North East Wisconsin Hydro, LLC; Notice of Drawdown, Temporary Variance and Soliciting Comments, 46505-46506 [2019-19068]
Download as PDF
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
• Liquid Waste Operations Update
• Liquid Waste Regulatory Update
Lunch Break
Presentations:
• Saltstone Reliability
• Salt Waste Processing Facility Update
• Tank Closure Cesium Removal
(TCCR) Program Update
• Federal Advisory Committee Act
Public Comments
Voting
Adjourn
Public Participation: The meeting is
open to the public. The EM SSAB,
Savannah River Site, welcomes the
attendance of the public at its advisory
committee meetings and will make
every effort to accommodate persons
with physical disabilities or special
needs. If you require special
accommodations due to a disability,
please contact Amy Boyette at least
seven days in advance of the meeting at
the telephone number listed above.
Written statements may be filed with
the Board either before or after the
meeting. Individuals who wish to make
oral statements pertaining to agenda
items should contact Amy Boyette’s
office at the address or telephone listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Amy Boyette at the
address or telephone number listed
above. Minutes will also be available at
the following website: https://
cab.srs.gov/srs-cab.html.
Signed in Washington, DC, on August 27,
2019.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2019–18952 Filed 9–3–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
[Docket No. ER02–2309–000]
Whitewater Hill Wind Partners, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
Dated: August 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
This is a supplemental notice in the
above-referenced Whitewater Hill Wind
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
Partners, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 4,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2019–19041 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00004
Fmt 4703
Sfmt 4703
46505
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2744–050]
North East Wisconsin Hydro, LLC;
Notice of Drawdown, Temporary
Variance and Soliciting Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Drawdown of the
Park Mill Power Canal.
b. Project No.: 2744–050.
c. Date Filed: August 5, 2019.
d. Applicant: North East Wisconsin
Hydro, LLC.
e. Name of Project: Menominee and
Park Mill Hydroelectric Project.
f. Location: The project is located on
the Menominee River in Menominee
County, Michigan, and Marinette
County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Michael
Scarzello, North East Wisconsin Hydro,
LLC, c/o Eagle Creek Renewable Energy,
116 North State Street, P.O. Box 167,
Neshkoro, WI 54960–0167, (973) 998–
8400.
i. FERC Contact: Aneela Mousam,
(202) 502–8357, aneela.mousam@
ferc.gov.
j. Deadline for filing comments is 15
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2744–050.
Comments emailed to Commission staff
are not considered part of the
Commission record.
k. Description of Request: The
licensee is requesting to conduct a
drawdown of the Park Mill Power Canal
as soon as possible, while it finalizes the
E:\FR\FM\04SEN1.SGM
04SEN1
jbell on DSK3GLQ082PROD with NOTICES
46506
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
Drawdown Plan required by Article 404
of the license. The licensee must lower
the water surface elevation of the
project’s 2,400-foot-long power canal by
approximately 18 feet to complete
turbine maintenance/repairs on several
units currently out of service. The
license proposes a drawdown rate of 1.0
feet per 24-hour with no more than 0.5
feet drop in any 8-hour period. The
drawdown, repair and refill is estimated
to span nine week. The licensee has
consulted with the Wisconsin and
Michigan Departments of Natural
Resources, and the U.S. Fish and
Wildlife Service.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE, Room 2A,
Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments: Anyone may submit
comments in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
Any comments must be received on or
before the specified comment date for
the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title COMMENTS, as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person commenting; and
(4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments must
set forth their evidentiary basis. A copy
of all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
Dated: August 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–19068 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–40–000]
Commission Information Collection
Activities (FERC–516A); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
516A, Small Generator Interconnection
Agreements.
SUMMARY:
Comments on the collection of
information are due November 4, 2019.
ADDRESSES: You may submit comments
(identified by Docket No. IC19–40–000)
by either of the following methods:
• eFiling at Commission’s Website:
https://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: https://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
ferconlinesupport@ferc.gov, or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–516A, Standardization of
Small Generator Interconnection
Agreements and Procedures.
OMB Control No.: 1902–0203.
DATES:
PO 00000
Frm 00005
Fmt 4703
Sfmt 4703
Type of Request: Three-year extension
of the FERC–516A information
collection requirements with no changes
to the current reporting requirements.
Abstract: Under Sections 205 and 206
of the Federal Power Act (FPA) the
Commission is charged with ensuring
just and reasonable electric transmission
rates and charges as well as ensuring
that jurisdictional providers do not
subject any person to any undue
prejudice or disadvantage.
The lack of consistent and readily
accessible terms and conditions for
connecting resources to the grid led to
a large number of disputes between
jurisdictional transmission providers
and small generators in the late 1990s
and early 2000s. In response, the
Commission directed transmission
providers to include Commissionapproved, standard, pro-forma
interconnection procedures (small
generator interconnection procedures or
SGIP) and a single uniformly applicable
interconnection agreement (small
generator interconnection agreement or
SGIA) in their open-access transmission
tariffs (OATTs). The requirement to
create and file these documents was
instituted August 2005 by Commission
Order No. 2006 and is codified in 18
CFR 35.28(f). This requirement set and
maintained a standard in OATTs for
consistent consideration and processing
of interconnection requests by
transmission providers.
Since the issuance of Order No. 2006,
many aspects of the energy industry
have changed including the growth of
small generator interconnection requests
and the growth in solar photovoltaic
(PV) installations. These changes have
been driven, in part, by state renewable
energy goals and policies. For example,
approximately 3,300 MW of gridconnected PV capacity were installed in
the U.S. in 2012 compared to 79 MW in
2005, the year Order No. 2006 was
issued.
In February 2012, pursuant to
Sections 205 and 206 of the FPA and
Rule 207 of the Commission’s Rules of
Practice and Procedures, and noting that
the Commission encouraged
stakeholders to submit proposed
revisions to the regulations set forth in
Order No. 2006, the Solar Energy
Industries Association (SEIA) filed a
Petition to Initiate Rulemaking
(Petition). The Petition requested the
Commission revise the pro forma SGIA
and SGIP set forth in Order No. 2006.
SEIA asserted that the pro forma SGIP
and SGIA as applied to small solar
generation were no longer just and
reasonable, had become unduly
discriminatory, and presented
unreasonable barriers to market entry.
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 84, Number 171 (Wednesday, September 4, 2019)]
[Notices]
[Pages 46505-46506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19068]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2744-050]
North East Wisconsin Hydro, LLC; Notice of Drawdown, Temporary
Variance and Soliciting Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Drawdown of the Park Mill Power Canal.
b. Project No.: 2744-050.
c. Date Filed: August 5, 2019.
d. Applicant: North East Wisconsin Hydro, LLC.
e. Name of Project: Menominee and Park Mill Hydroelectric Project.
f. Location: The project is located on the Menominee River in
Menominee County, Michigan, and Marinette County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Michael Scarzello, North East Wisconsin
Hydro, LLC, c/o Eagle Creek Renewable Energy, 116 North State Street,
P.O. Box 167, Neshkoro, WI 54960-0167, (973) 998-8400.
i. FERC Contact: Aneela Mousam, (202) 502-8357,
[email protected].
j. Deadline for filing comments is 15 days from the issuance date
of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-2744-050. Comments emailed to Commission
staff are not considered part of the Commission record.
k. Description of Request: The licensee is requesting to conduct a
drawdown of the Park Mill Power Canal as soon as possible, while it
finalizes the
[[Page 46506]]
Drawdown Plan required by Article 404 of the license. The licensee must
lower the water surface elevation of the project's 2,400-foot-long
power canal by approximately 18 feet to complete turbine maintenance/
repairs on several units currently out of service. The license proposes
a drawdown rate of 1.0 feet per 24-hour with no more than 0.5 feet drop
in any 8-hour period. The drawdown, repair and refill is estimated to
span nine week. The licensee has consulted with the Wisconsin and
Michigan Departments of Natural Resources, and the U.S. Fish and
Wildlife Service.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments: Anyone may submit comments in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. Any comments must be received on or before the specified comment
date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title COMMENTS, as applicable; (2) set forth in the
heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person commenting; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments must set forth their evidentiary basis. A copy
of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 385.2010.
Dated: August 19, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-19068 Filed 9-3-19; 8:45 am]
BILLING CODE 6717-01-P