Download as PDF jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices 2019. Written submissions by interested persons who will not appear at the hearing should also be filed by November 26, 2019. All participants and interested persons are asked to address the following RRTF recommendations in their written testimony or submissions and at the hearing: • Definition of long-term revenue adequacy: The RRTF recommended determining long-term revenue adequacy by looking at the annual determinations over ‘‘the shortest period of time, not less than five years, that includes both a year in which a recession began and a year that follows a year in which a recession began.’’ RRTF Report 13, 33. • Rate increase constraint: The RRTF recommended considering a rate increase constraint for long-term revenue-adequate carriers, which would identify a point beyond which further application of differential pricing would be unwarranted. See RRTF Report 13, 36–39. • Bottleneck changes: The RRTF recommended considering suspension of the Board’s Bottleneck 5 protections as applied to long-term revenueadequate carriers. See RRTF Report 13, 39–41. • Simplified Stand-Alone Cost (Simplified-SAC) changes: For purposes of considering whether a long-term revenue-adequate carrier’s rate is reasonable under Simplified-SAC, the RRTF recommended reinstating the simplification of the Road Property Investment analysis. See RRTF Report 13, 41–42, & app. B. Board Releases and Transcript Availability: Decisions and notices of the Board, including this notice, are available on the Board’s website at www.stb.gov. The Board will issue a separate notice containing instructions for attendance at the hearing and the schedule of appearances. Please note that streaming and recording systems will not be available for this hearing. As soon as a transcript is available, it will be posted on the Board’s website. It is ordered 1. A public hearing will be held on December 12, 2019, at 9:30 a.m., in the James E. Webb Memorial Auditorium of the National Aeronautics and Space Administration (NASA), located at 300 E Street SW, Washington, DC. 2. By October 31, 2019, any person wishing to speak at the hearing shall file with the Board a notice of intent to participate identifying the party, the 5 See Cent. Power & Light Co. v. S. Pac. Transp. Co., 1 S.T.B. 1059 (1996), clarified, 2 S.T.B. 235 (1997), aff’d sub nom. MidAmerican Energy Co. v. STB, 169 F.3d 1099 (8th Cir. 1999). VerDate Sep<11>2014 17:05 Sep 16, 2019 Jkt 247001 proposed speaker, and the amount of time requested. 3. Written testimony by hearing participants, and written submissions by interested persons who will not appear at the hearing, shall be filed by November 26, 2019. 4. Filings will be posted to the Board’s website and need not be served on any hearing participants or other commenters. 5. This decision is effective on its service date. 6. This decision will be published in the Federal Register. Decided: September 12, 2019. By the Board, Allison C. Davis, Director, Office of Proceedings. Kenyatta Clay, Clearance Clerk. [FR Doc. 2019–20076 Filed 9–16–19; 8:45 am] BILLING CODE 4915–01–P SUSQUEHANNA RIVER BASIN COMMISSION Projects Approved for Consumptive Uses of Water Susquehanna River Basin Commission. ACTION: Notice. AGENCY: This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES. DATES: August 1–31, 2019. ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address. SUPPLEMENTARY INFORMATION: This notice lists the projects, described below, receiving approval for the consumptive use of water pursuant to the Commission’s approval by rule process set forth in 18 CFR 806.22(e) and § 806.22 (f) for the time period specified above: SUMMARY: Approvals By Rule—Issued Under 18 CFR 806.22(e) 1. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Middlesex Township Municipal Authority); ABR–201908015; Various Municipalities Located In Berks, Cumberland, Dauphin, Lebanon, and York Counties, Pa.; Consumptive Use of Up to 0.288 mgd; Approval Date: August 16, 2019. PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 48983 2. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Altoona Water Authority); ABR–201908016; Various Municipalities Located In Blair and Huntingdon Counties, Pa.; Consumptive Use of Up to 0.200 mgd; Approval Date: August 27, 2019. 3. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Mount Union Municipal Authority); ABR–201908017; Various Municipalities Located In Blair, Huntingdon, Juniata, and Perry Counties, Pa.; Consumptive Use of Up to 0.200 mgd; Approval Date: August 27, 2019. 4. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA American Water Company—Hershey District); ABR– 201908018; Various Municipalities Located In Dauphin, Lebanon, and Berks Counties, Pa.; Consumptive Use of Up to 0.288 mgd; Approval Date: August 27, 2019. 5. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA American Water Company—Mechanicsburg District); ABR–201908019; Various Municipalities Located In Cumberland, York, and Dauphin Counties, Pa.; Consumptive Use of Up to 0.266 mgd; Approval Date: August 27, 2019. 6. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Elverson Water Company, Inc.); ABR–201908020; Various Municipalities Located In Dauphin, Lebanon, Berks, and Chester Counties, Pa.; Consumptive Use of Up to 0.070 mgd; Approval Date: August 29, 2019. Water Source Approvals Issued Under 18 CFR 806.22(f) 1. ARD Operating, LLC; Pad ID: COP Tract 289 Pad A; ABR–20090409.R2; McHenry Township, Lycoming County, Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: August 2, 2019. 2. Chief Oil & Gas, LLC; Pad ID: Reibson Drilling Pad; ABR– 201407014.R1; Elkland Township, Sullivan County, Pa.; Consumptive Use of Up to 2.5000 mgd; Approval Date: August 2, 2019. 3. Inflection Energy (PA), LLC; Pad ID: Reynolds Well Site; ABR–201908002; Gamble Township, Lycoming County, Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: August 2, 2019. 4. Chesapeake Appalachia, L.L.C.; Pad ID: Hunter, ABR–201408001.R1; Windham Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 8, 2019. 5. Seneca Resources Company, LLC; Pad ID: CRV Pad C09–G; ABR– 201408002.R1; Shippen Township, Cameron County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 12, 2019. E:\FR\FM\17SEN1.SGM 17SEN1 jbell on DSK3GLQ082PROD with NOTICES 48984 Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices 6. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract 729 Pad-A; ABR–200908003; Cummings Township, Lycoming County, Pa.; Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019. 7. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract 293 Pad-A; ABR–201908004; Cummings Township, Lycoming County, Pa.; Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019. 8. Chesapeake Appalachia, L.L.C.; Pad ID: Eileen, ABR–20090806.R2; Terry Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 13, 2019. 9. Chesapeake Appalachia, L.L.C.; Pad ID: Claudia, ABR–20090807.R2; Smithfield Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 13, 2019. 10. Chesapeake Appalachia, L.L.C.; Pad ID: Fitzsimmons, ABR– 20090809.R2; Albany Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 13, 2019. 11. Chesapeake Appalachia, L.L.C.; Pad ID: Bacorn, ABR–201408003.R1; Overton Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: August 15, 2019. 12. EXCO Resources (PA), LLC; Pad ID: Litke 1H, 2H; ABR–20090425.R2; Burnside Township, Centre County, Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: August 19, 2019. 13. EXCO Resources (PA), LLC; Pad ID: Litke (7H & 8H); ABR–20090426.R2; Burnside Township, Centre County, Pa.; Consumptive Use of Up to 4.0000 mgd; Approval Date: August 19, 2019. 14. EXCO Resources (PA), LLC; Pad ID: Litke (14H, 15H, 16H); ABR– 20090431.R2; Burnside Township, Centre County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 19, 2019. 15. EXCO Resources (PA), LLC; Pad ID: Barto Unit #1H, #2H; ABR– 20090514.R2; Penn Township, Lycoming County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 19, 2019. 16. Chief Oil & Gas, LLC; Pad ID: Phelps Unit #1H; ABR–20090813.R2; Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 19, 2019. 17. Seneca Resources Company, LLC; Pad ID: T. Wivell Horizontal Pad; ABR– 20090814.R2; Covington Township, Tioga County, Pa.; Consumptive Use of Up to 2.0000 mgd; Approval Date: August 19, 2019. 18. Chief Oil & Gas, LLC; Pad ID: PA Woodlands Drilling Pad; ABR– VerDate Sep<11>2014 17:05 Sep 16, 2019 Jkt 247001 201408006.R1; Fox Township, Sullivan County, Pa.; Consumptive Use of Up to 2.5000 mgd; Approval Date: August 19, 2019. 19. Cabot Oil & Gas Corporation; Pad ID: DiazM P2; ABR–201908001; Harford Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 19, 2019. 20. EXCO Resources (PA), LLC; Pad ID: Zinck Unit #1 Pad; ABR–201908014; Watson Township, Lycoming County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 19, 2019. 21. Cabot Oil & Gas Corporation; Pad ID: BrooksW P2; ABR–201908009; Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 22, 2019. 22. Cabot Oil & Gas Corporation; Pad ID: ChudleighW P1; ABR–201908005; Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019. 23. Cabot Oil & Gas Corporation; Pad ID: Elk Lake School District P1; ABR– 201908006; Dimock Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019. 24. Cabot Oil & Gas Corporation; Pad ID: BrooksJ P1; ABR–201908007; Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019. 25. Cabot Oil & Gas Corporation; Pad ID: PowersN P2; ABR–201908008; Middletown Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019. 26. Cabot Oil & Gas Corporation; Pad ID: HunsingerA P1; ABR–201908010; Dimock Township, Susquehanna County, Pa.; Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019. 27. SWN Production Company, LLC; Pad ID: RU–72–FOLKVARD–PAD; ABR–201908011; Jackson Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.9990 mgd; Approval Date: August 26, 2019. 28. SWN Production Company, LLC; Pad ID: PU–BB-Price-Pad; ABR– 201908012; Lenox Township, Susquehanna County, Pa.; Consumptive Use of Up to 4.9990 mgd; Approval Date: August 26, 2019. 29. SWN Production Company, LLC; Pad ID: WR–22-Five E’s-Pad; ABR– 201908013; Middletown Township, Susquehanna County, Pa.; Consumptive Use of Up to 3.0000 mgd; Approval Date: August 26, 2019. PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 30. EQT Production Company; Pad ID: Hurd; ABR–20090802.R2; Ferguson Township, Clearfield County, Pa.; Consu Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. Dated: September 12, 2019. Jason E. Oyler, General Counsel and Secretary to the Commission. [FR Doc. 2019–20081 Filed 9–16–19; 8:45 am] BILLING CODE 7040–01–P SUSQUEHANNA RIVER BASIN COMMISSION Grandfathering (GF) Registration Notice Susquehanna River Basin Commission. AGENCY: ACTION: Notice. This notice lists Grandfathering Registration for projects by the Susquehanna River Basin Commission during the period set forth in DATES. SUMMARY: DATES: August 1–31, 2019. Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110–1788. ADDRESSES: FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address. This notice lists GF Registration for projects, described below, pursuant to 18 CFR 806, Subpart E for the time period specified above: SUPPLEMENTARY INFORMATION: Grandfathering Registration Under 18 CFR Part 806, Subpart E 1. Gratz Borough Water Revenue Fund—Gratz Borough Water Company, GF Certificate No. GF–201908042, Gratz Borough, Dauphin County, Pa.; Well 1, Bower Spring, and Cold Spring; Issue Date: August 20, 2019. 2. Carlisle Borough Municipal Authority, GF Certificate No. GF– 201908043, North Middleton Township, Cumberland County, Pa.; Conodoguinet Creek; Issue Date: August 20, 2019. 3. Afton Golf Course, Inc—Afton Golf Club, GF Certificate No. GF–201908044, Town of Afton, Chenango County, N.Y.; Pond 7; Issue Date: August 20, 2019. Authority: Pub. L. 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808. E:\FR\FM\17SEN1.SGM 17SEN1

Agencies

[Federal Register Volume 84, Number 180 (Tuesday, September 17, 2019)]
[Notices]
[Pages 48983-48984]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20081]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Projects Approved for Consumptive Uses of Water

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: This notice lists the projects approved by rule by the 
Susquehanna River Basin Commission during the period set forth in 
DATES.

DATES: August 1-31, 2019.

ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street, 
Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and 
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax: 
(717) 238-2436; email: [email protected]. Regular mail inquiries may be 
sent to the above address.

SUPPLEMENTARY INFORMATION: This notice lists the projects, described 
below, receiving approval for the consumptive use of water pursuant to 
the Commission's approval by rule process set forth in 18 CFR 806.22(e) 
and Sec.  806.22 (f) for the time period specified above:

Approvals By Rule--Issued Under 18 CFR 806.22(e)

    1. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Middlesex 
Township Municipal Authority); ABR-201908015; Various Municipalities 
Located In Berks, Cumberland, Dauphin, Lebanon, and York Counties, Pa.; 
Consumptive Use of Up to 0.288 mgd; Approval Date: August 16, 2019.
    2. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Altoona 
Water Authority); ABR-201908016; Various Municipalities Located In 
Blair and Huntingdon Counties, Pa.; Consumptive Use of Up to 0.200 mgd; 
Approval Date: August 27, 2019.
    3. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Mount 
Union Municipal Authority); ABR-201908017; Various Municipalities 
Located In Blair, Huntingdon, Juniata, and Perry Counties, Pa.; 
Consumptive Use of Up to 0.200 mgd; Approval Date: August 27, 2019.
    4. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA 
American Water Company--Hershey District); ABR-201908018; Various 
Municipalities Located In Dauphin, Lebanon, and Berks Counties, Pa.; 
Consumptive Use of Up to 0.288 mgd; Approval Date: August 27, 2019.
    5. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA 
American Water Company--Mechanicsburg District); ABR-201908019; Various 
Municipalities Located In Cumberland, York, and Dauphin Counties, Pa.; 
Consumptive Use of Up to 0.266 mgd; Approval Date: August 27, 2019.
    6. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Elverson 
Water Company, Inc.); ABR-201908020; Various Municipalities Located In 
Dauphin, Lebanon, Berks, and Chester Counties, Pa.; Consumptive Use of 
Up to 0.070 mgd; Approval Date: August 29, 2019.

Water Source Approvals Issued Under 18 CFR 806.22(f)

    1. ARD Operating, LLC; Pad ID: COP Tract 289 Pad A; ABR-
20090409.R2; McHenry Township, Lycoming County, Pa.; Consumptive Use of 
Up to 4.0000 mgd; Approval Date: August 2, 2019.
    2. Chief Oil & Gas, LLC; Pad ID: Reibson Drilling Pad; ABR-
201407014.R1; Elkland Township, Sullivan County, Pa.; Consumptive Use 
of Up to 2.5000 mgd; Approval Date: August 2, 2019.
    3. Inflection Energy (PA), LLC; Pad ID: Reynolds Well Site; ABR-
201908002; Gamble Township, Lycoming County, Pa.; Consumptive Use of Up 
to 4.0000 mgd; Approval Date: August 2, 2019.
    4. Chesapeake Appalachia, L.L.C.; Pad ID: Hunter, ABR-201408001.R1; 
Windham Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 
mgd; Approval Date: August 8, 2019.
    5. Seneca Resources Company, LLC; Pad ID: CRV Pad C09-G; ABR-
201408002.R1; Shippen Township, Cameron County, Pa.; Consumptive Use of 
Up to 7.5000 mgd; Approval Date: August 12, 2019.

[[Page 48984]]

    6. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract 
729 Pad-A; ABR-200908003; Cummings Township, Lycoming County, Pa.; 
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019.
    7. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract 
293 Pad-A; ABR-201908004; Cummings Township, Lycoming County, Pa.; 
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019.
    8. Chesapeake Appalachia, L.L.C.; Pad ID: Eileen, ABR-20090806.R2; 
Terry Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000 
mgd; Approval Date: August 13, 2019.
    9. Chesapeake Appalachia, L.L.C.; Pad ID: Claudia, ABR-20090807.R2; 
Smithfield Township, Bradford County, Pa.; Consumptive Use of Up to 
7.5000 mgd; Approval Date: August 13, 2019.
    10. Chesapeake Appalachia, L.L.C.; Pad ID: Fitzsimmons, ABR-
20090809.R2; Albany Township, Bradford County, Pa.; Consumptive Use of 
Up to 7.5000 mgd; Approval Date: August 13, 2019.
    11. Chesapeake Appalachia, L.L.C.; Pad ID: Bacorn, ABR-
201408003.R1; Overton Township, Bradford County, Pa.; Consumptive Use 
of Up to 7.5000 mgd; Approval Date: August 15, 2019.
    12. EXCO Resources (PA), LLC; Pad ID: Litke 1H, 2H; ABR-
20090425.R2; Burnside Township, Centre County, Pa.; Consumptive Use of 
Up to 4.0000 mgd; Approval Date: August 19, 2019.
    13. EXCO Resources (PA), LLC; Pad ID: Litke (7H & 8H); ABR-
20090426.R2; Burnside Township, Centre County, Pa.; Consumptive Use of 
Up to 4.0000 mgd; Approval Date: August 19, 2019.
    14. EXCO Resources (PA), LLC; Pad ID: Litke (14H, 15H, 16H); ABR-
20090431.R2; Burnside Township, Centre County, Pa.; Consumptive Use of 
Up to 5.0000 mgd; Approval Date: August 19, 2019.
    15. EXCO Resources (PA), LLC; Pad ID: Barto Unit #1H, #2H; ABR-
20090514.R2; Penn Township, Lycoming County, Pa.; Consumptive Use of Up 
to 5.0000 mgd; Approval Date: August 19, 2019.
    16. Chief Oil & Gas, LLC; Pad ID: Phelps Unit #1H; ABR-20090813.R2; 
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to 
5.0000 mgd; Approval Date: August 19, 2019.
    17. Seneca Resources Company, LLC; Pad ID: T. Wivell Horizontal 
Pad; ABR-20090814.R2; Covington Township, Tioga County, Pa.; 
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 19, 2019.
    18. Chief Oil & Gas, LLC; Pad ID: PA Woodlands Drilling Pad; ABR-
201408006.R1; Fox Township, Sullivan County, Pa.; Consumptive Use of Up 
to 2.5000 mgd; Approval Date: August 19, 2019.
    19. Cabot Oil & Gas Corporation; Pad ID: DiazM P2; ABR-201908001; 
Harford Township, Susquehanna County, Pa.; Consumptive Use of Up to 
5.0000 mgd; Approval Date: August 19, 2019.
    20. EXCO Resources (PA), LLC; Pad ID: Zinck Unit #1 Pad; ABR-
201908014; Watson Township, Lycoming County, Pa.; Consumptive Use of Up 
to 5.0000 mgd; Approval Date: August 19, 2019.
    21. Cabot Oil & Gas Corporation; Pad ID: BrooksW P2; ABR-201908009; 
Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 
5.0000 mgd; Approval Date: August 22, 2019.
    22. Cabot Oil & Gas Corporation; Pad ID: ChudleighW P1; ABR-
201908005; Springville Township, Susquehanna County, Pa.; Consumptive 
Use of Up to 5.0000 mgd; Approval Date: August 26, 2019.
    23. Cabot Oil & Gas Corporation; Pad ID: Elk Lake School District 
P1; ABR-201908006; Dimock Township, Susquehanna County, Pa.; 
Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019.
    24. Cabot Oil & Gas Corporation; Pad ID: BrooksJ P1; ABR-201908007; 
Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to 
5.0000 mgd; Approval Date: August 26, 2019.
    25. Cabot Oil & Gas Corporation; Pad ID: PowersN P2; ABR-201908008; 
Middletown Township, Susquehanna County, Pa.; Consumptive Use of Up to 
5.0000 mgd; Approval Date: August 26, 2019.
    26. Cabot Oil & Gas Corporation; Pad ID: HunsingerA P1; ABR-
201908010; Dimock Township, Susquehanna County, Pa.; Consumptive Use of 
Up to 5.0000 mgd; Approval Date: August 26, 2019.
    27. SWN Production Company, LLC; Pad ID: RU-72-FOLKVARD-PAD; ABR-
201908011; Jackson Township, Susquehanna County, Pa.; Consumptive Use 
of Up to 4.9990 mgd; Approval Date: August 26, 2019.
    28. SWN Production Company, LLC; Pad ID: PU-BB-Price-Pad; ABR-
201908012; Lenox Township, Susquehanna County, Pa.; Consumptive Use of 
Up to 4.9990 mgd; Approval Date: August 26, 2019.
    29. SWN Production Company, LLC; Pad ID: WR-22-Five E's-Pad; ABR-
201908013; Middletown Township, Susquehanna County, Pa.; Consumptive 
Use of Up to 3.0000 mgd; Approval Date: August 26, 2019.
    30. EQT Production Company; Pad ID: Hurd; ABR-20090802.R2; Ferguson 
Township, Clearfield County, Pa.; Consu

    Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 
806 and 808.

    Dated: September 12, 2019.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2019-20081 Filed 9-16-19; 8:45 am]
 BILLING CODE 7040-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.