Combined Notice of Filings #1, 49518-49519 [2019-20386]

Download as PDF 49518 Federal Register / Vol. 84, No. 183 / Friday, September 20, 2019 / Notices Dated: September 4, 2019. Heather Quedenfeld, Associate Director, Coal Technology Development & Integration Center, National Energy Technology Laboratory. [FR Doc. 2019–20398 Filed 9–19–19; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY DOE/NSF Nuclear Science Advisory Committee Department of Energy, Office of Science. ACTION: Notice of open meeting. AGENCY: This notice announces a meeting of the DOE/NSF Nuclear Science Advisory Committee. The Federal Advisory Committee Act requires that public notice of these meetings be announced in the Federal Register. DATES: Friday, October 18, 2019, 9:00 a.m.–4:30 p.m. ADDRESSES: Doubletree/Washington DC/ Crystal City, 300 Army Navy Drive, Washington Ballroom, Arlington, Virginia 22202, 703–416–4100. FOR FURTHER INFORMATION CONTACT: Brenda L. May, Department of Energy; SC–26/Germantown Building, 1000 Independence Avenue SW, Washington, DC 20585–1290; Telephone: (301) 903– 0536 or email: brenda.may@ science.doe.gov. The most current information concerning this meeting can be found on the website: https:// science.osti.gov/np/nsac/meetings. SUPPLEMENTARY INFORMATION: Purpose of the Board: To provide advice and guidance on a continuing basis to the Department of Energy and the National Science Foundation on scientific priorities within the field of basic nuclear science research. Tentative Agenda: Agenda will include discussions of the following: Friday, October 18, 2019. • Perspectives from Department of Energy and National Science Foundation. • Update from the Department of Energy and National Science Foundation’s Nuclear Physics Offices. • Presentation and Discussion of the QIS Report. • Presentation on the sPHENIX Project. • Presentation on the Double Beta Decay Topical Collaboration. • Presentation on the Beam Energy Scan Theory Topical Collaboration. • NSAC Business/Discussions. Note: The NSAC Meeting will be broadcast live on the internet. You may find out how to access this broadcast by khammond on DSKJM1Z7X2PROD with NOTICES SUMMARY: VerDate Sep<11>2014 17:13 Sep 19, 2019 Jkt 247001 going to the Office of Science website at https://science.osti.gov/np/nsac/ meetings prior to the start of the meeting. A video record of meeting, including the presentations that are made, will be archived at this site after the meeting. Public Participation: The meeting is open to the public. If you would like to file a written statement with the Committee, you may do so either before or after the meeting. If you would like to make oral statements regarding any of these items on the agenda, you should contact Brenda L. May, (301) 903–0536 (phone) or Brenda.May@science.doe.gov (email). You must make your request for an oral statement at least five business days before the meeting. Reasonable provision will be made to include the scheduled oral statements on the agenda. The Chairperson of the Committee will conduct the meeting to facilitate the orderly conduct of business. Public comment will follow the 10-minute rule. The minutes of the meeting will be available for review on the Department of Energy’s Office of Nuclear Physics website at https://science.osti.gov/np/ nsac/meetings. Signed in Washington, DC, on September 16, 2019. LaTanya Butler, Deputy Committee Management Officer. [FR Doc. 2019–20348 Filed 9–19–19; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–372–008. Applicants: PJM Interconnection, L.L.C. Description: Compliance filing: Compliance Filing Pursuant to Commission’s August 30, 2019 Order on Rehearing to be effective 8/30/2019. Filed Date: 9/16/19. Accession Number: 20190916–5075. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER18–2270–001. Applicants: Paulding Wind Farm III LLC. Description: Report Filing: Refund Report Filing to be effective N/A. Filed Date: 9/16/19. Accession Number: 20190916–5012. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER18–2317–001. PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 Applicants: Meadow Lake Wind Farm V LLC. Description: Report Filing: Refund Report Filing to be effective N/A. Filed Date: 9/16/19. Accession Number: 20190916–5013. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER18–2370–000. Applicants: Lackawanna Energy Center LLC. Description: Report Filing: Refund Report in Docket Nos. ER18–2370 and EL19–7 to be effective N/A. Filed Date: 9/16/19. Accession Number: 20190916–5086. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER19–266–000. Applicants: Invenergy Nelson LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 9/16/19. Accession Number: 20190916–5089. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER19–2813–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3597 Chilocco Wind Farm GIA to be effective 9/6/2019. Filed Date: 9/16/19. Accession Number: 20190916–5009. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER19–2814–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original Cost Responsibility Agreement, Service Agreement No. 5483, NQ165 to be effective 8/16/2019. Filed Date: 9/16/19. Accession Number: 20190916–5057. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER19–2815–000. Applicants: ISO New England Inc. Description: § 205(d) Rate Filing: Ministerial Filing to Conform ISO–NE Financial Assurance Policy to be effective 9/17/2019. Filed Date: 9/16/19. Accession Number: 20190916–5078. Comments Due: 5 p.m. ET 10/7/19. Docket Numbers: ER19–2816–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–09–16_SA 3348 ITC-IsabellaIsabella II-Consumers MPFCA (J717 J728 J752) to be effective 8/30/2019. Filed Date: 9/16/19. Accession Number: 20190916–5087. Comments Due: 5 p.m. ET 10/7/19. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF19–1315–000; QF19–1299–000; QF19–1302–000; QF19–1300–000; QF19–1311–000; QF19–1314–000; QF19–1301–000. E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 84, No. 183 / Friday, September 20, 2019 / Notices Applicants: Bluestone Solar, LLC, Chisago Holdco LLC, CMR Solar, LLC, Frontenac Holdco LLC, Montevideo Solar LLC, Sartell Solar LLC, Underhill Solar, LLC. Description: Refund Report of Bluestone Solar, LLC, et al. Filed Date: 9/13/19. Accession Number: 20190913–5172. Comments Due: 5 p.m. ET 10/4/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20386 Filed 9–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1394–080] khammond on DSKJM1Z7X2PROD with NOTICES Southern California Edison; Notice of Request To Expedite Study Plan Determination Process Through Waiver of Pre-Filing Requirements a. Type of Filing: Request to Expedite Study Plan Determination Process through Waiver of Pre-Filing Requirements. b. Project No.: 1394–080. c. Dated Filed: September 4, 2019. d. Submitted By: Southern California Edison (SCE). e. Name of Project: Bishop Creek Hydroelectric Project. f. Location: On Bishop Creek in Inyo County, California. The project occupies approximately 734 acres of federal land administered by the U.S. Forest Service and approximately 48 acres of federal land administered by the U.S. Bureau of Land Management. g. Applicant Contact: Matthew Woodhall, Project Lead, Southern VerDate Sep<11>2014 17:13 Sep 19, 2019 Jkt 247001 California Edison Company, 1515 Walnut Grove Avenue, Rosemead, CA 91770. h. FERC Contact: Kelly Wolcott at (202) 502–6480 or email at: kelly.wolcott@ferc.gov. i. On September 4, 2019, SCE filed a request for the Commission to expedite the study plan determination process by waiving certain pre-filing study plan development requirements under Part 5 of the Commission’s regulations for the existing Bishop Creek Hydroelectric Project. Specifically, SCE requests that the Commission waive the requirement for: A proposed study plan; 1 study plan meetings; 2 and comments on the proposed study plan.3 SCE states that the waiver would shorten the study plan determination process by four months, and that the expedited process and associated waiver would allow more time for SCE and the stakeholders to collaboratively assess project effects and develop proposed license conditions during the pre-filing period. SCE adds that they have met the intent of these regulations through early collaborative efforts with stakeholders in developing the technical study plans included in its Pre-Application Document filed May 1, 2019.4 With this notice we are soliciting comments on SCE’s request to expedite the study plan determination process through waiver of certain pre-filing requirements. All comments should be sent to the address in paragraph k below. j. The waiver request and associated filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph g. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. 1 18 CFR 5.11 (a)–(d) (2019). CFR 5.11 (e) (2019). 3 18 CFR 5.12 (2019). 4 SCE filed updated technical study plans on August 29, 2019, that address comments received from stakeholders and FERC staff during the scoping process. 2 18 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 49519 k. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–1394–080. All filings with the Commission must bear the appropriate heading: Comments on Waiver Request. Any individual or entity interested in submitting NOI comments must do so by October 1, 2019. Dated: September 16, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20389 Filed 9–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–95–000] Portland General Electric Company; Notice of Petition for Declaratory Order Take notice that on September 9, 2019, pursuant to Rule 207 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207 (2019), Portland General Electric Company (Portland General or Petitioner) filed a petition for the Commission to issue a declaratory order approving Portland General’s proposal to reclassify, as transmission assets, certain 115 kV and 57 kV facilities currently classified as distribution plant, as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to theproceeding. Any person wishing to become a party must file a notice of E:\FR\FM\20SEN1.SGM 20SEN1

Agencies

[Federal Register Volume 84, Number 183 (Friday, September 20, 2019)]
[Notices]
[Pages 49518-49519]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20386]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER16-372-008.
    Applicants: PJM Interconnection, L.L.C.
    Description: Compliance filing: Compliance Filing Pursuant to 
Commission's August 30, 2019 Order on Rehearing to be effective 8/30/
2019.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5075.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER18-2270-001.
    Applicants: Paulding Wind Farm III LLC.
    Description: Report Filing: Refund Report Filing to be effective N/
A.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5012.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER18-2317-001.
    Applicants: Meadow Lake Wind Farm V LLC.
    Description: Report Filing: Refund Report Filing to be effective N/
A.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5013.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER18-2370-000.
    Applicants: Lackawanna Energy Center LLC.
    Description: Report Filing: Refund Report in Docket Nos. ER18-2370 
and EL19-7 to be effective N/A.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5086.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER19-266-000.
    Applicants: Invenergy Nelson LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5089.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER19-2813-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3597 Chilocco Wind Farm GIA 
to be effective 9/6/2019.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5009.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER19-2814-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original Cost Responsibility 
Agreement, Service Agreement No. 5483, NQ165 to be effective 8/16/2019.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5057.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER19-2815-000.
    Applicants: ISO New England Inc.
    Description: Sec.  205(d) Rate Filing: Ministerial Filing to 
Conform ISO-NE Financial Assurance Policy to be effective 9/17/2019.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5078.
    Comments Due: 5 p.m. ET 10/7/19.

    Docket Numbers: ER19-2816-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-09-16_SA 3348 ITC-
Isabella-Isabella II-Consumers MPFCA (J717 J728 J752) to be effective 
8/30/2019.
    Filed Date: 9/16/19.
    Accession Number: 20190916-5087.
    Comments Due: 5 p.m. ET 10/7/19.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF19-1315-000; QF19-1299-000; QF19-1302-000; QF19-
1300-000; QF19-1311-000; QF19-1314-000; QF19-1301-000.

[[Page 49519]]

    Applicants: Bluestone Solar, LLC, Chisago Holdco LLC, CMR Solar, 
LLC, Frontenac Holdco LLC, Montevideo Solar LLC, Sartell Solar LLC, 
Underhill Solar, LLC.
    Description: Refund Report of Bluestone Solar, LLC, et al.
    Filed Date: 9/13/19.
    Accession Number: 20190913-5172.
    Comments Due: 5 p.m. ET 10/4/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20386 Filed 9-19-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.