Lock+TM, 48607-48608 [2019-19972]
Download as PDF
Federal Register / Vol. 84, No. 179 / Monday, September 16, 2019 / Notices
access the document. For assistance,
contact FERC Online Support.
Dated: September 10, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–19970 Filed 9–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12611–009]
jspears on DSK3GMQ082PROD with NOTICES
Verdant Power, LLC; Notice of Request
To Waive Requirement To File Draft
License Application
a. Type of Filing: Request to Waive
Pre-Filing Requirements.
b. Project No.: 12611–009.
c. Date Filed: August 30, 2019.
d. Applicant: Verdant Power, LLC.
e. Name of Project: Roosevelt Island
Tidal Energy Project.
f. Location: On the East River in New
York County, New York.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Ronald F.
Smith, President and Chief Operating
Officer, Verdant Power, LLC, P.O. Box
282, Roosevelt Island, New York, New
York 10044. Phone: (703) 328–6841.
i. FERC Contact: Andy Bernick, (202)
502–8660, andrew.bernick@ferc.gov.
j. Verdant requests a waiver of the
Commission’s pre-filing regulations
under section 16.8(c) with respect to the
requirement to submit a draft license
application for the Roosevelt Island
Tidal Energy Project. Verdant states that
the project has a long history of
consultation and that it proposes no
substantive changes to the currently
licensed pilot project. Further, Verdant
indicates that it held two joint agency
meetings (on January 8, 2019 and May
16, 2019), the second of which was held
for federal agencies that were unable to
attend the January meeting due to the
funding lapse at certain federal agencies
between December 22, 2018, and
January 25, 2019. Verdant explains that
the second joint agency meeting and the
additional time needed to respond to
study requests has reduced the amount
of time available for submitting and
effectively reviewing responses to a
draft license application, prior to the
filing of the final license application by
December 31, 2019. Therefore,
Commission staff is soliciting comments
on Verdant’s request to waive the
requirement to file a draft license
application for the Roosevelt Island
Tidal Energy Project, pursuant to
VerDate Sep<11>2014
18:14 Sep 13, 2019
Jkt 247001
sections 16.8(c)(4) and 16.8(c)(6) of the
Commission’s regulations.
k. The deadline for filing comments is
15 days from the issuance date of this
notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments, and
final terms and conditions,
recommendations, and prescriptions
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–12611–009.
l. A copy of the request is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
three digits in the docket number field
to access the document. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: September 10, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–19968 Filed 9–13–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
48607
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14979–000]
Lock+TM Hydro Friends Fund XXVII,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 6, 2019, Lock+TM Hydro
Friends Fund XXVII, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Cowanesque Dam
Hydropower Project to be located at the
U.S. Army Corps of Engineers’
Cowanesque Dam on the Cowanesque
River in Tioga County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A new 30-foot-long,
30-foot-wide, 160-foot-high Large Frame
Module; (2) two turbine-generator units
with a total rated capacity of 0.85
megawatt; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting
the new transformer to an existing
distribution line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 3,700
megawatt-hours.
Applicant Contact: Wayne Krouse,
Lock+TM Hydro Friends Fund XXVII,
LLC, P.O. Box 43796, Birmingham, AL
35243; phone: 877–556–6566 ext. 709.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
E:\FR\FM\16SEN1.SGM
16SEN1
48608
Federal Register / Vol. 84, No. 179 / Monday, September 16, 2019 / Notices
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14979–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14979) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 10, 2019.
Kimberly D. Bose,
Secretary.
assessment, per FWS’ request; (3) the
FWS’ request for additional information,
filed July 17, 2019; (4) Moriah Hydro’s
proposal to install a water control
feature to regulate water levels within
New Bed Mine; and (5) additional issues
relating to ESA consultation.
e. A summary of the meeting will be
prepared and filed in the Commission’s
public file for the project.
f. All local, state, and federal agencies,
Indian tribes, and other interested
parties are invited to participate inperson or by telephone. However, as inperson seating is limited, priority will
be given to parties directly involved in
the ESA consultation process. Please
contact Andy Bernick at
andrew.bernick@ferc.gov, or (202) 502–
8660 by September 23, 2019, to RSVP
and to receive specific instructions on
how to participate.
[FR Doc. 2019–19972 Filed 9–13–19; 8:45 am]
Dated: September 9, 2019.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2019–19955 Filed 9–13–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 12635–002]
[Docket No. CP19–506–000]
jspears on DSK3GMQ082PROD with NOTICES
Moriah Hydro Corporation; Notice of
Technical Meeting
a. Date and Time of Meeting:
Thursday, October 3, 2019 at 11:00 a.m.
Eastern Daylight Time.
b. Place: New York State Department
of Environmental Conservation, 625
Broadway, Albany, New York 12233–
0001, and via telephone conference.
c. FERC Contact: Andy Bernick at
andrew.bernick@ferc.gov, or (202) 502–
8660.
d. Purpose of Meeting: Commission
staff is participating in a technical
meeting with the U.S. Fish and Wildlife
Service (FWS), New York State
Department of Environmental
Conservation, and Moriah Hydro
Corporation (Moriah Hydro) to discuss
Endangered Species Act (ESA)
consultation as it relates to licensing the
proposed Mineville Energy Storage
Project, to be constructed in the Town
of Moriah, Essex County, New York.
The proposed agenda will include
discussions of: (1) The Commission’s
hydro-licensing process and June 18,
2019, request to initiate formal
consultation regarding the endangered
Indiana bat and threatened northern
long-eared bat; (2) the Commission’s
draft environmental impact statement as
the basis for the project’s biological
VerDate Sep<11>2014
18:14 Sep 13, 2019
Jkt 247001
Tennessee Gas Pipeline Company,
LLC; Notice of Request Under Blanket
Authorization
Take notice that on August 30, 2019,
Tennessee Gas Pipeline Company, LLC
(Tennessee), 1001 Louisiana Street,
Houston, Texas 77002, filed in the
above referenced docket a prior notice
request pursuant to sections 157.203,
157.205, and 157.216(b) of the
Commission’s regulations under the
Natural Gas Act and its blanket
certificate issued in Docket No. CP82–
413–000 for authorization to abandon an
inactive injection/withdrawal well,
designated as Well 5564, in the Hebron
Storage Field (Field) located in Potter
County, Pennsylvania. Specifically,
Tennessee proposes to plug and
abandon the well, abandon in place
approximately 1,167 feet of six-inch
related lateral pipeline, abandon by
removal other related appurtenant
facilities including the well head, and
restore the well site. Tennessee states
that the proposed abandonment of Well
5564 will not affect the capacity of the
Field or the deliverability into or from
the Field. Further, Tennessee states that
the project will not abandon or decrease
service to its customers. Tennessee
estimates the cost of the project to be
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
$550,000, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Ben J.
Carranza, Director, Regulatory,
Tennessee Gas Pipeline Company, LLC,
1001 Louisiana Street, Houston, Texas
77002, by telephone at (713) 420–5535,
or by email at ben_carranza@
kindermorgan.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
E:\FR\FM\16SEN1.SGM
16SEN1
Agencies
[Federal Register Volume 84, Number 179 (Monday, September 16, 2019)]
[Notices]
[Pages 48607-48608]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19972]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14979-000]
Lock\+TM\ Hydro Friends Fund XXVII, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On March 6, 2019, Lock\+TM\ Hydro Friends Fund XXVII, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Cowanesque
Dam Hydropower Project to be located at the U.S. Army Corps of
Engineers' Cowanesque Dam on the Cowanesque River in Tioga County,
Pennsylvania. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A new 30-
foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two
turbine-generator units with a total rated capacity of 0.85 megawatt;
(3) a new 4-foot-long, 4-foot-wide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13-kilovolt transmission line
connecting the new transformer to an existing distribution line; and
(5) appurtenant facilities. The proposed project would have an annual
generation of 3,700 megawatt-hours.
Applicant Contact: Wayne Krouse, Lock\+TM\ Hydro Friends Fund
XXVII, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877-556-6566
ext. 709.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/
[[Page 48608]]
ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. The first page of any filing should
include docket number P-14979-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14979) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 10, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-19972 Filed 9-13-19; 8:45 am]
BILLING CODE 6717-01-P