Combined Notice of Filings #1, 47281-47282 [2019-19425]
Download as PDF
Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices
jbell on DSK3GLQ082PROD with NOTICES
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
[FR Doc. 2019–19434 Filed 9–6–19; 8:45 am]
Commission’s eFiling system at https://
BILLING CODE 6717–01–P
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
DEPARTMENT OF ENERGY
registration, using the eComment system
Federal Energy Regulatory
at https://www.ferc.gov/docs-filing/
Commission
ecomment.asp. You must include your
name and contact information at the end
[Project No. 14975–000]
of your comments. For assistance,
please contact FERC Online Support at
Lock+TM Hydro Friends Fund XXII, LLC; FERCOnlineSupport@ferc.gov, (866)
Notice of Preliminary Permit
208–3676 (toll free), or (202) 502–8659
Application Accepted for Filing and
(TTY). In lieu of electronic filing, please
Soliciting Comments, Motions To
send a paper copy to: Secretary, Federal
Intervene, and Competing Applications Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
On March 1, 2019, Lock+TM Hydro
The first page of any filing should
Friends Fund XXII, LLC, filed an
include docket number P–14975–000.
application for a preliminary permit,
More information about this project,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the including a copy of the application, can
be viewed or printed on the eLibrary
feasibility of the Little Pine Creek Dam
link of the Commission’s website at
Hydropower Project to be located at the
https://www.ferc.gov/docs-filing/
Pennsylvania Department of
elibrary.asp. Enter the docket number
Conservation and Natural Resources’
(P–14975) in the docket number field to
Little Pine Creek Dam on Little Pine
access the document. For assistance,
Creek in Lycoming County,
contact FERC Online Support.
Pennsylvania. The sole purpose of a
preliminary permit, if issued, is to grant
Dated: August 29, 2019.
the permit holder priority to file a
Nathaniel J. Davis, Sr.,
license application during the permit
Deputy Secretary.
term. A preliminary permit does not
[FR Doc. 2019–19340 Filed 9–6–19; 8:45 am]
authorize the permit holder to perform
BILLING CODE 6717–01–P
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
DEPARTMENT OF ENERGY
express permission.
The proposed project would consist of Federal Energy Regulatory
the following: (1) A new 30-foot-long,
Commission
30-foot-wide, 160-foot-high Large Frame
[Docket No. ER19–2717–000]
Module; (2) two turbine-generator units
with a total rated capacity of 1.3
Madison ESS, LLC; Supplemental
megawatts; (3) a new 4-foot-long, 4-foot- Notice That Initial Market-Based Rate
wide, 3-foot-high pad-mounted
Filing Includes Request for Blanket
transformer; (4) a new 200-foot-long, 13- Section 204 Authorization
kilovolt transmission line connecting
the new transformer to an existing
This is a supplemental notice in the
distribution line; and (5) appurtenant
above-referenced proceeding of Madison
facilities. The proposed project would
ESS, LLC’s application for market-based
have an annual generation of 5,800
rate authority, with an accompanying
megawatt-hours.
rate tariff, noting that such application
Applicant Contact: Wayne Krouse,
includes a request for blanket
Lock+TM Hydro Friends Fund XXII,
authorization, under 18 CFR part 34, of
future issuances of securities and
LLC, P.O. Box 43796, Birmingham, AL
assumptions of liability.
35243; phone: 877–556–6566 ext. 709.
Any person desiring to intervene or to
FERC Contact: Woohee Choi; phone:
protest should file with the Federal
(202) 502–6336.
Deadline for filing comments, motions Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
to intervene, competing applications
(without notices of intent), or notices of in accordance with Rules 211 and 214
intent to file competing applications: 60 of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
days from the issuance of this notice.
385.214). Anyone filing a motion to
Competing applications and notices of
intent must meet the requirements of 18 intervene or protest must serve a copy
of that document on the Applicant.
CFR 4.36.
VerDate Sep<11>2014
20:43 Sep 06, 2019
Jkt 247001
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
47281
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September
23, 2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19432 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–101–000.
Applicants: Dominion Energy South
Carolina, Inc.
Description: Supplement to June 13,
2019 Application for Authorization
Under Section 203 of the Federal Power
Act of Dominion Energy South Carolina,
Inc. under EC19–101.
Filed Date: 8/29/19.
Accession Number: 20190829–5211.
E:\FR\FM\09SEN1.SGM
09SEN1
jbell on DSK3GLQ082PROD with NOTICES
47282
Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices
Comments Due: 5 p.m. ET 9/19/19.
Docket Numbers: EC19–132–000.
Applicants: Virginia Electric and
Power Company, Allegheny Generating
Company.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Virginia
Electric and Power Company, et al.
Filed Date: 8/30/19.
Accession Number: 20190830–5302.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EC19–133–000.
Applicants: SR Hazlehurst III, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of SR
Hazlehurst III, LLC.
Filed Date: 8/30/19.
Accession Number: 20190830–5312.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EC19–134–000.
Applicants: Wilkinson Solar LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Wilkinson
Solar, LLC.
Filed Date: 8/30/19.
Accession Number: 20190830–5319.
Comments Due: 5 p.m. ET 9/20/19.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–177–000.
Applicants: Lily Solar LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Lily Solar LLC.
Filed Date: 8/30/19.
Accession Number: 20190830–5287.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EG19–178–000.
Applicants: Lily Solar Lessee, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Lily Solar Lessee,
LLC.
Filed Date: 8/30/19.
Accession Number: 20190830–5288.
Comments Due: 5 p.m. ET 9/20/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2175–002;
ER12–224–003; ER17–767–002; ER17–
765–002; ER11–3188–002; ER12–225–
003; ER12–2301–002; ER11–2176–001;
ER17–764–002.
Applicants: SGE Energy Sourcing,
LLC, Stream Energy Columbia, LLC,
Stream Energy Delaware, LLC, Stream
Energy Illinois, LLC, Stream Energy
Maryland, LLC, Stream Energy New
Jersey, LLC, Stream Energy New York,
LLC, Stream Energy Pennsylvania, LLC,
Stream Ohio Gas & Electric, LLC.
Description: Notification of Change in
Status of the Stream MBR Sellers under
ER11–2175, et al.
VerDate Sep<11>2014
20:43 Sep 06, 2019
Jkt 247001
Filed Date: 9/3/19.
Accession Number: 20190903–5131.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2380–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–09–03_SA 3228 IPL–ITC Midwest
Substitute 1st Rev GIA (J495) to be
effective 6/26/2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5046.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2726–000.
Applicants: Invenergy Wilkinson
Solar Holdings LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization to be effective 10/1/2019.
Filed Date: 8/30/19.
Accession Number: 20190830–5268.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19–2726–001.
Applicants: Invenergy Wilkinson
Solar Holdings LLC.
Description: Tariff Amendment:
Supplement to Application for MarketBased Rate Authorization to be effective
10/1/2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5013.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2727–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–30 Commitment Costs and
Default Energy Bid Enhancements to be
effective 12/31/2019.
Filed Date: 8/30/19.
Accession Number: 20190830–5276.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19–2728–000.
Applicants: Lily Solar LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/30/2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5000.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2729–000.
Applicants: Lily Solar Lessee, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/30/2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5002.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2730–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3596
Tenaska Clear Creek Wind Facilities
Construction Agr to be effective 8/30/
2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5069.
PO 00000
Frm 00050
Fmt 4703
Sfmt 9990
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19–2731–000.
Applicants: Avista Corporation.
Description: Avista Corporation
submits Average System Cost Filing for
Sales of Electric Power to the Bonneville
Power Administration, FY 2020–2021.
Filed Date: 8/30/19.
Accession Number: 20190830–5301.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19–2732–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5460; Queue
No. AE2–304 to be effective 8/5/2019.
Filed Date: 9/3/19.
Accession Number: 20190903–5085.
Comments Due: 5 p.m. ET 9/24/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–49–000.
Applicants: AEP Texas Inc.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of AEP
Texas Inc.
Filed Date: 9/3/19.
Accession Number: 20190903–5120.
Comments Due: 5 p.m. ET 9/24/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:
https://www.ferc.gov/docs-filing/
efiling/filing-req.pdf. For other
information, call (866) 208–3676 (toll
free). For TTY, call (202) 502–8659.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19425 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Pages 47281-47282]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19425]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-101-000.
Applicants: Dominion Energy South Carolina, Inc.
Description: Supplement to June 13, 2019 Application for
Authorization Under Section 203 of the Federal Power Act of Dominion
Energy South Carolina, Inc. under EC19-101.
Filed Date: 8/29/19.
Accession Number: 20190829-5211.
[[Page 47282]]
Comments Due: 5 p.m. ET 9/19/19.
Docket Numbers: EC19-132-000.
Applicants: Virginia Electric and Power Company, Allegheny
Generating Company.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Virginia Electric and Power
Company, et al.
Filed Date: 8/30/19.
Accession Number: 20190830-5302.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EC19-133-000.
Applicants: SR Hazlehurst III, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of SR Hazlehurst III, LLC.
Filed Date: 8/30/19.
Accession Number: 20190830-5312.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EC19-134-000.
Applicants: Wilkinson Solar LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Wilkinson Solar, LLC.
Filed Date: 8/30/19.
Accession Number: 20190830-5319.
Comments Due: 5 p.m. ET 9/20/19.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-177-000.
Applicants: Lily Solar LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Lily Solar LLC.
Filed Date: 8/30/19.
Accession Number: 20190830-5287.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: EG19-178-000.
Applicants: Lily Solar Lessee, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Lily Solar Lessee, LLC.
Filed Date: 8/30/19.
Accession Number: 20190830-5288.
Comments Due: 5 p.m. ET 9/20/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-2175-002; ER12-224-003; ER17-767-002; ER17-
765-002; ER11-3188-002; ER12-225-003; ER12-2301-002; ER11-2176-001;
ER17-764-002.
Applicants: SGE Energy Sourcing, LLC, Stream Energy Columbia, LLC,
Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream Energy
Maryland, LLC, Stream Energy New Jersey, LLC, Stream Energy New York,
LLC, Stream Energy Pennsylvania, LLC, Stream Ohio Gas & Electric, LLC.
Description: Notification of Change in Status of the Stream MBR
Sellers under ER11-2175, et al.
Filed Date: 9/3/19.
Accession Number: 20190903-5131.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2380-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-09-03_SA 3228 IPL-ITC Midwest
Substitute 1st Rev GIA (J495) to be effective 6/26/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5046.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2726-000.
Applicants: Invenergy Wilkinson Solar Holdings LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization to be effective 10/1/2019.
Filed Date: 8/30/19.
Accession Number: 20190830-5268.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19-2726-001.
Applicants: Invenergy Wilkinson Solar Holdings LLC.
Description: Tariff Amendment: Supplement to Application for
Market-Based Rate Authorization to be effective 10/1/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5013.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2727-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-30 Commitment Costs
and Default Energy Bid Enhancements to be effective 12/31/2019.
Filed Date: 8/30/19.
Accession Number: 20190830-5276.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19-2728-000.
Applicants: Lily Solar LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/30/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5000.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2729-000.
Applicants: Lily Solar Lessee, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/30/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5002.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2730-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3596 Tenaska Clear Creek
Wind Facilities Construction Agr to be effective 8/30/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5069.
Comments Due: 5 p.m. ET 9/24/19.
Docket Numbers: ER19-2731-000.
Applicants: Avista Corporation.
Description: Avista Corporation submits Average System Cost Filing
for Sales of Electric Power to the Bonneville Power Administration, FY
2020-2021.
Filed Date: 8/30/19.
Accession Number: 20190830-5301.
Comments Due: 5 p.m. ET 9/20/19.
Docket Numbers: ER19-2732-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 5460;
Queue No. AE2-304 to be effective 8/5/2019.
Filed Date: 9/3/19.
Accession Number: 20190903-5085.
Comments Due: 5 p.m. ET 9/24/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-49-000.
Applicants: AEP Texas Inc.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of AEP Texas Inc.
Filed Date: 9/3/19.
Accession Number: 20190903-5120.
Comments Due: 5 p.m. ET 9/24/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19425 Filed 9-6-19; 8:45 am]
BILLING CODE 6717-01-P