Dyberry Creek Farm, LLC; Notice of Declaration of Intention and Soliciting Comments, Protests, and Motions To Intervene, 47274-47275 [2019-19429]
Download as PDF
47274
Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2729–000]
jbell on DSK3GLQ082PROD with NOTICES
Lily Solar Lessee, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Lily
Solar Lessee, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
23, 2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
VerDate Sep<11>2014
20:43 Sep 06, 2019
Jkt 247001
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19436 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2718–000]
527 Energy; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of 527
Energy LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
23, 2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19433 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI19–2–000]
Dyberry Creek Farm, LLC; Notice of
Declaration of Intention and Soliciting
Comments, Protests, and Motions To
Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI19–2–000.
c. Date Filed: July 31, 2019.
d. Applicant: Dyberry Creek Farm.
e. Name of Project: Dyberry Creek
Farm Micro Hydro Project.
f. Location: The proposed Dyberry
Creek Farm Micro Hydro Project would
be located on an unnamed tributary of
the West Branch of Dyberry Creek, near
the borough of Honesdale, in Wayne
County, Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b) (2012).
h. Applicant Contact: Brian Paul
Phillips, Dyberry Creek Farm, 86 Kilroe
Road, Honesdale, PA, 18431; telephone:
(646) 283–0570; email: bpaulphillips@
gmail.com; Agent Contact: James F.
Sanders, 417 Upper Woods Road,
Honesdale, PA 18431, telephone: (570)
253–4032; email: jimandpatsanders@
gmail.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Andrea Claros, (202) 502–8171, or
email: andrea.claros@ferc.gov.
j. Deadline for filing comments,
protests, and motions to intervene is: 30
days from the issuance date of this
notice by the Commission.
E:\FR\FM\09SEN1.SGM
09SEN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices
The Commission strongly encourages
electronic filing. Please file comments,
any comments, protests, and motions to
intervene using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number DI19–2–000.
k. Description of Project: The
proposed run-of-river project would
consist of: (1) An intake on an unnamed
tributary of the West Branch of Dyberry
Creek with a design head of 140 feet and
a hydraulic capacity of 0.701 cubic feet
per second; (2) a 700-foot-long penstock;
(3) a 4-foot by 4-foot powerhouse
containing a 3-kilowatt generating unit;
(4) a 4-inch by 10-foot-long diameter
outflow pipe returning water to the
creek; (5) a breaker panel at the Dyberry
Farm with a grid-tie into PPL Electric
Utilities transmission line; and (6)
appurtenant facilities. No dams or
divisions would be built.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the project would
affect the interests of interstate or
foreign commerce. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy public
lands or reservations of the United
States; (3) would utilize surplus water
or water power from a government dam;
or (4) would be located on a nonnavigable stream over which Congress
has Commerce Clause jurisdiction and
would be constructed or enlarged after
1935.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3676 or
VerDate Sep<11>2014
20:43 Sep 06, 2019
Jkt 247001
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above and in the Commission’s Public
Reference Room located at 888 First
Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502–8371.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, and
.214. In determining the appropriate
action to take, the Commission will
consider all protests or other comments
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must bear in all
capital letters the title COMMENTS,
PROTESTS, and MOTIONS TO
INTERVENE, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19429 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
47275
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14978–000]
Lock+TM Hydro Friends Fund XXVI,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 6, 2019, Lock+TM Hydro
Friends Fund XXVI, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Prompton Dam
Hydropower Project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Prompton Dam on the Lackawaxen
River in Wayne County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A new 30-foot-long,
30-foot-wide, 160-foot-high Large Frame
Module; (2) two turbine-generator units
with a total rated capacity of 1.0
megawatt; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting
the new transformer to an existing
distribution line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 4,500
megawatt-hours.
Applicant Contact: Wayne Krouse,
Lock+TM Hydro Friends Fund XXVI,
LLC, P.O. Box 43796, Birmingham, AL
35243; phone: 877–556–6566 ext. 709.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Pages 47274-47275]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19429]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI19-2-000]
Dyberry Creek Farm, LLC; Notice of Declaration of Intention and
Soliciting Comments, Protests, and Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI19-2-000.
c. Date Filed: July 31, 2019.
d. Applicant: Dyberry Creek Farm.
e. Name of Project: Dyberry Creek Farm Micro Hydro Project.
f. Location: The proposed Dyberry Creek Farm Micro Hydro Project
would be located on an unnamed tributary of the West Branch of Dyberry
Creek, near the borough of Honesdale, in Wayne County, Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b) (2012).
h. Applicant Contact: Brian Paul Phillips, Dyberry Creek Farm, 86
Kilroe Road, Honesdale, PA, 18431; telephone: (646) 283-0570; email:
[email protected]; Agent Contact: James F. Sanders, 417 Upper
Woods Road, Honesdale, PA 18431, telephone: (570) 253-4032; email:
[email protected].
i. FERC Contact: Any questions on this notice should be addressed
to Andrea Claros, (202) 502-8171, or email: [email protected].
j. Deadline for filing comments, protests, and motions to intervene
is: 30 days from the issuance date of this notice by the Commission.
[[Page 47275]]
The Commission strongly encourages electronic filing. Please file
comments, any comments, protests, and motions to intervene using the
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number DI19-2-000.
k. Description of Project: The proposed run-of-river project would
consist of: (1) An intake on an unnamed tributary of the West Branch of
Dyberry Creek with a design head of 140 feet and a hydraulic capacity
of 0.701 cubic feet per second; (2) a 700-foot-long penstock; (3) a 4-
foot by 4-foot powerhouse containing a 3-kilowatt generating unit; (4)
a 4-inch by 10-foot-long diameter outflow pipe returning water to the
creek; (5) a breaker panel at the Dyberry Farm with a grid-tie into PPL
Electric Utilities transmission line; and (6) appurtenant facilities.
No dams or divisions would be built.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the project would affect the interests of
interstate or foreign commerce. The Commission also determines whether
or not the project: (1) Would be located on a navigable waterway; (2)
would occupy public lands or reservations of the United States; (3)
would utilize surplus water or water power from a government dam; or
(4) would be located on a non-navigable stream over which Congress has
Commerce Clause jurisdiction and would be constructed or enlarged after
1935.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the last three digits in the docket
number field to access the document. You may also register online at
https://www.ferc.gov/docs-filing/esubscription.asp to be notified via
email of new filings and issuances related to this or other pending
projects. For assistance, call (866) 208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above and in the Commission's Public Reference Room located at 888
First Street NE, Room 2A, Washington, DC 20426, or by calling (202)
502-8371.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
and .214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must
bear in all capital letters the title COMMENTS, PROTESTS, and MOTIONS
TO INTERVENE, as applicable, and the Docket Number of the particular
application to which the filing refers. A copy of any Motion to
Intervene must also be served upon each representative of the Applicant
specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19429 Filed 9-6-19; 8:45 am]
BILLING CODE 6717-01-P