Warm Springs Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Preliminary Fishway Prescriptions, 49281-49282 [2019-20264]
Download as PDF
Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Sept 2019 Cleanup
Filing to be effective 10/11/2019.
Filed Date: 9/11/19.
Accession Number: 20190911–5022.
Comments Due: 5 p.m. ET 9/23/19.
Docket Numbers: RP19–1552–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCO
Noble Negotiated Rate Amendment to
be effective 9/11/2019.
Filed Date: 9/11/19.
Accession Number: 20190911–5104.
Comments Due: 5 p.m. ET 9/23/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20259 Filed 9–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12726–002]
jbell on DSK3GLQ082PROD with NOTICES
Warm Springs Hydro, LLC; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Preliminary Fishway
Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original minor
license.
b. Project No.: P–12726–002.
VerDate Sep<11>2014
17:30 Sep 18, 2019
Jkt 247001
c. Date filed: April 1, 2019.
d. Applicant: Warm Springs Hydro,
LLC (Warm Springs).
e. Name of Project: Rock Creek
Hydroelectric Project.
f. Location: The Rock Creek
Hydroelectric Project is located on Rock
Creek in Haines County, Oregon. The
project would occupy 1.8 acres of the
Wallowa Whitman National Forest,
which is administered by the U.S.
Forest Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Nicholas E.
Josten, GeoSense, 2742 Saint Charles
Avenue, Idaho Falls, ID 43404, (208)
528–6152.
i. FERC Contact: Kelly Wolcott at
(202) 502–6480; or at kelly.wolcott@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, terms and
conditions, and preliminary fishway
prescriptions using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–12726–002.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
49281
l. Project Description: The proposed
project would consist of: (1) A new
diversion and fish screen on Rock
Creek; (2) a new 8,300-foot-long, 18 to
24-inch-diameter low pressure
penstock, to be buried in an existing
flume right-of-way and ending at the top
of the ridge above the power plant site;
(3) a new 3,100-foot-long, 20 to 24-inchdiameter high pressure penstock,
extending from the end of the low
pressure pipeline to the new
powerhouse; (4) a new approximately
20-foot-long, 15-foot-wide powerhouse,
located adjacent to Rock Creek just
above the Wilcox Ditch diversion,
containing a single 0.85-megawatt
Pelton turbine; and (5) a 500-foot-long
12.5-kilovolt transmission line to
deliver energy from the powerhouse to
an Oregon Trail Electric Consumers
Cooperative distribution line; and (6)
appurtenant facilities. The estimated
average annual generation is 3,900megawatt hours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s website at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on, or before, the specified
comment date for the particular
application.
All filings must: (1) Bear in all capital
letters the title PROTEST, MOTION TO
INTERVENE, COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS,
TERMS AND CONDITIONS, or
PRELIMINARY FISHWAY
PRESCRIPTIONS; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
E:\FR\FM\19SEN1.SGM
19SEN1
49282
Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions, or preliminary prescriptions
must set forth their evidentiary basis
and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
o. Warm Springs intends to seek
benefits under § 210 of the Public Utility
Regulatory Policy Act of 1978 (PURPA),
and believes that the project meets the
definition under § 292.202(p) of 18 CFR
for a new dam or diversion. As such, the
U.S. Fish and Wildlife Service, the
National Marine Fisheries Service, and
the state agency exercising authority
over the fish and wildlife resources of
the state have mandatory conditioning
authority under the procedures
provided for at § 30(c) of the Federal
Power Act (Act).
p. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
q. Procedural schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Further revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Filing comments, recommendations, terms
and conditions, and preliminary fishway prescriptions.
Commission issues EA ....
Comments on EA due ......
November 2019.
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20264 Filed 9–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
jbell on DSK3GLQ082PROD with NOTICES
Story County Wind, LLC ...................................................................................................................................................................
Ashtabula Wind I, LLC ......................................................................................................................................................................
Quitman Solar, LLC ..........................................................................................................................................................................
Dougherty County Solar, LLC ..........................................................................................................................................................
Talen Montana, LLC .........................................................................................................................................................................
Burke Wind, LLC ..............................................................................................................................................................................
Skeleton Creek Wind, LLC ...............................................................................................................................................................
Palmas Wind, LLC ............................................................................................................................................................................
Emmons-Logan Wind, LLC ..............................................................................................................................................................
West Columbia Storage LLC ............................................................................................................................................................
Wessington Springs Wind, LLC ........................................................................................................................................................
PSEG Keys Energy Center LLC ......................................................................................................................................................
PSEG Fossil Sewaren Urban Renewal LLC ....................................................................................................................................
Cubico Palmetto Lessee, LLC ..........................................................................................................................................................
Palmetto Plains Solar Project, LLC ..................................................................................................................................................
Pretty Prairie Wind, LLC ...................................................................................................................................................................
Crowned Ridge Wind, LLC ...............................................................................................................................................................
Crowned Ridge Wind II, LLC ............................................................................................................................................................
RE Rambler LLC ..............................................................................................................................................................................
Polaris Wind Energy, LLC ................................................................................................................................................................
SRI Meridian III, LLC ........................................................................................................................................................................
Mesquite Star Special, LLC ..............................................................................................................................................................
Hancock County Wind, LLC .............................................................................................................................................................
Stanton Energy Reliability Center, LLC ............................................................................................................................................
Coolberrin Wind Limited ...................................................................................................................................................................
Chenya Power Co., Ltd ....................................................................................................................................................................
Take notice that during the month of
August 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2019).
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20258 Filed 9–18–19; 8:45 am]
VerDate Sep<11>2014
17:30 Sep 18, 2019
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1553–000.
BILLING CODE 6717–01–P
Jkt 247001
June 2020.
July 2020.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
EG19–118–000
EG19–119–000
EG19–120–000
EG19–121–000
EG19–122–000
EG19–123–000
EG19–124–000
EG19–125–000
EG19–126–000
EG19–127–000
EG19–129–000
EG19–131–000
EG19–132–000
EG19–133–000
EG19–134–000
EG19–135–000
EG19–136–000
EG19–137–000
EG19–138–000
EG19–140–000
EG19–141–000
EG19–142–000
EG19–143–000
EG19–144–000
FC19–5–000
FC19–6–000
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 091219
Negotiated Rates—Mieco Inc. R–7080–
11 to be effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5064.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19–1554–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Formula Based Negotiated Rate—10/1/
2019 Update to be effective 10/1/2019.
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 84, Number 182 (Thursday, September 19, 2019)]
[Notices]
[Pages 49281-49282]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20264]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12726-002]
Warm Springs Hydro, LLC; Notice of Application Accepted for
Filing, Soliciting Motions To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting Comments, Recommendations, Terms
and Conditions, and Preliminary Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original minor license.
b. Project No.: P-12726-002.
c. Date filed: April 1, 2019.
d. Applicant: Warm Springs Hydro, LLC (Warm Springs).
e. Name of Project: Rock Creek Hydroelectric Project.
f. Location: The Rock Creek Hydroelectric Project is located on
Rock Creek in Haines County, Oregon. The project would occupy 1.8 acres
of the Wallowa Whitman National Forest, which is administered by the
U.S. Forest Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Nicholas E. Josten, GeoSense, 2742 Saint
Charles Avenue, Idaho Falls, ID 43404, (208) 528-6152.
i. FERC Contact: Kelly Wolcott at (202) 502-6480; or at
[email protected].
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and preliminary prescriptions:
60 days from the issuance date of this notice; reply comments are due
105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, terms and
conditions, and preliminary fishway prescriptions using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-12726-002.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
l. Project Description: The proposed project would consist of: (1)
A new diversion and fish screen on Rock Creek; (2) a new 8,300-foot-
long, 18 to 24-inch-diameter low pressure penstock, to be buried in an
existing flume right-of-way and ending at the top of the ridge above
the power plant site; (3) a new 3,100-foot-long, 20 to 24-inch-diameter
high pressure penstock, extending from the end of the low pressure
pipeline to the new powerhouse; (4) a new approximately 20-foot-long,
15-foot-wide powerhouse, located adjacent to Rock Creek just above the
Wilcox Ditch diversion, containing a single 0.85-megawatt Pelton
turbine; and (5) a 500-foot-long 12.5-kilovolt transmission line to
deliver energy from the powerhouse to an Oregon Trail Electric
Consumers Cooperative distribution line; and (6) appurtenant
facilities. The estimated average annual generation is 3,900-megawatt
hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room, or may be viewed on the
Commission's website at https://www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the last three digits in the docket
number field, to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, and .214. In determining the appropriate action to
take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on, or
before, the specified comment date for the particular application.
All filings must: (1) Bear in all capital letters the title
PROTEST, MOTION TO INTERVENE, COMMENTS, REPLY COMMENTS,
RECOMMENDATIONS, TERMS AND CONDITIONS, or PRELIMINARY FISHWAY
PRESCRIPTIONS; (2) set forth in the heading the name of the applicant
and the project number of the application to which the filing responds;
(3) furnish
[[Page 49282]]
the name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions, or preliminary prescriptions must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). Agencies may obtain copies of the application directly from
the applicant. A copy of any protest or motion to intervene must be
served upon each representative of the applicant specified in the
particular application. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
o. Warm Springs intends to seek benefits under Sec. 210 of the
Public Utility Regulatory Policy Act of 1978 (PURPA), and believes that
the project meets the definition under Sec. 292.202(p) of 18 CFR for a
new dam or diversion. As such, the U.S. Fish and Wildlife Service, the
National Marine Fisheries Service, and the state agency exercising
authority over the fish and wildlife resources of the state have
mandatory conditioning authority under the procedures provided for at
Sec. 30(c) of the Federal Power Act (Act).
p. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
q. Procedural schedule: The application will be processed according
to the following revised Hydro Licensing Schedule. Further revisions to
the schedule will be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing comments, recommendations, terms November 2019.
and conditions, and preliminary
fishway prescriptions.
Commission issues EA................... June 2020.
Comments on EA due..................... July 2020.
------------------------------------------------------------------------
r. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20264 Filed 9-18-19; 8:45 am]
BILLING CODE 6717-01-P