Download as PDF Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices jbell on DSK3GLQ082PROD with NOTICES Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the [FR Doc. 2019–19434 Filed 9–6–19; 8:45 am] Commission’s eFiling system at https:// BILLING CODE 6717–01–P www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior DEPARTMENT OF ENERGY registration, using the eComment system Federal Energy Regulatory at https://www.ferc.gov/docs-filing/ Commission ecomment.asp. You must include your name and contact information at the end [Project No. 14975–000] of your comments. For assistance, please contact FERC Online Support at Lock+TM Hydro Friends Fund XXII, LLC; FERCOnlineSupport@ferc.gov, (866) Notice of Preliminary Permit 208–3676 (toll free), or (202) 502–8659 Application Accepted for Filing and (TTY). In lieu of electronic filing, please Soliciting Comments, Motions To send a paper copy to: Secretary, Federal Intervene, and Competing Applications Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. On March 1, 2019, Lock+TM Hydro The first page of any filing should Friends Fund XXII, LLC, filed an include docket number P–14975–000. application for a preliminary permit, More information about this project, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the including a copy of the application, can be viewed or printed on the eLibrary feasibility of the Little Pine Creek Dam link of the Commission’s website at Hydropower Project to be located at the https://www.ferc.gov/docs-filing/ Pennsylvania Department of elibrary.asp. Enter the docket number Conservation and Natural Resources’ (P–14975) in the docket number field to Little Pine Creek Dam on Little Pine access the document. For assistance, Creek in Lycoming County, contact FERC Online Support. Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant Dated: August 29, 2019. the permit holder priority to file a Nathaniel J. Davis, Sr., license application during the permit Deputy Secretary. term. A preliminary permit does not [FR Doc. 2019–19340 Filed 9–6–19; 8:45 am] authorize the permit holder to perform BILLING CODE 6717–01–P any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ DEPARTMENT OF ENERGY express permission. The proposed project would consist of Federal Energy Regulatory the following: (1) A new 30-foot-long, Commission 30-foot-wide, 160-foot-high Large Frame [Docket No. ER19–2717–000] Module; (2) two turbine-generator units with a total rated capacity of 1.3 Madison ESS, LLC; Supplemental megawatts; (3) a new 4-foot-long, 4-foot- Notice That Initial Market-Based Rate wide, 3-foot-high pad-mounted Filing Includes Request for Blanket transformer; (4) a new 200-foot-long, 13- Section 204 Authorization kilovolt transmission line connecting the new transformer to an existing This is a supplemental notice in the distribution line; and (5) appurtenant above-referenced proceeding of Madison facilities. The proposed project would ESS, LLC’s application for market-based have an annual generation of 5,800 rate authority, with an accompanying megawatt-hours. rate tariff, noting that such application Applicant Contact: Wayne Krouse, includes a request for blanket Lock+TM Hydro Friends Fund XXII, authorization, under 18 CFR part 34, of future issuances of securities and LLC, P.O. Box 43796, Birmingham, AL assumptions of liability. 35243; phone: 877–556–6566 ext. 709. Any person desiring to intervene or to FERC Contact: Woohee Choi; phone: protest should file with the Federal (202) 502–6336. Deadline for filing comments, motions Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, to intervene, competing applications (without notices of intent), or notices of in accordance with Rules 211 and 214 intent to file competing applications: 60 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and days from the issuance of this notice. 385.214). Anyone filing a motion to Competing applications and notices of intent must meet the requirements of 18 intervene or protest must serve a copy of that document on the Applicant. CFR 4.36. VerDate Sep<11>2014 20:43 Sep 06, 2019 Jkt 247001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 47281 Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 23, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19432 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–101–000. Applicants: Dominion Energy South Carolina, Inc. Description: Supplement to June 13, 2019 Application for Authorization Under Section 203 of the Federal Power Act of Dominion Energy South Carolina, Inc. under EC19–101. Filed Date: 8/29/19. Accession Number: 20190829–5211. E:\FR\FM\09SEN1.SGM 09SEN1 jbell on DSK3GLQ082PROD with NOTICES 47282 Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices Comments Due: 5 p.m. ET 9/19/19. Docket Numbers: EC19–132–000. Applicants: Virginia Electric and Power Company, Allegheny Generating Company. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Virginia Electric and Power Company, et al. Filed Date: 8/30/19. Accession Number: 20190830–5302. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: EC19–133–000. Applicants: SR Hazlehurst III, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of SR Hazlehurst III, LLC. Filed Date: 8/30/19. Accession Number: 20190830–5312. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: EC19–134–000. Applicants: Wilkinson Solar LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Wilkinson Solar, LLC. Filed Date: 8/30/19. Accession Number: 20190830–5319. Comments Due: 5 p.m. ET 9/20/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–177–000. Applicants: Lily Solar LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Lily Solar LLC. Filed Date: 8/30/19. Accession Number: 20190830–5287. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: EG19–178–000. Applicants: Lily Solar Lessee, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Lily Solar Lessee, LLC. Filed Date: 8/30/19. Accession Number: 20190830–5288. Comments Due: 5 p.m. ET 9/20/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER11–2175–002; ER12–224–003; ER17–767–002; ER17– 765–002; ER11–3188–002; ER12–225– 003; ER12–2301–002; ER11–2176–001; ER17–764–002. Applicants: SGE Energy Sourcing, LLC, Stream Energy Columbia, LLC, Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream Energy Maryland, LLC, Stream Energy New Jersey, LLC, Stream Energy New York, LLC, Stream Energy Pennsylvania, LLC, Stream Ohio Gas & Electric, LLC. Description: Notification of Change in Status of the Stream MBR Sellers under ER11–2175, et al. VerDate Sep<11>2014 20:43 Sep 06, 2019 Jkt 247001 Filed Date: 9/3/19. Accession Number: 20190903–5131. Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2380–001. Applicants: Midcontinent Independent System Operator, Inc. Description: Tariff Amendment: 2019–09–03_SA 3228 IPL–ITC Midwest Substitute 1st Rev GIA (J495) to be effective 6/26/2019. Filed Date: 9/3/19. Accession Number: 20190903–5046. Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2726–000. Applicants: Invenergy Wilkinson Solar Holdings LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authorization to be effective 10/1/2019. Filed Date: 8/30/19. Accession Number: 20190830–5268. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: ER19–2726–001. Applicants: Invenergy Wilkinson Solar Holdings LLC. Description: Tariff Amendment: Supplement to Application for MarketBased Rate Authorization to be effective 10/1/2019. Filed Date: 9/3/19. Accession Number: 20190903–5013. Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2727–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–08–30 Commitment Costs and Default Energy Bid Enhancements to be effective 12/31/2019. Filed Date: 8/30/19. Accession Number: 20190830–5276. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: ER19–2728–000. Applicants: Lily Solar LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/30/2019. Filed Date: 9/3/19. Accession Number: 20190903–5000. Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2729–000. Applicants: Lily Solar Lessee, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 10/30/2019. Filed Date: 9/3/19. Accession Number: 20190903–5002. Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2730–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3596 Tenaska Clear Creek Wind Facilities Construction Agr to be effective 8/30/ 2019. Filed Date: 9/3/19. Accession Number: 20190903–5069. PO 00000 Frm 00050 Fmt 4703 Sfmt 9990 Comments Due: 5 p.m. ET 9/24/19. Docket Numbers: ER19–2731–000. Applicants: Avista Corporation. Description: Avista Corporation submits Average System Cost Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2020–2021. Filed Date: 8/30/19. Accession Number: 20190830–5301. Comments Due: 5 p.m. ET 9/20/19. Docket Numbers: ER19–2732–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5460; Queue No. AE2–304 to be effective 8/5/2019. Filed Date: 9/3/19. Accession Number: 20190903–5085. Comments Due: 5 p.m. ET 9/24/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–49–000. Applicants: AEP Texas Inc. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of AEP Texas Inc. Filed Date: 9/3/19. Accession Number: 20190903–5120. Comments Due: 5 p.m. ET 9/24/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/ efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 3, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19425 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\09SEN1.SGM 09SEN1

Agencies

[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Pages 47281-47282]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19425]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-101-000.
    Applicants: Dominion Energy South Carolina, Inc.
    Description: Supplement to June 13, 2019 Application for 
Authorization Under Section 203 of the Federal Power Act of Dominion 
Energy South Carolina, Inc. under EC19-101.
    Filed Date: 8/29/19.
    Accession Number: 20190829-5211.

[[Page 47282]]

    Comments Due: 5 p.m. ET 9/19/19.

    Docket Numbers: EC19-132-000.
    Applicants: Virginia Electric and Power Company, Allegheny 
Generating Company.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Virginia Electric and Power 
Company, et al.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5302.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: EC19-133-000.
    Applicants: SR Hazlehurst III, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of SR Hazlehurst III, LLC.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5312.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: EC19-134-000.
    Applicants: Wilkinson Solar LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al. of Wilkinson Solar, LLC.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5319.
    Comments Due: 5 p.m. ET 9/20/19.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-177-000.
    Applicants: Lily Solar LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Lily Solar LLC.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5287.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: EG19-178-000.
    Applicants: Lily Solar Lessee, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Lily Solar Lessee, LLC.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5288.
    Comments Due: 5 p.m. ET 9/20/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER11-2175-002; ER12-224-003; ER17-767-002; ER17-
765-002; ER11-3188-002; ER12-225-003; ER12-2301-002; ER11-2176-001; 
ER17-764-002.
    Applicants: SGE Energy Sourcing, LLC, Stream Energy Columbia, LLC, 
Stream Energy Delaware, LLC, Stream Energy Illinois, LLC, Stream Energy 
Maryland, LLC, Stream Energy New Jersey, LLC, Stream Energy New York, 
LLC, Stream Energy Pennsylvania, LLC, Stream Ohio Gas & Electric, LLC.
    Description: Notification of Change in Status of the Stream MBR 
Sellers under ER11-2175, et al.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5131.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2380-001.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Tariff Amendment: 2019-09-03_SA 3228 IPL-ITC Midwest 
Substitute 1st Rev GIA (J495) to be effective 6/26/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5046.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2726-000.
    Applicants: Invenergy Wilkinson Solar Holdings LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authorization to be effective 10/1/2019.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5268.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: ER19-2726-001.
    Applicants: Invenergy Wilkinson Solar Holdings LLC.
    Description: Tariff Amendment: Supplement to Application for 
Market-Based Rate Authorization to be effective 10/1/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5013.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2727-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2019-08-30 Commitment Costs 
and Default Energy Bid Enhancements to be effective 12/31/2019.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5276.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: ER19-2728-000.
    Applicants: Lily Solar LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/30/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5000.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2729-000.
    Applicants: Lily Solar Lessee, LLC.
    Description: Baseline eTariff Filing: Market-Based Rate Application 
to be effective 10/30/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5002.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2730-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3596 Tenaska Clear Creek 
Wind Facilities Construction Agr to be effective 8/30/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5069.
    Comments Due: 5 p.m. ET 9/24/19.

    Docket Numbers: ER19-2731-000.
    Applicants: Avista Corporation.
    Description: Avista Corporation submits Average System Cost Filing 
for Sales of Electric Power to the Bonneville Power Administration, FY 
2020-2021.
    Filed Date: 8/30/19.
    Accession Number: 20190830-5301.
    Comments Due: 5 p.m. ET 9/20/19.

    Docket Numbers: ER19-2732-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA SA No. 5460; 
Queue No. AE2-304 to be effective 8/5/2019.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5085.
    Comments Due: 5 p.m. ET 9/24/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-49-000.
    Applicants: AEP Texas Inc.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of AEP Texas Inc.
    Filed Date: 9/3/19.
    Accession Number: 20190903-5120.
    Comments Due: 5 p.m. ET 9/24/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at:
    https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other 
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.

    Dated: September 3, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19425 Filed 9-6-19; 8:45 am]