Download as PDF Federal Register / Vol. 84, No. 183 / Friday, September 20, 2019 / Notices Applicants: Bluestone Solar, LLC, Chisago Holdco LLC, CMR Solar, LLC, Frontenac Holdco LLC, Montevideo Solar LLC, Sartell Solar LLC, Underhill Solar, LLC. Description: Refund Report of Bluestone Solar, LLC, et al. Filed Date: 9/13/19. Accession Number: 20190913–5172. Comments Due: 5 p.m. ET 10/4/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20386 Filed 9–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1394–080] khammond on DSKJM1Z7X2PROD with NOTICES Southern California Edison; Notice of Request To Expedite Study Plan Determination Process Through Waiver of Pre-Filing Requirements a. Type of Filing: Request to Expedite Study Plan Determination Process through Waiver of Pre-Filing Requirements. b. Project No.: 1394–080. c. Dated Filed: September 4, 2019. d. Submitted By: Southern California Edison (SCE). e. Name of Project: Bishop Creek Hydroelectric Project. f. Location: On Bishop Creek in Inyo County, California. The project occupies approximately 734 acres of federal land administered by the U.S. Forest Service and approximately 48 acres of federal land administered by the U.S. Bureau of Land Management. g. Applicant Contact: Matthew Woodhall, Project Lead, Southern VerDate Sep<11>2014 17:13 Sep 19, 2019 Jkt 247001 California Edison Company, 1515 Walnut Grove Avenue, Rosemead, CA 91770. h. FERC Contact: Kelly Wolcott at (202) 502–6480 or email at: kelly.wolcott@ferc.gov. i. On September 4, 2019, SCE filed a request for the Commission to expedite the study plan determination process by waiving certain pre-filing study plan development requirements under Part 5 of the Commission’s regulations for the existing Bishop Creek Hydroelectric Project. Specifically, SCE requests that the Commission waive the requirement for: A proposed study plan; 1 study plan meetings; 2 and comments on the proposed study plan.3 SCE states that the waiver would shorten the study plan determination process by four months, and that the expedited process and associated waiver would allow more time for SCE and the stakeholders to collaboratively assess project effects and develop proposed license conditions during the pre-filing period. SCE adds that they have met the intent of these regulations through early collaborative efforts with stakeholders in developing the technical study plans included in its Pre-Application Document filed May 1, 2019.4 With this notice we are soliciting comments on SCE’s request to expedite the study plan determination process through waiver of certain pre-filing requirements. All comments should be sent to the address in paragraph k below. j. The waiver request and associated filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph g. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. 1 18 CFR 5.11 (a)–(d) (2019). CFR 5.11 (e) (2019). 3 18 CFR 5.12 (2019). 4 SCE filed updated technical study plans on August 29, 2019, that address comments received from stakeholders and FERC staff during the scoping process. 2 18 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 49519 k. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1394–080. All filings with the Commission must bear the appropriate heading: Comments on Waiver Request. Any individual or entity interested in submitting NOI comments must do so by October 1, 2019. Dated: September 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20389 Filed 9–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–95–000] Portland General Electric Company; Notice of Petition for Declaratory Order Take notice that on September 9, 2019, pursuant to Rule 207 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207 (2019), Portland General Electric Company (Portland General or Petitioner) filed a petition for the Commission to issue a declaratory order approving Portland General’s proposal to reclassify, as transmission assets, certain 115 kV and 57 kV facilities currently classified as distribution plant, as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to theproceeding. Any person wishing to become a party must file a notice of E:\FR\FM\20SEN1.SGM 20SEN1

Agencies

[Federal Register Volume 84, Number 183 (Friday, September 20, 2019)]
[Notices]
[Page 49519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20389]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1394-080]


Southern California Edison; Notice of Request To Expedite Study 
Plan Determination Process Through Waiver of Pre-Filing Requirements

    a. Type of Filing: Request to Expedite Study Plan Determination 
Process through Waiver of Pre-Filing Requirements.
    b. Project No.: 1394-080.
    c. Dated Filed: September 4, 2019.
    d. Submitted By: Southern California Edison (SCE).
    e. Name of Project: Bishop Creek Hydroelectric Project.
    f. Location: On Bishop Creek in Inyo County, California. The 
project occupies approximately 734 acres of federal land administered 
by the U.S. Forest Service and approximately 48 acres of federal land 
administered by the U.S. Bureau of Land Management.
    g. Applicant Contact: Matthew Woodhall, Project Lead, Southern 
California Edison Company, 1515 Walnut Grove Avenue, Rosemead, CA 
91770.
    h. FERC Contact: Kelly Wolcott at (202) 502-6480 or email at: 
[email protected].
    i. On September 4, 2019, SCE filed a request for the Commission to 
expedite the study plan determination process by waiving certain pre-
filing study plan development requirements under Part 5 of the 
Commission's regulations for the existing Bishop Creek Hydroelectric 
Project. Specifically, SCE requests that the Commission waive the 
requirement for: A proposed study plan; \1\ study plan meetings; \2\ 
and comments on the proposed study plan.\3\ SCE states that the waiver 
would shorten the study plan determination process by four months, and 
that the expedited process and associated waiver would allow more time 
for SCE and the stakeholders to collaboratively assess project effects 
and develop proposed license conditions during the pre-filing period. 
SCE adds that they have met the intent of these regulations through 
early collaborative efforts with stakeholders in developing the 
technical study plans included in its Pre-Application Document filed 
May 1, 2019.\4\
---------------------------------------------------------------------------

    \1\ 18 CFR 5.11 (a)-(d) (2019).
    \2\ 18 CFR 5.11 (e) (2019).
    \3\ 18 CFR 5.12 (2019).
    \4\ SCE filed updated technical study plans on August 29, 2019, 
that address comments received from stakeholders and FERC staff 
during the scoping process.
---------------------------------------------------------------------------

    With this notice we are soliciting comments on SCE's request to 
expedite the study plan determination process through waiver of certain 
pre-filing requirements. All comments should be sent to the address in 
paragraph k below.
    j. The waiver request and associated filings are available for 
review at the Commission in the Public Reference Room or may be viewed 
on the Commission's website (https://www.ferc.gov), using the eLibrary 
link. Enter the docket number, excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). A copy is also available for inspection 
and reproduction at the address in paragraph g.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    k. The Commission strongly encourages electronic filing. Please 
file all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected]. In lieu of electronic filing, please send a 
paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-1394-080.
    All filings with the Commission must bear the appropriate heading: 
Comments on Waiver Request. Any individual or entity interested in 
submitting NOI comments must do so by October 1, 2019.

    Dated: September 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20389 Filed 9-19-19; 8:45 am]
 BILLING CODE 6717-01-P