Gladstone New Energy, LLC v. Tri-State Generation and Transmission Association, Inc.; Notice of Complaint, 49286 [2019-20270]
Download as PDF
49286
Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–97–000]
jbell on DSK3GLQ082PROD with NOTICES
Gladstone New Energy, LLC v. TriState Generation and Transmission
Association, Inc.; Notice of Complaint
Take notice that on September 11,
2019, pursuant to sections 206 and 306
of the Federal Power Act (FPA), 16
U.S.C. 824e, 825e, and Rules 206 and
212 of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
and 385.212, Gladstone New Energy,
LLC (GNE or Complainant) filed a
formal complaint against Tri-State
Generation and Transmission
Association, Inc. (Tri-State or
Respondent) alleging that Tri-State’s
currently effective generation
Interconnection Procedures and
Generation Interconnection Agreement
do not substantially conform to the pro
forma Large Generator Interconnection
Procedures and Large Generator
Interconnection Agreement, as required
for non-jurisdictional utilities seeking
reciprocity under Order Nos. 888 and
2003–A, all as more fully explained in
the complaint.
GNE certifies that copies of the
complaint were served on the contacts
for Tri-State as listed in Tri-State’s July
23, 2019 Open Access Transmission
Tariff FERC Electric Tariff Volume No.
2 filing in Docket No. ER19–2441–000.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
VerDate Sep<11>2014
17:30 Sep 18, 2019
Jkt 247001
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 1, 2019.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20270 Filed 9–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–138–000.
Applicants: Valentine Solar, LLC,
Glaciers Edge Wind Project, LLC, PGGM
Coo¨peratie U.A.
Description: Application for
Authorization Under Section 203 of the
Federal Power, et al. Act of Valentine
Solar, LLC, et al.
Filed Date: 9/11/19.
Accession Number: 20190911–5140.
Comments Due: 5 p.m. ET 10/2/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–182–000.
Applicants: Blue Summit III Wind,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Blue Summit III
Wind, LLC.
Filed Date: 9/12/19.
Accession Number: 20190912–5099.
Comments Due: 5 p.m. ET 10/3/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2405–000.
Applicants: Porterhouse Wind (4)
LLC.
Description: Supplement to July 15,
2019 Porterhouse Wind (4) LLC tariff
filing.
Filed Date: 9/12/19.
Accession Number: 20190912–5022.
Comments Due: 5 p.m. ET 9/23/19.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Docket Numbers: ER19–2460–000.
Applicants: DWW Solar II, LLC.
Description: Supplement to July 25,
2019 DWW Solar II, LLC tariff filing.
Filed Date: 9/12/19.
Accession Number: 20190912–5065.
Comments Due: 5 p.m. ET 9/26/19.
Docket Numbers: ER19–2787–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–09–11 Amendment No. 3 to
Amended and Restated PLA with CDWR
to be effective 11/1/2019.
Filed Date: 9/11/19.
Accession Number: 20190911–5118.
Comments Due: 5 p.m. ET 10/2/19.
Docket Numbers: ER19–2788–000.
Applicants: Emera Maine.
Description: § 205(d) Rate Filing:
Interconnection Agreement with Liberty
Utilities (Tinker Transmission) LP to be
effective 9/10/2019.
Filed Date: 9/11/19.
Accession Number: 20190911–5130.
Comments Due: 5 p.m. ET 10/2/19.
Docket Numbers: ER19–2789–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo MBR Tariff_EFF 10.31.19 to be
effective 10/31/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5037.
Comments Due: 5 p.m. ET 10/3/19.
Docket Numbers: ER19–2790–000.
Applicants: LSP-Whitewater Limited
Partnership.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 11/12/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5075.
Comments Due: 5 p.m. ET 10/3/19.
Docket Numbers: ER19–2791–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Otter Tail Power Company.
Description: § 205(d) Rate Filing:
2019–09–12_SA 3349 OTP-Deuel
Harvest Wind FSA (J526) to be effective
11/12/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5074.
Comments Due: 5 p.m. ET 10/3/19.
Docket Numbers: ER19–2792–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA SA No. 5472; Queue No
AC1–204 and Cancellation of IISA No.
5373 to be effective 8/13/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5076.
Comments Due: 5 p.m. ET 10/3/19.
Docket Numbers: ER19–2793–000.
Applicants: Northern States Power
Company, a Minnesota corporation,
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 84, Number 182 (Thursday, September 19, 2019)]
[Notices]
[Page 49286]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20270]
[[Page 49286]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL19-97-000]
Gladstone New Energy, LLC v. Tri-State Generation and
Transmission Association, Inc.; Notice of Complaint
Take notice that on September 11, 2019, pursuant to sections 206
and 306 of the Federal Power Act (FPA), 16 U.S.C. 824e, 825e, and Rules
206 and 212 of the Federal Energy Regulatory Commission's (Commission)
Rules of Practice and Procedure, 18 CFR 385.206 and 385.212, Gladstone
New Energy, LLC (GNE or Complainant) filed a formal complaint against
Tri-State Generation and Transmission Association, Inc. (Tri-State or
Respondent) alleging that Tri-State's currently effective generation
Interconnection Procedures and Generation Interconnection Agreement do
not substantially conform to the pro forma Large Generator
Interconnection Procedures and Large Generator Interconnection
Agreement, as required for non-jurisdictional utilities seeking
reciprocity under Order Nos. 888 and 2003-A, all as more fully
explained in the complaint.
GNE certifies that copies of the complaint were served on the
contacts for Tri-State as listed in Tri-State's July 23, 2019 Open
Access Transmission Tariff FERC Electric Tariff Volume No. 2 filing in
Docket No. ER19-2441-000.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
eLibrary link and is available for review in the Commission's Public
Reference Room in Washington, DC. There is an eSubscription link on the
website that enables subscribers to receive email notification when a
document is added to a subscribed docket(s). For assistance with any
FERC Online service, please email [email protected], or call
(866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 1, 2019.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20270 Filed 9-18-19; 8:45 am]