Pumped Hydro Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 49721-49722 [2019-20503]
Download as PDF
Federal Register / Vol. 84, No. 184 / Monday, September 23, 2019 / Notices
applicants should need to achieve at a
minimum to be considered for
selection?
5. What are ambitious but achievable
targets for plant-level and/or systemlevel energy efficiency improvements
for recovery of clean water, nutrients
and other resources?
6. What metrics are appropriate to
assess the financial viability of a
submission as part of phase two
judging?
7. How should DOE assess the
innovativeness of prize applications?
jbell on DSK3GLQ082PROD with NOTICES
Request for Information Response
Guidelines
Responses to this RFI must be
submitted electronically to
WaterResourceRecoveryPrize@
ee.doe.gov no later than 5:00 p.m. (ET)
on October 23, 2019. Responses must be
provided as attachments to an email. It
is recommended that attachments with
file sizes exceeding 25MB be
compressed (i.e., zipped) to ensure
message delivery. Responses must be
provided as a Microsoft Word (.docx)
attachment to the email, and no more
than 20 pages in length, 12 point font,
1 inch margins. Only electronic
responses will be accepted.
Please identify your answers by
responding to a specific question or
topic if applicable. Respondents may
answer as many or as few questions as
they wish.
EERE will not respond to individual
submissions or publish publicly a
compendium of responses. A response
to this RFI will not be viewed as a
binding commitment to develop or
pursue the project or ideas discussed.
This is solely a request for information
and not an announcement for a prize
competition. EERE is not accepting
applications or submissions for a
potential prize competition. If EERE
pursues the potential prize competition,
it would be announced through a
separate solicitation.
Respondents are requested to provide
the following information at the start of
their response to this RFI:
• Company/institution name;
• Company/institution contact;
• Contact’s address, phone number,
and email address.
Confidential Business Information
Pursuant to 10 CFR 1004.11, any
person submitting information that he
or she believes to be confidential and
exempt by law from public disclosure
should submit via email two well
marked copies: One copy of the
document marked ‘‘confidential’’
including all the information believed to
be confidential, and one copy of the
VerDate Sep<11>2014
17:55 Sep 20, 2019
Jkt 247001
49721
document marked ‘‘non-confidential’’
with the information believed to be
confidential deleted. DOE will make its
own determination about the
confidential status of the information
and treat it according to its
determination.
Factors of interest to DOE when
evaluating requests to treat submitted
information as confidential include: (1)
A description of the items; (2) whether
and why such items are customarily
treated as confidential within the
industry; (3) whether the information is
generally known by or available from
other sources; (4) whether the
information has previously been made
available to others without obligation
concerning its confidentiality; (5) an
explanation of the competitive injury to
the submitting person that would result
from public disclosure; (6) when such
information might lose its confidential
character due to the passage of time; and
(7) why disclosure of the information
would be contrary to the public interest.
Correction
In the Federal Register of September
17, 2019, in FR Doc. 2019–20114, on
page 48921, please make the following
correction:
In that notice under Tentative
Agenda, third column, first paragraph,
the presentation topic has been
changed. The original presentation topic
was Processing of Uranium 233
Materials. The new presentation topic is
Groundwater Update.
Signed in Washington, DC, on August 30,
2019.
Valri Lightner,
Deputy Director, Advanced Manufacturing
Office.
Pumped Hydro Storage, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
[FR Doc. 2019–20541 Filed 9–20–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Oak Ridge;
Meeting; Correction
Office of Environmental
Management, Department of Energy.
AGENCY:
Notice of open meeting:
correction.
ACTION:
On September 17, 2019, the
Department of Energy published a
notice of open meeting announcing a
meeting on October 9, 2019, of the
Environmental Management SiteSpecific Advisory Board, Oak Ridge.
This document makes a correction to
that notice.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Melyssa P. Noe, Alternate Deputy
Designated Federal Officer, U.S.
Department of Energy, Oak Ridge Office
of Environmental Management (OREM),
P.O. Box 2001, EM–942, Oak Ridge, TN
37831. Phone (865) 241–3315; Fax (865)
241–6932; Email: Melyssa.Noe@
orem.doe.gov. Or visit the website at
https://energy.gov/orem/services/
community-engagement/oak-ridge-sitespecific-advisory-board.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Signed in Washington, DC, on September
18, 2019.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2019–20470 Filed 9–20–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14992–000]
On May 8, 2019, Pumped Hydro
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
pumped storage project in Coconino
County, Arizona. On August 1, 2019, the
applicant filed a revised application for
the project to address Commission
staff’s June 19, 2019 comments. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Navajo Nation Salt
Trail Canyon Pumped Storage Project
would consist of the following: (1) A
new 240-foot-high, 500-foot-long upper
dam and reservoir; (2) a new 140-foothigh, 1,000-foot-long lower dam and
reservoir; (3) six 250- megawatt, turbinegenerator units, for a total installed
capacity of 1,500 megawatts; (4) a new
20-mile-long, 500-kilovolt transmission
line from the powerhouse to the existing
Moenkopi switchyard; and (5)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,300 gigawatt-hours.
Applicant Contact: Steve Irwin,
Pumped Hydro Storage, LLC, 6514 S
E:\FR\FM\23SEN1.SGM
23SEN1
49722
Federal Register / Vol. 84, No. 184 / Monday, September 23, 2019 / Notices
41st Lane, Phoenix, AZ 85041; phone:
(602) 696–3608.
FERC Contact: Tim Konnert; phone:
(202) 502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14992–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14992) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 17, 2019.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings; Notice of Vote,
Explanation of Action Closing Meeting
and List of Persons To Attend
jbell on DSK3GLQ082PROD with NOTICES
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
Chairman Chatterjee and
Commissioners Glick, and McNamee
voted to hold a closed meeting on
September 25, 2019. The certification of
the General Counsel explaining the
action closing the meeting is available
for public inspection in the
Commission’s Public Reference Room at
888 First Street NE, Washington, DC
20426.
The Chairman and the
Commissioners, the General Counsel,
and members of their staff, members of
the Nuclear Regulatory Commission,
and members of their staff are expected
to attend the meeting. Other staff
members from the Commission’s
program offices who will advise the
Commissioners in the matters discussed
will also be present.
Issued: September 18, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20626 Filed 9–19–19; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Pumped Hydro Storage, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
BILLING CODE 6717–01–P
The following notice of meeting is
published pursuant to Section 3(a) of
the Government in the Sunshine Act
(Pub. L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE: September 25, 2019.
*NOTE—The Closed meeting will
follow the Joint meeting of the Federal
17:55 Sep 20, 2019
CONTACT PERSON FOR MORE INFORMATION:
[Project No. 14990–000]
[FR Doc. 2019–20503 Filed 9–20–19; 8:45 am]
VerDate Sep<11>2014
Energy Regulatory Commission and the
Nuclear Regulatory Commission.1
PLACE: U.S. Nuclear Regulatory
Commission, One White Flint North,
11555 Rockville Pike, Rockville, MD
20852.
STATUS: Closed.
MATTERS TO BE CONSIDERED: Non-Public
Investigations and Inquiries,
Enforcement Related Matters.
Jkt 247001
On May 3, 2019, Pumped Hydro
Storage, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
closed loop pumped storage project in
Maricopa County, Arizona. On August
1, 2019, the applicant filed a revised
application for the project to address
Commission staff’s June 19, 2019
comments. The sole purpose of a
preliminary permit, if issued, is to grant
1 See Notice of Joint Meeting of the Federal
Energy Regulatory Commission and the Nuclear
Regulatory Commission, September 18, 2019.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed Salt River Project
Indian Spring Pumped Storage Project
would consist of the following: (1) A
new 240-foot-high, 1,000-foot-long
upper dam and reservoir; (2) a new 260foot-high, 2,200-foot-long lower dam
and reservoir; (3) six 250-megawatt,
turbine-generator units, for a total
installed capacity of 1,500 megawatts;
(4) a new 200-foot-long, 345-kilovolt
transmission line from the powerhouse
to an existing grid interconnection
point; and (5) appurtenant facilities. The
proposed project would have an average
annual generation of 3,285 gigawatthours.
Applicant Contact: Steve Irwin,
Pumped Hydro Storage, LLC, 6514 S
41st Lane, Phoenix, AZ 85041; phone:
(602) 696–3608.
FERC Contact: Tim Konnert; phone:
(202) 502–6359.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14990–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14990) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
E:\FR\FM\23SEN1.SGM
23SEN1
Agencies
[Federal Register Volume 84, Number 184 (Monday, September 23, 2019)]
[Notices]
[Pages 49721-49722]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20503]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14992-000]
Pumped Hydro Storage, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 8, 2019, Pumped Hydro Storage, LLC, filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a pumped storage project
in Coconino County, Arizona. On August 1, 2019, the applicant filed a
revised application for the project to address Commission staff's June
19, 2019 comments. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed Navajo Nation Salt Trail Canyon Pumped Storage Project
would consist of the following: (1) A new 240-foot-high, 500-foot-long
upper dam and reservoir; (2) a new 140-foot-high, 1,000-foot-long lower
dam and reservoir; (3) six 250- megawatt, turbine-generator units, for
a total installed capacity of 1,500 megawatts; (4) a new 20-mile-long,
500-kilovolt transmission line from the powerhouse to the existing
Moenkopi switchyard; and (5) appurtenant facilities. The proposed
project would have an average annual generation of 3,300 gigawatt-
hours.
Applicant Contact: Steve Irwin, Pumped Hydro Storage, LLC, 6514 S
[[Page 49722]]
41st Lane, Phoenix, AZ 85041; phone: (602) 696-3608.
FERC Contact: Tim Konnert; phone: (202) 502-6359.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14992-000.
More information about this project, including a copy of the
application, can be viewed or printed on the eLibrary link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14992) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 17, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20503 Filed 9-20-19; 8:45 am]
BILLING CODE 6717-01-P