Download as PDF 47284 Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. p. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate. Commission issues EA: November 2019. Dated: August 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19342 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14976–000] jbell on DSK3GLQ082PROD with NOTICES Lock+TM Hydro Friends Fund XXIII, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2019, Lock+TM Hydro Friends Fund XXIII, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the George B. Stevenson Dam Hydropower Project to be located at the Pennsylvania Department of Conservation and Natural Resources’ George B. Stevenson Dam on Sinnemahoning Creek in Cameron County, Pennsylvania. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 30-foot-long, VerDate Sep<11>2014 20:43 Sep 06, 2019 Jkt 247001 30-foot-wide, 160-foot-high Large Frame Module; (2) two turbine-generator units with a total rated capacity of 1.1 megawatts; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting the new transformer to an existing distribution line; and (5) appurtenant facilities. The proposed project would have an annual generation of 5,000 megawatt-hours. Applicant Contact: Wayne Krouse, Lock+TM Hydro Friends Fund XXIII, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877–556–6566 ext. 709. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14976–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14976) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 29, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–19343 Filed 9–6–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP19–502–000; PF17–8–000] Commonwealth LNG, LLC; Notice of Application Take notice that on August 20, 2019, Commonwealth LNG, LLC (Commonwealth), at One Riverway, Suite 500, Houston, Texas 77056, filed an application in the above reference docket an application pursuant to section 3 of the Natural Gas Act (NGA) to construct and operate a natural gas liquefaction and export facility and an associated NGA section 3 pipeline in Cameron Parish, Louisiana, referred as the Commonwealth LNG Project, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. Commission staff has determined that this project qualifies as a Major Infrastructure Project pursuant to the Memorandum of Understanding Implementing One Federal Decision under Executive Order 13807 signed on April 10, 2018. Major Infrastructure Projects are defined as projects for which multiple authorizations by Federal agencies will be required and the lead Federal agency has determined that it will prepare an Environmental Impact Statement under the National Environmental Policy Act.1 Any questions concerning this application may be directed to Robert Powers, Commonwealth LNG, LLC, One Riverway, Suite 500, Houston, Texas 77056, by telephone at (346) 352–4444 or by email at RPowers@teamcpl.com. On August 15, 2017, Commission staff granted the applicant’s request to utilize the Pre-Filing Process and assigned Docket No. PF17–8–000 to staff activities involving the project. Now, as of the filing of this application on August 20, 2019, the Pre-Filing Process for this project has ended. From this 1 42 U.S.C. (United States Code) 4321 et seq. For more information on One Federal Decision, visit our website at https://www.ferc.gov/industries/gas/ gen-info/one-federal.asp. E:\FR\FM\09SEN1.SGM 09SEN1

Agencies

[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Page 47284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19343]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14976-000]


Lock\+TM\ Hydro Friends Fund XXIII, LLC; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

    On March 1, 2019, Lock\+TM\ Hydro Friends Fund XXIII, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
George B. Stevenson Dam Hydropower Project to be located at the 
Pennsylvania Department of Conservation and Natural Resources' George 
B. Stevenson Dam on Sinnemahoning Creek in Cameron County, 
Pennsylvania. The sole purpose of a preliminary permit, if issued, is 
to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A new 30-
foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two 
turbine-generator units with a total rated capacity of 1.1 megawatts; 
(3) a new 4-foot-long, 4-foot-wide, 3-foot-high pad-mounted 
transformer; (4) a new 200-foot-long, 13-kilovolt transmission line 
connecting the new transformer to an existing distribution line; and 
(5) appurtenant facilities. The proposed project would have an annual 
generation of 5,000 megawatt-hours.
    Applicant Contact: Wayne Krouse, Lock\+TM\ Hydro Friends Fund 
XXIII, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877-556-6566 
ext. 709.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-14976-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14976) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: August 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19343 Filed 9-6-19; 8:45 am]
BILLING CODE 6717-01-P