Aclara Meters, LLC;, 48922-48923 [2019-20061]

Download as PDF 48922 Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 45 (2019), and Order No. 664. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 1, 2019. Dated: September 10, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20066 Filed 9–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSK3GLQ082PROD with NOTICES [Project No. 3820–012] Aclara Meters, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed VerDate Sep<11>2014 17:05 Sep 16, 2019 Jkt 247001 with the Commission and is available for public inspection: a. Application Type: Application to Surrender License. b. Project No: 3820–012. c. Date Filed: March 29, 2019. d. Applicant: Aclara Meters, LLC. e. Name of Project: Somersworth Hydroelectric Project. f. Location: The project is located on the Salmon Falls River in Stafford County, New Hampshire, and York County, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Robert Enyard, Vice President, Aclara Meters, LLC, 77 Westport Plaza, Suite 500, St. Louis, MO 63146, (314) 895–6436, renyard@ aclara.com. i. FERC Contact: Diana Shannon, (202) 502–6136, diana.shannon@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: October 11, 2019. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–3820–012. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant proposes to surrender the project. No significant modifications to the existing dams, buildings, or structures and no ground disturbing PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 activities are proposed. The applicant proposes to fill the forebay and penstock with sand, remove all electrical equipment (cabinets) from the powerhouse, and close all the gates to the gatehouse except for the 2-foot by 2foot fill gate to provide Aclara Meters’ processing water (approximately 0.04– 0.05 cubic feet per second) into the canal. All other flow would continue to be spilled over the spillway or through the bypass gate in the canal. The project has been inoperable since 2011 due to a penstock failure. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone E:\FR\FM\17SEN1.SGM 17SEN1 Federal Register / Vol. 84, No. 180 / Tuesday, September 17, 2019 / Notices number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: September 11, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20061 Filed 9–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL19–96–000] jbell on DSK3GLQ082PROD with NOTICES Cimarron Windpower II, LLC v. Southwest Power Pool, Inc.; Notice of Complaint Take notice that on September 10, 2019, pursuant to sections 206, 306, and 309 of the Federal Power Act (FPA), 16 U.S.C. 824e, 825e, and 825h (2018) and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 (2019), Cimarron Windpower II, LLC (Complainant), filed a formal complaint against Southwest Power Pool, Inc. (SPP or Respondent) alleging that SPP violated its tariff and contractual obligations by failing to properly implement Attachment Z2 of its tariff, all as more fully explained in the complaint. Complainant certifies that the complaint was served on the Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. VerDate Sep<11>2014 17:05 Sep 16, 2019 Jkt 247001 The Commission encourages electronic submission of protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on October 10, 2019. Dated: September 11, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–20059 Filed 9–16–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–180–000. Applicants: E.ON Climate & Renewables North America. Description: Self-Certification of Exempt Wholesale Generator Status of Peyton Creek Wind Farm, LLC. Filed Date: 9/10/19. Accession Number: 20190910–5080. Comments Due: 5 p.m. ET 10/1/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2417–003; ER13–122–003. Applicants: ExxonMobil Baton Rouge Complex, ExxonMobil Beaumont Complex. Description: Supplement to June 25, 2018 Triennial Market-Power Analysis for the Central Region of ExxonMobil Baton Rouge Complex, et al. Filed Date: 3/28/19. Accession Number: 20190328–5284. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: ER19–2774–000. Applicants: Public Service Company of Colorado. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 48923 Description: § 205(d) Rate Filing: 2019–09–09 Revised LGIP to be effective 12/5/2019. Filed Date: 9/9/19. Accession Number: 20190909–5139. Comments Due: 5 p.m. ET 9/30/19. Docket Numbers: ER19–2775–000. Applicants: Northern Indiana Public Service Company, Rosewater Wind Farm LLC. Description: Request for Authorization to Undertake Affiliate Sales of Northern Indiana Public Service Company LLC, et al. Filed Date: 9/9/19. Accession Number: 20190909–5152. Comments Due: 5 p.m. ET 9/30/19. Docket Numbers: ER19–2776–000. Applicants: Lincoln Clean Energy, LLC. Description: Petition for Limited Waiver of Lincoln Clean Energy, LLC. Filed Date: 9/9/19. Accession Number: 20190909–5154. Comments Due: 5 p.m. ET 9/23/19. Docket Numbers: ER19–2777–000. Applicants: Portland General Electric Company. Description: Portland General Electric Company submits Average System Cost Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2020–2021. Filed Date: 9/10/19. Accession Number: 20190910–5078. Comments Due: 5 p.m. ET 10/1/19. Docket Numbers: ER19–2778–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 13–00018 Amended NITSA to be effective 9/10/ 2019. Filed Date: 9/10/19. Accession Number: 20190910–5105. Comments Due: 5 p.m. ET 10/1/19. Docket Numbers: ER19–2779–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 13–00019 Amended NITSA to be effective 11/10/ 2019. Filed Date: 9/10/19. Accession Number: 20190910–5108. Comments Due: 5 p.m. ET 10/1/19. Docket Numbers: ER19–2780–000. Applicants: Nevada Power Company. Description: § 205(d) Rate Filing: Service Agreement No. 13–00020 Amended NITSA to be effective 11/10/ 2019. Filed Date: 9/10/19. Accession Number: 20190910–5111. Comments Due: 5 p.m. ET 10/1/19 filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. E:\FR\FM\17SEN1.SGM 17SEN1

Agencies

[Federal Register Volume 84, Number 180 (Tuesday, September 17, 2019)]
[Notices]
[Pages 48922-48923]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-20061]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3820-012]


Aclara Meters, LLC;

Notice of Application Accepted for Filing and Soliciting Comments, 
Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application to Surrender License.
    b. Project No: 3820-012.
    c. Date Filed: March 29, 2019.
    d. Applicant: Aclara Meters, LLC.
    e. Name of Project: Somersworth Hydroelectric Project.
    f. Location: The project is located on the Salmon Falls River in 
Stafford County, New Hampshire, and York County, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Robert Enyard, Vice President, Aclara Meters, 
LLC, 77 Westport Plaza, Suite 500, St. Louis, MO 63146, (314) 895-6436, 
[email protected].
    i. FERC Contact: Diana Shannon, (202) 502-6136, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: October 11, 2019.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-3820-012. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The applicant proposes to surrender the 
project. No significant modifications to the existing dams, buildings, 
or structures and no ground disturbing activities are proposed. The 
applicant proposes to fill the forebay and penstock with sand, remove 
all electrical equipment (cabinets) from the powerhouse, and close all 
the gates to the gatehouse except for the 2-foot by 2-foot fill gate to 
provide Aclara Meters' processing water (approximately 0.04-0.05 cubic 
feet per second) into the canal. All other flow would continue to be 
spilled over the spillway or through the bypass gate in the canal. The 
project has been inoperable since 2011 due to a penstock failure.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 
20426, or by calling (202) 502-8371. This filing may also be viewed on 
the Commission's website at https://www.ferc.gov using the eLibrary 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title COMMENTS, PROTEST, or MOTION TO INTERVENE as 
applicable; (2) set forth in the heading the name of the applicant and 
the project number of the application to which the filing responds; (3) 
furnish the name, address, and telephone

[[Page 48923]]

number of the person commenting, protesting or intervening; and (4) 
otherwise comply with the requirements of 18 CFR 385.2001 through 
385.2005. All comments, motions to intervene, or protests must set 
forth their evidentiary basis. Any filing made by an intervenor must be 
accompanied by proof of service on all persons listed in the service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 385.2010.

    Dated: September 11, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-20061 Filed 9-16-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.