Lock+TM, 47284 [2019-19343]
Download as PDF
47284
Federal Register / Vol. 84, No. 174 / Monday, September 9, 2019 / Notices
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
p. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Commission issues EA: November
2019.
Dated: August 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19342 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14976–000]
jbell on DSK3GLQ082PROD with NOTICES
Lock+TM Hydro Friends Fund XXIII,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2019, Lock+TM Hydro
Friends Fund XXIII, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the George B. Stevenson
Dam Hydropower Project to be located
at the Pennsylvania Department of
Conservation and Natural Resources’
George B. Stevenson Dam on
Sinnemahoning Creek in Cameron
County, Pennsylvania. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 30-foot-long,
VerDate Sep<11>2014
20:43 Sep 06, 2019
Jkt 247001
30-foot-wide, 160-foot-high Large Frame
Module; (2) two turbine-generator units
with a total rated capacity of 1.1
megawatts; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting
the new transformer to an existing
distribution line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 5,000
megawatt-hours.
Applicant Contact: Wayne Krouse,
Lock+TM Hydro Friends Fund XXIII,
LLC, P.O. Box 43796, Birmingham, AL
35243; phone: 877–556–6566 ext. 709.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14976–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14976) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19343 Filed 9–6–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP19–502–000; PF17–8–000]
Commonwealth LNG, LLC; Notice of
Application
Take notice that on August 20, 2019,
Commonwealth LNG, LLC
(Commonwealth), at One Riverway,
Suite 500, Houston, Texas 77056, filed
an application in the above reference
docket an application pursuant to
section 3 of the Natural Gas Act (NGA)
to construct and operate a natural gas
liquefaction and export facility and an
associated NGA section 3 pipeline in
Cameron Parish, Louisiana, referred as
the Commonwealth LNG Project, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s website web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Commission staff has determined that
this project qualifies as a Major
Infrastructure Project pursuant to the
Memorandum of Understanding
Implementing One Federal Decision
under Executive Order 13807 signed on
April 10, 2018. Major Infrastructure
Projects are defined as projects for
which multiple authorizations by
Federal agencies will be required and
the lead Federal agency has determined
that it will prepare an Environmental
Impact Statement under the National
Environmental Policy Act.1
Any questions concerning this
application may be directed to Robert
Powers, Commonwealth LNG, LLC, One
Riverway, Suite 500, Houston, Texas
77056, by telephone at (346) 352–4444
or by email at RPowers@teamcpl.com.
On August 15, 2017, Commission staff
granted the applicant’s request to utilize
the Pre-Filing Process and assigned
Docket No. PF17–8–000 to staff
activities involving the project. Now, as
of the filing of this application on
August 20, 2019, the Pre-Filing Process
for this project has ended. From this
1 42 U.S.C. (United States Code) 4321 et seq. For
more information on One Federal Decision, visit
our website at https://www.ferc.gov/industries/gas/
gen-info/one-federal.asp.
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 84, Number 174 (Monday, September 9, 2019)]
[Notices]
[Page 47284]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19343]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14976-000]
Lock\+TM\ Hydro Friends Fund XXIII, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
On March 1, 2019, Lock\+TM\ Hydro Friends Fund XXIII, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
George B. Stevenson Dam Hydropower Project to be located at the
Pennsylvania Department of Conservation and Natural Resources' George
B. Stevenson Dam on Sinnemahoning Creek in Cameron County,
Pennsylvania. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A new 30-
foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two
turbine-generator units with a total rated capacity of 1.1 megawatts;
(3) a new 4-foot-long, 4-foot-wide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13-kilovolt transmission line
connecting the new transformer to an existing distribution line; and
(5) appurtenant facilities. The proposed project would have an annual
generation of 5,000 megawatt-hours.
Applicant Contact: Wayne Krouse, Lock\+TM\ Hydro Friends Fund
XXIII, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877-556-6566
ext. 709.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14976-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14976) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19343 Filed 9-6-19; 8:45 am]
BILLING CODE 6717-01-P