Gladstone New Energy, LLC v. Tri-State Generation and Transmission Association, Inc.; Notice of Complaint, 49286 [2019-20270]

Download as PDF 49286 Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–97–000] jbell on DSK3GLQ082PROD with NOTICES Gladstone New Energy, LLC v. TriState Generation and Transmission Association, Inc.; Notice of Complaint Take notice that on September 11, 2019, pursuant to sections 206 and 306 of the Federal Power Act (FPA), 16 U.S.C. 824e, 825e, and Rules 206 and 212 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 and 385.212, Gladstone New Energy, LLC (GNE or Complainant) filed a formal complaint against Tri-State Generation and Transmission Association, Inc. (Tri-State or Respondent) alleging that Tri-State’s currently effective generation Interconnection Procedures and Generation Interconnection Agreement do not substantially conform to the pro forma Large Generator Interconnection Procedures and Large Generator Interconnection Agreement, as required for non-jurisdictional utilities seeking reciprocity under Order Nos. 888 and 2003–A, all as more fully explained in the complaint. GNE certifies that copies of the complaint were served on the contacts for Tri-State as listed in Tri-State’s July 23, 2019 Open Access Transmission Tariff FERC Electric Tariff Volume No. 2 filing in Docket No. ER19–2441–000. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. VerDate Sep<11>2014 17:30 Sep 18, 2019 Jkt 247001 This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 1, 2019. Dated: September 13, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–20270 Filed 9–18–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–138–000. Applicants: Valentine Solar, LLC, Glaciers Edge Wind Project, LLC, PGGM Coo¨peratie U.A. Description: Application for Authorization Under Section 203 of the Federal Power, et al. Act of Valentine Solar, LLC, et al. Filed Date: 9/11/19. Accession Number: 20190911–5140. Comments Due: 5 p.m. ET 10/2/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–182–000. Applicants: Blue Summit III Wind, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Blue Summit III Wind, LLC. Filed Date: 9/12/19. Accession Number: 20190912–5099. Comments Due: 5 p.m. ET 10/3/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2405–000. Applicants: Porterhouse Wind (4) LLC. Description: Supplement to July 15, 2019 Porterhouse Wind (4) LLC tariff filing. Filed Date: 9/12/19. Accession Number: 20190912–5022. Comments Due: 5 p.m. ET 9/23/19. PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Docket Numbers: ER19–2460–000. Applicants: DWW Solar II, LLC. Description: Supplement to July 25, 2019 DWW Solar II, LLC tariff filing. Filed Date: 9/12/19. Accession Number: 20190912–5065. Comments Due: 5 p.m. ET 9/26/19. Docket Numbers: ER19–2787–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–09–11 Amendment No. 3 to Amended and Restated PLA with CDWR to be effective 11/1/2019. Filed Date: 9/11/19. Accession Number: 20190911–5118. Comments Due: 5 p.m. ET 10/2/19. Docket Numbers: ER19–2788–000. Applicants: Emera Maine. Description: § 205(d) Rate Filing: Interconnection Agreement with Liberty Utilities (Tinker Transmission) LP to be effective 9/10/2019. Filed Date: 9/11/19. Accession Number: 20190911–5130. Comments Due: 5 p.m. ET 10/2/19. Docket Numbers: ER19–2789–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCo MBR Tariff_EFF 10.31.19 to be effective 10/31/2019. Filed Date: 9/12/19. Accession Number: 20190912–5037. Comments Due: 5 p.m. ET 10/3/19. Docket Numbers: ER19–2790–000. Applicants: LSP-Whitewater Limited Partnership. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 11/12/2019. Filed Date: 9/12/19. Accession Number: 20190912–5075. Comments Due: 5 p.m. ET 10/3/19. Docket Numbers: ER19–2791–000. Applicants: Midcontinent Independent System Operator, Inc., Otter Tail Power Company. Description: § 205(d) Rate Filing: 2019–09–12_SA 3349 OTP-Deuel Harvest Wind FSA (J526) to be effective 11/12/2019. Filed Date: 9/12/19. Accession Number: 20190912–5074. Comments Due: 5 p.m. ET 10/3/19. Docket Numbers: ER19–2792–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ISA SA No. 5472; Queue No AC1–204 and Cancellation of IISA No. 5373 to be effective 8/13/2019. Filed Date: 9/12/19. Accession Number: 20190912–5076. Comments Due: 5 p.m. ET 10/3/19. Docket Numbers: ER19–2793–000. Applicants: Northern States Power Company, a Minnesota corporation, E:\FR\FM\19SEN1.SGM 19SEN1

Agencies

[Federal Register Volume 84, Number 182 (Thursday, September 19, 2019)]
[Notices]
[Page 49286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20270]



[[Page 49286]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL19-97-000]


Gladstone New Energy, LLC v. Tri-State Generation and 
Transmission Association, Inc.; Notice of Complaint

    Take notice that on September 11, 2019, pursuant to sections 206 
and 306 of the Federal Power Act (FPA), 16 U.S.C. 824e, 825e, and Rules 
206 and 212 of the Federal Energy Regulatory Commission's (Commission) 
Rules of Practice and Procedure, 18 CFR 385.206 and 385.212, Gladstone 
New Energy, LLC (GNE or Complainant) filed a formal complaint against 
Tri-State Generation and Transmission Association, Inc. (Tri-State or 
Respondent) alleging that Tri-State's currently effective generation 
Interconnection Procedures and Generation Interconnection Agreement do 
not substantially conform to the pro forma Large Generator 
Interconnection Procedures and Large Generator Interconnection 
Agreement, as required for non-jurisdictional utilities seeking 
reciprocity under Order Nos. 888 and 2003-A, all as more fully 
explained in the complaint.
    GNE certifies that copies of the complaint were served on the 
contacts for Tri-State as listed in Tri-State's July 23, 2019 Open 
Access Transmission Tariff FERC Electric Tariff Volume No. 2 filing in 
Docket No. ER19-2441-000.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE, Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
eLibrary link and is available for review in the Commission's Public 
Reference Room in Washington, DC. There is an eSubscription link on the 
website that enables subscribers to receive email notification when a 
document is added to a subscribed docket(s). For assistance with any 
FERC Online service, please email [email protected], or call 
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on October 1, 2019.

    Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20270 Filed 9-18-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.