Southern California Edison; Notice of Request To Expedite Study Plan Determination Process Through Waiver of Pre-Filing Requirements, 49519 [2019-20389]
Download as PDF
Federal Register / Vol. 84, No. 183 / Friday, September 20, 2019 / Notices
Applicants: Bluestone Solar, LLC,
Chisago Holdco LLC, CMR Solar, LLC,
Frontenac Holdco LLC, Montevideo
Solar LLC, Sartell Solar LLC, Underhill
Solar, LLC.
Description: Refund Report of
Bluestone Solar, LLC, et al.
Filed Date: 9/13/19.
Accession Number: 20190913–5172.
Comments Due: 5 p.m. ET 10/4/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–20386 Filed 9–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1394–080]
khammond on DSKJM1Z7X2PROD with NOTICES
Southern California Edison; Notice of
Request To Expedite Study Plan
Determination Process Through
Waiver of Pre-Filing Requirements
a. Type of Filing: Request to Expedite
Study Plan Determination Process
through Waiver of Pre-Filing
Requirements.
b. Project No.: 1394–080.
c. Dated Filed: September 4, 2019.
d. Submitted By: Southern California
Edison (SCE).
e. Name of Project: Bishop Creek
Hydroelectric Project.
f. Location: On Bishop Creek in Inyo
County, California. The project occupies
approximately 734 acres of federal land
administered by the U.S. Forest Service
and approximately 48 acres of federal
land administered by the U.S. Bureau of
Land Management.
g. Applicant Contact: Matthew
Woodhall, Project Lead, Southern
VerDate Sep<11>2014
17:13 Sep 19, 2019
Jkt 247001
California Edison Company, 1515
Walnut Grove Avenue, Rosemead, CA
91770.
h. FERC Contact: Kelly Wolcott at
(202) 502–6480 or email at:
kelly.wolcott@ferc.gov.
i. On September 4, 2019, SCE filed a
request for the Commission to expedite
the study plan determination process by
waiving certain pre-filing study plan
development requirements under Part 5
of the Commission’s regulations for the
existing Bishop Creek Hydroelectric
Project. Specifically, SCE requests that
the Commission waive the requirement
for: A proposed study plan; 1 study plan
meetings; 2 and comments on the
proposed study plan.3 SCE states that
the waiver would shorten the study plan
determination process by four months,
and that the expedited process and
associated waiver would allow more
time for SCE and the stakeholders to
collaboratively assess project effects and
develop proposed license conditions
during the pre-filing period. SCE adds
that they have met the intent of these
regulations through early collaborative
efforts with stakeholders in developing
the technical study plans included in its
Pre-Application Document filed May 1,
2019.4
With this notice we are soliciting
comments on SCE’s request to expedite
the study plan determination process
through waiver of certain pre-filing
requirements. All comments should be
sent to the address in paragraph k
below.
j. The waiver request and associated
filings are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph g.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
1 18
CFR 5.11 (a)–(d) (2019).
CFR 5.11 (e) (2019).
3 18 CFR 5.12 (2019).
4 SCE filed updated technical study plans on
August 29, 2019, that address comments received
from stakeholders and FERC staff during the
scoping process.
2 18
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
49519
k. The Commission strongly
encourages electronic filing. Please file
all documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–1394–080.
All filings with the Commission must
bear the appropriate heading: Comments
on Waiver Request. Any individual or
entity interested in submitting NOI
comments must do so by October 1,
2019.
Dated: September 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–20389 Filed 9–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–95–000]
Portland General Electric Company;
Notice of Petition for Declaratory Order
Take notice that on September 9,
2019, pursuant to Rule 207 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.207
(2019), Portland General Electric
Company (Portland General or
Petitioner) filed a petition for the
Commission to issue a declaratory order
approving Portland General’s proposal
to reclassify, as transmission assets,
certain 115 kV and 57 kV facilities
currently classified as distribution
plant, as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
theproceeding. Any person wishing to
become a party must file a notice of
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 84, Number 183 (Friday, September 20, 2019)]
[Notices]
[Page 49519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20389]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1394-080]
Southern California Edison; Notice of Request To Expedite Study
Plan Determination Process Through Waiver of Pre-Filing Requirements
a. Type of Filing: Request to Expedite Study Plan Determination
Process through Waiver of Pre-Filing Requirements.
b. Project No.: 1394-080.
c. Dated Filed: September 4, 2019.
d. Submitted By: Southern California Edison (SCE).
e. Name of Project: Bishop Creek Hydroelectric Project.
f. Location: On Bishop Creek in Inyo County, California. The
project occupies approximately 734 acres of federal land administered
by the U.S. Forest Service and approximately 48 acres of federal land
administered by the U.S. Bureau of Land Management.
g. Applicant Contact: Matthew Woodhall, Project Lead, Southern
California Edison Company, 1515 Walnut Grove Avenue, Rosemead, CA
91770.
h. FERC Contact: Kelly Wolcott at (202) 502-6480 or email at:
[email protected].
i. On September 4, 2019, SCE filed a request for the Commission to
expedite the study plan determination process by waiving certain pre-
filing study plan development requirements under Part 5 of the
Commission's regulations for the existing Bishop Creek Hydroelectric
Project. Specifically, SCE requests that the Commission waive the
requirement for: A proposed study plan; \1\ study plan meetings; \2\
and comments on the proposed study plan.\3\ SCE states that the waiver
would shorten the study plan determination process by four months, and
that the expedited process and associated waiver would allow more time
for SCE and the stakeholders to collaboratively assess project effects
and develop proposed license conditions during the pre-filing period.
SCE adds that they have met the intent of these regulations through
early collaborative efforts with stakeholders in developing the
technical study plans included in its Pre-Application Document filed
May 1, 2019.\4\
---------------------------------------------------------------------------
\1\ 18 CFR 5.11 (a)-(d) (2019).
\2\ 18 CFR 5.11 (e) (2019).
\3\ 18 CFR 5.12 (2019).
\4\ SCE filed updated technical study plans on August 29, 2019,
that address comments received from stakeholders and FERC staff
during the scoping process.
---------------------------------------------------------------------------
With this notice we are soliciting comments on SCE's request to
expedite the study plan determination process through waiver of certain
pre-filing requirements. All comments should be sent to the address in
paragraph k below.
j. The waiver request and associated filings are available for
review at the Commission in the Public Reference Room or may be viewed
on the Commission's website (https://www.ferc.gov), using the eLibrary
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). A copy is also available for inspection
and reproduction at the address in paragraph g.
Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
k. The Commission strongly encourages electronic filing. Please
file all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected]. In lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-1394-080.
All filings with the Commission must bear the appropriate heading:
Comments on Waiver Request. Any individual or entity interested in
submitting NOI comments must do so by October 1, 2019.
Dated: September 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20389 Filed 9-19-19; 8:45 am]