Projects Approved for Consumptive Uses of Water, 48983-48984 [2019-20081]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices
2019. Written submissions by interested
persons who will not appear at the
hearing should also be filed by
November 26, 2019. All participants and
interested persons are asked to address
the following RRTF recommendations
in their written testimony or
submissions and at the hearing:
• Definition of long-term revenue
adequacy: The RRTF recommended
determining long-term revenue
adequacy by looking at the annual
determinations over ‘‘the shortest period
of time, not less than five years, that
includes both a year in which a
recession began and a year that follows
a year in which a recession began.’’
RRTF Report 13, 33.
• Rate increase constraint: The RRTF
recommended considering a rate
increase constraint for long-term
revenue-adequate carriers, which would
identify a point beyond which further
application of differential pricing would
be unwarranted. See RRTF Report 13,
36–39.
• Bottleneck changes: The RRTF
recommended considering suspension
of the Board’s Bottleneck 5 protections
as applied to long-term revenueadequate carriers. See RRTF Report 13,
39–41.
• Simplified Stand-Alone Cost
(Simplified-SAC) changes: For purposes
of considering whether a long-term
revenue-adequate carrier’s rate is
reasonable under Simplified-SAC, the
RRTF recommended reinstating the
simplification of the Road Property
Investment analysis. See RRTF Report
13, 41–42, & app. B.
Board Releases and Transcript
Availability: Decisions and notices of
the Board, including this notice, are
available on the Board’s website at
www.stb.gov. The Board will issue a
separate notice containing instructions
for attendance at the hearing and the
schedule of appearances. Please note
that streaming and recording systems
will not be available for this hearing. As
soon as a transcript is available, it will
be posted on the Board’s website.
It is ordered
1. A public hearing will be held on
December 12, 2019, at 9:30 a.m., in the
James E. Webb Memorial Auditorium of
the National Aeronautics and Space
Administration (NASA), located at 300
E Street SW, Washington, DC.
2. By October 31, 2019, any person
wishing to speak at the hearing shall file
with the Board a notice of intent to
participate identifying the party, the
5 See Cent. Power & Light Co. v. S. Pac. Transp.
Co., 1 S.T.B. 1059 (1996), clarified, 2 S.T.B. 235
(1997), aff’d sub nom. MidAmerican Energy Co. v.
STB, 169 F.3d 1099 (8th Cir. 1999).
VerDate Sep<11>2014
17:05 Sep 16, 2019
Jkt 247001
proposed speaker, and the amount of
time requested.
3. Written testimony by hearing
participants, and written submissions
by interested persons who will not
appear at the hearing, shall be filed by
November 26, 2019.
4. Filings will be posted to the Board’s
website and need not be served on any
hearing participants or other
commenters.
5. This decision is effective on its
service date.
6. This decision will be published in
the Federal Register.
Decided: September 12, 2019.
By the Board, Allison C. Davis, Director,
Office of Proceedings.
Kenyatta Clay,
Clearance Clerk.
[FR Doc. 2019–20076 Filed 9–16–19; 8:45 am]
BILLING CODE 4915–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Projects Approved for Consumptive
Uses of Water
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
This notice lists the projects
approved by rule by the Susquehanna
River Basin Commission during the
period set forth in DATES.
DATES: August 1–31, 2019.
ADDRESSES: Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
SUPPLEMENTARY INFORMATION: This
notice lists the projects, described
below, receiving approval for the
consumptive use of water pursuant to
the Commission’s approval by rule
process set forth in 18 CFR 806.22(e)
and § 806.22 (f) for the time period
specified above:
SUMMARY:
Approvals By Rule—Issued Under 18
CFR 806.22(e)
1. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (Middlesex Township
Municipal Authority); ABR–201908015;
Various Municipalities Located In
Berks, Cumberland, Dauphin, Lebanon,
and York Counties, Pa.; Consumptive
Use of Up to 0.288 mgd; Approval Date:
August 16, 2019.
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
48983
2. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (Altoona Water
Authority); ABR–201908016; Various
Municipalities Located In Blair and
Huntingdon Counties, Pa.; Consumptive
Use of Up to 0.200 mgd; Approval Date:
August 27, 2019.
3. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (Mount Union
Municipal Authority); ABR–201908017;
Various Municipalities Located In Blair,
Huntingdon, Juniata, and Perry
Counties, Pa.; Consumptive Use of Up to
0.200 mgd; Approval Date: August 27,
2019.
4. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (PA American Water
Company—Hershey District); ABR–
201908018; Various Municipalities
Located In Dauphin, Lebanon, and
Berks Counties, Pa.; Consumptive Use of
Up to 0.288 mgd; Approval Date: August
27, 2019.
5. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (PA American Water
Company—Mechanicsburg District);
ABR–201908019; Various
Municipalities Located In Cumberland,
York, and Dauphin Counties, Pa.;
Consumptive Use of Up to 0.266 mgd;
Approval Date: August 27, 2019.
6. Sunoco Pipeline L.P.; Mariner East
2 Pipeline Project (Elverson Water
Company, Inc.); ABR–201908020;
Various Municipalities Located In
Dauphin, Lebanon, Berks, and Chester
Counties, Pa.; Consumptive Use of Up to
0.070 mgd; Approval Date: August 29,
2019.
Water Source Approvals Issued Under
18 CFR 806.22(f)
1. ARD Operating, LLC; Pad ID: COP
Tract 289 Pad A; ABR–20090409.R2;
McHenry Township, Lycoming County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: August 2, 2019.
2. Chief Oil & Gas, LLC; Pad ID:
Reibson Drilling Pad; ABR–
201407014.R1; Elkland Township,
Sullivan County, Pa.; Consumptive Use
of Up to 2.5000 mgd; Approval Date:
August 2, 2019.
3. Inflection Energy (PA), LLC; Pad ID:
Reynolds Well Site; ABR–201908002;
Gamble Township, Lycoming County,
Pa.; Consumptive Use of Up to 4.0000
mgd; Approval Date: August 2, 2019.
4. Chesapeake Appalachia, L.L.C.; Pad
ID: Hunter, ABR–201408001.R1;
Windham Township, Wyoming County,
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: August 8, 2019.
5. Seneca Resources Company, LLC;
Pad ID: CRV Pad C09–G; ABR–
201408002.R1; Shippen Township,
Cameron County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
August 12, 2019.
E:\FR\FM\17SEN1.SGM
17SEN1
jbell on DSK3GLQ082PROD with NOTICES
48984
Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices
6. Pennsylvania General Energy
Company, L.L.C.; Pad ID: COP Tract 729
Pad-A; ABR–200908003; Cummings
Township, Lycoming County, Pa.;
Consumptive Use of Up to 2.0000 mgd;
Approval Date: August 12, 2019.
7. Pennsylvania General Energy
Company, L.L.C.; Pad ID: COP Tract 293
Pad-A; ABR–201908004; Cummings
Township, Lycoming County, Pa.;
Consumptive Use of Up to 2.0000 mgd;
Approval Date: August 12, 2019.
8. Chesapeake Appalachia, L.L.C.; Pad
ID: Eileen, ABR–20090806.R2; Terry
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: August 13, 2019.
9. Chesapeake Appalachia, L.L.C.; Pad
ID: Claudia, ABR–20090807.R2;
Smithfield Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: August 13, 2019.
10. Chesapeake Appalachia, L.L.C.;
Pad ID: Fitzsimmons, ABR–
20090809.R2; Albany Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
August 13, 2019.
11. Chesapeake Appalachia, L.L.C.;
Pad ID: Bacorn, ABR–201408003.R1;
Overton Township, Bradford County,
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: August 15, 2019.
12. EXCO Resources (PA), LLC; Pad
ID: Litke 1H, 2H; ABR–20090425.R2;
Burnside Township, Centre County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: August 19, 2019.
13. EXCO Resources (PA), LLC; Pad
ID: Litke (7H & 8H); ABR–20090426.R2;
Burnside Township, Centre County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: August 19, 2019.
14. EXCO Resources (PA), LLC; Pad
ID: Litke (14H, 15H, 16H); ABR–
20090431.R2; Burnside Township,
Centre County, Pa.; Consumptive Use of
Up to 5.0000 mgd; Approval Date:
August 19, 2019.
15. EXCO Resources (PA), LLC; Pad
ID: Barto Unit #1H, #2H; ABR–
20090514.R2; Penn Township,
Lycoming County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval
Date: August 19, 2019.
16. Chief Oil & Gas, LLC; Pad ID:
Phelps Unit #1H; ABR–20090813.R2;
Lathrop Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 19,
2019.
17. Seneca Resources Company, LLC;
Pad ID: T. Wivell Horizontal Pad; ABR–
20090814.R2; Covington Township,
Tioga County, Pa.; Consumptive Use of
Up to 2.0000 mgd; Approval Date:
August 19, 2019.
18. Chief Oil & Gas, LLC; Pad ID: PA
Woodlands Drilling Pad; ABR–
VerDate Sep<11>2014
17:05 Sep 16, 2019
Jkt 247001
201408006.R1; Fox Township, Sullivan
County, Pa.; Consumptive Use of Up to
2.5000 mgd; Approval Date: August 19,
2019.
19. Cabot Oil & Gas Corporation; Pad
ID: DiazM P2; ABR–201908001; Harford
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 5.0000 mgd;
Approval Date: August 19, 2019.
20. EXCO Resources (PA), LLC; Pad
ID: Zinck Unit #1 Pad; ABR–201908014;
Watson Township, Lycoming County,
Pa.; Consumptive Use of Up to 5.0000
mgd; Approval Date: August 19, 2019.
21. Cabot Oil & Gas Corporation; Pad
ID: BrooksW P2; ABR–201908009;
Springville Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 22,
2019.
22. Cabot Oil & Gas Corporation; Pad
ID: ChudleighW P1; ABR–201908005;
Springville Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26,
2019.
23. Cabot Oil & Gas Corporation; Pad
ID: Elk Lake School District P1; ABR–
201908006; Dimock Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval
Date: August 26, 2019.
24. Cabot Oil & Gas Corporation; Pad
ID: BrooksJ P1; ABR–201908007;
Springville Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26,
2019.
25. Cabot Oil & Gas Corporation; Pad
ID: PowersN P2; ABR–201908008;
Middletown Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26,
2019.
26. Cabot Oil & Gas Corporation; Pad
ID: HunsingerA P1; ABR–201908010;
Dimock Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26,
2019.
27. SWN Production Company, LLC;
Pad ID: RU–72–FOLKVARD–PAD;
ABR–201908011; Jackson Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval
Date: August 26, 2019.
28. SWN Production Company, LLC;
Pad ID: PU–BB-Price-Pad; ABR–
201908012; Lenox Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.9990 mgd; Approval
Date: August 26, 2019.
29. SWN Production Company, LLC;
Pad ID: WR–22-Five E’s-Pad; ABR–
201908013; Middletown Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 3.0000 mgd; Approval
Date: August 26, 2019.
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
30. EQT Production Company; Pad ID:
Hurd; ABR–20090802.R2; Ferguson
Township, Clearfield County, Pa.;
Consu
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806 and 808.
Dated: September 12, 2019.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2019–20081 Filed 9–16–19; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Grandfathering (GF) Registration
Notice
Susquehanna River Basin
Commission.
AGENCY:
ACTION:
Notice.
This notice lists
Grandfathering Registration for projects
by the Susquehanna River Basin
Commission during the period set forth
in DATES.
SUMMARY:
DATES:
August 1–31, 2019.
Susquehanna River Basin
Commission, 4423 North Front Street,
Harrisburg, PA 17110–1788.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone:
(717) 238–0423, ext. 1312; fax: (717)
238–2436; email: joyler@srbc.net.
Regular mail inquiries may be sent to
the above address.
This
notice lists GF Registration for projects,
described below, pursuant to 18 CFR
806, Subpart E for the time period
specified above:
SUPPLEMENTARY INFORMATION:
Grandfathering Registration Under 18
CFR Part 806, Subpart E
1. Gratz Borough Water Revenue
Fund—Gratz Borough Water Company,
GF Certificate No. GF–201908042, Gratz
Borough, Dauphin County, Pa.; Well 1,
Bower Spring, and Cold Spring; Issue
Date: August 20, 2019.
2. Carlisle Borough Municipal
Authority, GF Certificate No. GF–
201908043, North Middleton Township,
Cumberland County, Pa.; Conodoguinet
Creek; Issue Date: August 20, 2019.
3. Afton Golf Course, Inc—Afton Golf
Club, GF Certificate No. GF–201908044,
Town of Afton, Chenango County, N.Y.;
Pond 7; Issue Date: August 20, 2019.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806 and 808.
E:\FR\FM\17SEN1.SGM
17SEN1
Agencies
[Federal Register Volume 84, Number 180 (Tuesday, September 17, 2019)]
[Notices]
[Pages 48983-48984]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20081]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Projects Approved for Consumptive Uses of Water
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice lists the projects approved by rule by the
Susquehanna River Basin Commission during the period set forth in
DATES.
DATES: August 1-31, 2019.
ADDRESSES: Susquehanna River Basin Commission, 4423 North Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax:
(717) 238-2436; email: [email protected]. Regular mail inquiries may be
sent to the above address.
SUPPLEMENTARY INFORMATION: This notice lists the projects, described
below, receiving approval for the consumptive use of water pursuant to
the Commission's approval by rule process set forth in 18 CFR 806.22(e)
and Sec. 806.22 (f) for the time period specified above:
Approvals By Rule--Issued Under 18 CFR 806.22(e)
1. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Middlesex
Township Municipal Authority); ABR-201908015; Various Municipalities
Located In Berks, Cumberland, Dauphin, Lebanon, and York Counties, Pa.;
Consumptive Use of Up to 0.288 mgd; Approval Date: August 16, 2019.
2. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Altoona
Water Authority); ABR-201908016; Various Municipalities Located In
Blair and Huntingdon Counties, Pa.; Consumptive Use of Up to 0.200 mgd;
Approval Date: August 27, 2019.
3. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Mount
Union Municipal Authority); ABR-201908017; Various Municipalities
Located In Blair, Huntingdon, Juniata, and Perry Counties, Pa.;
Consumptive Use of Up to 0.200 mgd; Approval Date: August 27, 2019.
4. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA
American Water Company--Hershey District); ABR-201908018; Various
Municipalities Located In Dauphin, Lebanon, and Berks Counties, Pa.;
Consumptive Use of Up to 0.288 mgd; Approval Date: August 27, 2019.
5. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (PA
American Water Company--Mechanicsburg District); ABR-201908019; Various
Municipalities Located In Cumberland, York, and Dauphin Counties, Pa.;
Consumptive Use of Up to 0.266 mgd; Approval Date: August 27, 2019.
6. Sunoco Pipeline L.P.; Mariner East 2 Pipeline Project (Elverson
Water Company, Inc.); ABR-201908020; Various Municipalities Located In
Dauphin, Lebanon, Berks, and Chester Counties, Pa.; Consumptive Use of
Up to 0.070 mgd; Approval Date: August 29, 2019.
Water Source Approvals Issued Under 18 CFR 806.22(f)
1. ARD Operating, LLC; Pad ID: COP Tract 289 Pad A; ABR-
20090409.R2; McHenry Township, Lycoming County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date: August 2, 2019.
2. Chief Oil & Gas, LLC; Pad ID: Reibson Drilling Pad; ABR-
201407014.R1; Elkland Township, Sullivan County, Pa.; Consumptive Use
of Up to 2.5000 mgd; Approval Date: August 2, 2019.
3. Inflection Energy (PA), LLC; Pad ID: Reynolds Well Site; ABR-
201908002; Gamble Township, Lycoming County, Pa.; Consumptive Use of Up
to 4.0000 mgd; Approval Date: August 2, 2019.
4. Chesapeake Appalachia, L.L.C.; Pad ID: Hunter, ABR-201408001.R1;
Windham Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: August 8, 2019.
5. Seneca Resources Company, LLC; Pad ID: CRV Pad C09-G; ABR-
201408002.R1; Shippen Township, Cameron County, Pa.; Consumptive Use of
Up to 7.5000 mgd; Approval Date: August 12, 2019.
[[Page 48984]]
6. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract
729 Pad-A; ABR-200908003; Cummings Township, Lycoming County, Pa.;
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019.
7. Pennsylvania General Energy Company, L.L.C.; Pad ID: COP Tract
293 Pad-A; ABR-201908004; Cummings Township, Lycoming County, Pa.;
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 12, 2019.
8. Chesapeake Appalachia, L.L.C.; Pad ID: Eileen, ABR-20090806.R2;
Terry Township, Bradford County, Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: August 13, 2019.
9. Chesapeake Appalachia, L.L.C.; Pad ID: Claudia, ABR-20090807.R2;
Smithfield Township, Bradford County, Pa.; Consumptive Use of Up to
7.5000 mgd; Approval Date: August 13, 2019.
10. Chesapeake Appalachia, L.L.C.; Pad ID: Fitzsimmons, ABR-
20090809.R2; Albany Township, Bradford County, Pa.; Consumptive Use of
Up to 7.5000 mgd; Approval Date: August 13, 2019.
11. Chesapeake Appalachia, L.L.C.; Pad ID: Bacorn, ABR-
201408003.R1; Overton Township, Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date: August 15, 2019.
12. EXCO Resources (PA), LLC; Pad ID: Litke 1H, 2H; ABR-
20090425.R2; Burnside Township, Centre County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date: August 19, 2019.
13. EXCO Resources (PA), LLC; Pad ID: Litke (7H & 8H); ABR-
20090426.R2; Burnside Township, Centre County, Pa.; Consumptive Use of
Up to 4.0000 mgd; Approval Date: August 19, 2019.
14. EXCO Resources (PA), LLC; Pad ID: Litke (14H, 15H, 16H); ABR-
20090431.R2; Burnside Township, Centre County, Pa.; Consumptive Use of
Up to 5.0000 mgd; Approval Date: August 19, 2019.
15. EXCO Resources (PA), LLC; Pad ID: Barto Unit #1H, #2H; ABR-
20090514.R2; Penn Township, Lycoming County, Pa.; Consumptive Use of Up
to 5.0000 mgd; Approval Date: August 19, 2019.
16. Chief Oil & Gas, LLC; Pad ID: Phelps Unit #1H; ABR-20090813.R2;
Lathrop Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 19, 2019.
17. Seneca Resources Company, LLC; Pad ID: T. Wivell Horizontal
Pad; ABR-20090814.R2; Covington Township, Tioga County, Pa.;
Consumptive Use of Up to 2.0000 mgd; Approval Date: August 19, 2019.
18. Chief Oil & Gas, LLC; Pad ID: PA Woodlands Drilling Pad; ABR-
201408006.R1; Fox Township, Sullivan County, Pa.; Consumptive Use of Up
to 2.5000 mgd; Approval Date: August 19, 2019.
19. Cabot Oil & Gas Corporation; Pad ID: DiazM P2; ABR-201908001;
Harford Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 19, 2019.
20. EXCO Resources (PA), LLC; Pad ID: Zinck Unit #1 Pad; ABR-
201908014; Watson Township, Lycoming County, Pa.; Consumptive Use of Up
to 5.0000 mgd; Approval Date: August 19, 2019.
21. Cabot Oil & Gas Corporation; Pad ID: BrooksW P2; ABR-201908009;
Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 22, 2019.
22. Cabot Oil & Gas Corporation; Pad ID: ChudleighW P1; ABR-
201908005; Springville Township, Susquehanna County, Pa.; Consumptive
Use of Up to 5.0000 mgd; Approval Date: August 26, 2019.
23. Cabot Oil & Gas Corporation; Pad ID: Elk Lake School District
P1; ABR-201908006; Dimock Township, Susquehanna County, Pa.;
Consumptive Use of Up to 5.0000 mgd; Approval Date: August 26, 2019.
24. Cabot Oil & Gas Corporation; Pad ID: BrooksJ P1; ABR-201908007;
Springville Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26, 2019.
25. Cabot Oil & Gas Corporation; Pad ID: PowersN P2; ABR-201908008;
Middletown Township, Susquehanna County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: August 26, 2019.
26. Cabot Oil & Gas Corporation; Pad ID: HunsingerA P1; ABR-
201908010; Dimock Township, Susquehanna County, Pa.; Consumptive Use of
Up to 5.0000 mgd; Approval Date: August 26, 2019.
27. SWN Production Company, LLC; Pad ID: RU-72-FOLKVARD-PAD; ABR-
201908011; Jackson Township, Susquehanna County, Pa.; Consumptive Use
of Up to 4.9990 mgd; Approval Date: August 26, 2019.
28. SWN Production Company, LLC; Pad ID: PU-BB-Price-Pad; ABR-
201908012; Lenox Township, Susquehanna County, Pa.; Consumptive Use of
Up to 4.9990 mgd; Approval Date: August 26, 2019.
29. SWN Production Company, LLC; Pad ID: WR-22-Five E's-Pad; ABR-
201908013; Middletown Township, Susquehanna County, Pa.; Consumptive
Use of Up to 3.0000 mgd; Approval Date: August 26, 2019.
30. EQT Production Company; Pad ID: Hurd; ABR-20090802.R2; Ferguson
Township, Clearfield County, Pa.; Consu
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806 and 808.
Dated: September 12, 2019.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2019-20081 Filed 9-16-19; 8:45 am]
BILLING CODE 7040-01-P