Meeting and List of Persons To Attend

    The following notice of meeting is published pursuant to Section 
3(a) of the Government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:

Agency Holding Meeting:  Federal Energy Regulatory Commission.

TIME AND DATE: September 25, 2019.
    *NOTE--The Closed meeting will follow the Joint meeting of the 
Federal Energy Regulatory Commission and the Nuclear Regulatory 
Commission.\1\
---------------------------------------------------------------------------

    \1\ See Notice of Joint Meeting of the Federal Energy Regulatory 
Commission and the Nuclear Regulatory Commission, September 18, 
2019.

PLACE: U.S. Nuclear Regulatory Commission, One White Flint North, 11555 
---------------------------------------------------------------------------
Rockville Pike, Rockville, MD 20852.

STATUS: Closed.

MATTERS TO BE CONSIDERED: Non-Public Investigations and Inquiries, 
Enforcement Related Matters.

CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    Chairman Chatterjee and Commissioners Glick, and McNamee voted to 
hold a closed meeting on September 25, 2019. The certification of the 
General Counsel explaining the action closing the meeting is available 
for public inspection in the Commission's Public Reference Room at 888 
First Street NE, Washington, DC 20426.
    The Chairman and the Commissioners, the General Counsel, and 
members of their staff, members of the Nuclear Regulatory Commission, 
and members of their staff are expected to attend the meeting. Other 
staff members from the Commission's program offices who will advise the 
Commissioners in the matters discussed will also be present.

    Issued: September 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20626 Filed 9-19-19; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.