Dyberry Creek Farm, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 47274-47275 [2019-19429]

Download as PDF 47274 Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2729–000] jbell on DSK3GLQ082PROD with NOTICES Lily Solar Lessee, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Lily Solar Lessee, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 23, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email VerDate Sep<11>2014 20:43 Sep 06, 2019 Jkt 247001 Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19436 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2718–000] 527 Energy; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of 527 Energy LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 23, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19433 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI19–2–000] Dyberry Creek Farm, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI19–2–000. c. Date Filed: July 31, 2019. d. Applicant: Dyberry Creek Farm. e. Name of Project: Dyberry Creek Farm Micro Hydro Project. f. Location: The proposed Dyberry Creek Farm Micro Hydro Project would be located on an unnamed tributary of the West Branch of Dyberry Creek, near the borough of Honesdale, in Wayne County, Pennsylvania. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b) (2012). h. Applicant Contact: Brian Paul Phillips, Dyberry Creek Farm, 86 Kilroe Road, Honesdale, PA, 18431; telephone: (646) 283–0570; email: bpaulphillips@ gmail.com; Agent Contact: James F. Sanders, 417 Upper Woods Road, Honesdale, PA 18431, telephone: (570) 253–4032; email: jimandpatsanders@ gmail.com. i. FERC Contact: Any questions on this notice should be addressed to Andrea Claros, (202) 502–8171, or email: andrea.claros@ferc.gov. j. Deadline for filing comments, protests, and motions to intervene is: 30 days from the issuance date of this notice by the Commission. E:\FR\FM\09SEN1.SGM 09SEN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices The Commission strongly encourages electronic filing. Please file comments, any comments, protests, and motions to intervene using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number DI19–2–000. k. Description of Project: The proposed run-of-river project would consist of: (1) An intake on an unnamed tributary of the West Branch of Dyberry Creek with a design head of 140 feet and a hydraulic capacity of 0.701 cubic feet per second; (2) a 700-foot-long penstock; (3) a 4-foot by 4-foot powerhouse containing a 3-kilowatt generating unit; (4) a 4-inch by 10-foot-long diameter outflow pipe returning water to the creek; (5) a breaker panel at the Dyberry Farm with a grid-tie into PPL Electric Utilities transmission line; and (6) appurtenant facilities. No dams or divisions would be built. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the project would affect the interests of interstate or foreign commerce. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) would be located on a nonnavigable stream over which Congress has Commerce Clause jurisdiction and would be constructed or enlarged after 1935. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call (866) 208–3676 or VerDate Sep<11>2014 20:43 Sep 06, 2019 Jkt 247001 email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above and in the Commission’s Public Reference Room located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502–8371. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS TO INTERVENE, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19429 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 47275 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14978–000] Lock+TM Hydro Friends Fund XXVI, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 6, 2019, Lock+TM Hydro Friends Fund XXVI, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Prompton Dam Hydropower Project to be located at the U.S. Army Corps of Engineers’ (Corps) Prompton Dam on the Lackawaxen River in Wayne County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 30-foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two turbine-generator units with a total rated capacity of 1.0 megawatt; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting the new transformer to an existing distribution line; and (5) appurtenant facilities. The proposed project would have an annual generation of 4,500 megawatt-hours. Applicant Contact: Wayne Krouse, Lock+TM Hydro Friends Fund XXVI, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877–556–6566 ext. 709. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ E:\FR\FM\09SEN1.SGM 09SEN1

Agencies

[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Pages 47274-47275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19429]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI19-2-000]


Dyberry Creek Farm, LLC; Notice of Declaration of Intention and 
Soliciting Comments, Protests, and Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.
    b. Docket No: DI19-2-000.
    c. Date Filed: July 31, 2019.
    d. Applicant: Dyberry Creek Farm.
    e. Name of Project: Dyberry Creek Farm Micro Hydro Project.
    f. Location: The proposed Dyberry Creek Farm Micro Hydro Project 
would be located on an unnamed tributary of the West Branch of Dyberry 
Creek, near the borough of Honesdale, in Wayne County, Pennsylvania.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b) (2012).
    h. Applicant Contact: Brian Paul Phillips, Dyberry Creek Farm, 86 
Kilroe Road, Honesdale, PA, 18431; telephone: (646) 283-0570; email: 
[email protected]; Agent Contact: James F. Sanders, 417 Upper 
Woods Road, Honesdale, PA 18431, telephone: (570) 253-4032; email: 
[email protected].
    i. FERC Contact: Any questions on this notice should be addressed 
to Andrea Claros, (202) 502-8171, or email: [email protected].
    j. Deadline for filing comments, protests, and motions to intervene 
is: 30 days from the issuance date of this notice by the Commission.

[[Page 47275]]

    The Commission strongly encourages electronic filing. Please file 
comments, any comments, protests, and motions to intervene using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number DI19-2-000.
    k. Description of Project: The proposed run-of-river project would 
consist of: (1) An intake on an unnamed tributary of the West Branch of 
Dyberry Creek with a design head of 140 feet and a hydraulic capacity 
of 0.701 cubic feet per second; (2) a 700-foot-long penstock; (3) a 4-
foot by 4-foot powerhouse containing a 3-kilowatt generating unit; (4) 
a 4-inch by 10-foot-long diameter outflow pipe returning water to the 
creek; (5) a breaker panel at the Dyberry Farm with a grid-tie into PPL 
Electric Utilities transmission line; and (6) appurtenant facilities. 
No dams or divisions would be built.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the project would affect the interests of 
interstate or foreign commerce. The Commission also determines whether 
or not the project: (1) Would be located on a navigable waterway; (2) 
would occupy public lands or reservations of the United States; (3) 
would utilize surplus water or water power from a government dam; or 
(4) would be located on a non-navigable stream over which Congress has 
Commerce Clause jurisdiction and would be constructed or enlarged after 
1935.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. You may also register online at 
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via 
email of new filings and issuances related to this or other pending 
projects. For assistance, call (866) 208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above and in the Commission's Public Reference Room located at 888 
First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
and .214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: All filings must 
bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS 
TO INTERVENE, as applicable, and the Docket Number of the particular 
application to which the filing refers. A copy of any Motion to 
Intervene must also be served upon each representative of the Applicant 
specified in the particular application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

    Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19429 Filed 9-6-19; 8:45 am]
 BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.