Combined Notice of Filings, 49282-49283 [2019-20256]
Download as PDF
49282
Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions, or preliminary prescriptions
must set forth their evidentiary basis
and otherwise comply with the
requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
o. Warm Springs intends to seek
benefits under § 210 of the Public Utility
Regulatory Policy Act of 1978 (PURPA),
and believes that the project meets the
definition under § 292.202(p) of 18 CFR
for a new dam or diversion. As such, the
U.S. Fish and Wildlife Service, the
National Marine Fisheries Service, and
the state agency exercising authority
over the fish and wildlife resources of
the state have mandatory conditioning
authority under the procedures
provided for at § 30(c) of the Federal
Power Act (Act).
p. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
q. Procedural schedule: The
application will be processed according
to the following revised Hydro
Licensing Schedule. Further revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Filing comments, recommendations, terms
and conditions, and preliminary fishway prescriptions.
Commission issues EA ....
Comments on EA due ......
November 2019.
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20264 Filed 9–18–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator and Foreign
Utility Company Status
jbell on DSK3GLQ082PROD with NOTICES
Story County Wind, LLC ...................................................................................................................................................................
Ashtabula Wind I, LLC ......................................................................................................................................................................
Quitman Solar, LLC ..........................................................................................................................................................................
Dougherty County Solar, LLC ..........................................................................................................................................................
Talen Montana, LLC .........................................................................................................................................................................
Burke Wind, LLC ..............................................................................................................................................................................
Skeleton Creek Wind, LLC ...............................................................................................................................................................
Palmas Wind, LLC ............................................................................................................................................................................
Emmons-Logan Wind, LLC ..............................................................................................................................................................
West Columbia Storage LLC ............................................................................................................................................................
Wessington Springs Wind, LLC ........................................................................................................................................................
PSEG Keys Energy Center LLC ......................................................................................................................................................
PSEG Fossil Sewaren Urban Renewal LLC ....................................................................................................................................
Cubico Palmetto Lessee, LLC ..........................................................................................................................................................
Palmetto Plains Solar Project, LLC ..................................................................................................................................................
Pretty Prairie Wind, LLC ...................................................................................................................................................................
Crowned Ridge Wind, LLC ...............................................................................................................................................................
Crowned Ridge Wind II, LLC ............................................................................................................................................................
RE Rambler LLC ..............................................................................................................................................................................
Polaris Wind Energy, LLC ................................................................................................................................................................
SRI Meridian III, LLC ........................................................................................................................................................................
Mesquite Star Special, LLC ..............................................................................................................................................................
Hancock County Wind, LLC .............................................................................................................................................................
Stanton Energy Reliability Center, LLC ............................................................................................................................................
Coolberrin Wind Limited ...................................................................................................................................................................
Chenya Power Co., Ltd ....................................................................................................................................................................
Take notice that during the month of
August 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators or Foreign Utility Companies
became effective by operation of the
Commission’s regulations. 18 CFR
366.7(a) (2019).
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20258 Filed 9–18–19; 8:45 am]
VerDate Sep<11>2014
17:30 Sep 18, 2019
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1553–000.
BILLING CODE 6717–01–P
Jkt 247001
June 2020.
July 2020.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
EG19–118–000
EG19–119–000
EG19–120–000
EG19–121–000
EG19–122–000
EG19–123–000
EG19–124–000
EG19–125–000
EG19–126–000
EG19–127–000
EG19–129–000
EG19–131–000
EG19–132–000
EG19–133–000
EG19–134–000
EG19–135–000
EG19–136–000
EG19–137–000
EG19–138–000
EG19–140–000
EG19–141–000
EG19–142–000
EG19–143–000
EG19–144–000
FC19–5–000
FC19–6–000
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 091219
Negotiated Rates—Mieco Inc. R–7080–
11 to be effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5064.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19–1554–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Formula Based Negotiated Rate—10/1/
2019 Update to be effective 10/1/2019.
E:\FR\FM\19SEN1.SGM
19SEN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 182 / Thursday, September 19, 2019 / Notices
Filed Date: 9/12/19.
Accession Number: 20190912–5112.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19–1555–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 091219
Negotiated Rates—Spark Energy Gas,
LLC R–3045–26 to be effective 11/1/
2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5114.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19–351–003.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Compliance filing 2019
Settlement Compliance V1 to be
effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912–5094.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19–1556–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: Compliance filing
Annual Cash-Out Report Period Ending
July 31, 2019 to be effective N/A.
Filed Date: 9/13/19.
Accession Number: 20190913–5001.
Comments Due: 5 p.m. ET 9/25/19.
Docket Numbers: RP19–1557–000.
Applicants: Trunkline Gas Company,
LLC.
Description: Compliance filing
Annual Report of Flow Through filed 9–
13–19 to be effective N/A.
Filed Date: 9/13/19.
Accession Number: 20190913–5017.
Comments Due: 5 p.m. ET 9/25/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–20256 Filed 9–18–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:30 Sep 18, 2019
Jkt 247001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF19–7–000]
WBI Energy Transmission, Inc.; Notice
of Intent To Prepare An Environmental
Assessment for the Planned North
Bakken Expansion Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Session
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the North Bakken Expansion Project
involving construction and operation of
facilities by WBI Energy Transmission,
Inc. (WBI) in Burke, McKenzie,
Mountrail, and Williams Counties,
North Dakota. The Commission will use
this EA in its decision-making process
to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on October 15, 2019.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 28, 2019, you will
need to file those comments in Docket
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
49283
No. PF19–7–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this planned
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ is available for viewing on
the FERC website (www.ferc.gov) at
https://www.ferc.gov/resources/guides/
gas/gas.pdf. This fact sheet addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up, go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are four
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is on the Commission’s
website (www.ferc.gov) under the link to
Documents and Filings. Using
eComment is an easy method for
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 84, Number 182 (Thursday, September 19, 2019)]
[Notices]
[Pages 49282-49283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20256]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19-1553-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Sec. 4(d) Rate Filing: 091219 Negotiated Rates--Mieco
Inc. R-7080-11 to be effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912-5064.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19-1554-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Formula Based Negotiated
Rate--10/1/2019 Update to be effective 10/1/2019.
[[Page 49283]]
Filed Date: 9/12/19.
Accession Number: 20190912-5112.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19-1555-000.
Applicants: Iroquois Gas Transmission System, L.P.
Description: Sec. 4(d) Rate Filing: 091219 Negotiated Rates--Spark
Energy Gas, LLC R-3045-26 to be effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912-5114.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19-351-003.
Applicants: Tennessee Gas Pipeline Company, L.L.C.
Description: Compliance filing 2019 Settlement Compliance V1 to be
effective 11/1/2019.
Filed Date: 9/12/19.
Accession Number: 20190912-5094.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: RP19-1556-000.
Applicants: Transcontinental Gas Pipe Line Company.
Description: Compliance filing Annual Cash-Out Report Period Ending
July 31, 2019 to be effective N/A.
Filed Date: 9/13/19.
Accession Number: 20190913-5001.
Comments Due: 5 p.m. ET 9/25/19.
Docket Numbers: RP19-1557-000.
Applicants: Trunkline Gas Company, LLC.
Description: Compliance filing Annual Report of Flow Through filed
9-13-19 to be effective N/A.
Filed Date: 9/13/19.
Accession Number: 20190913-5017.
Comments Due: 5 p.m. ET 9/25/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-20256 Filed 9-18-19; 8:45 am]
BILLING CODE 6717-01-P