Kinder Morgan Louisiana Pipeline, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Acadiana Project and Request for Comments on Environmental Issues, 46514-46516 [2019-19063]
Download as PDF
46514
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
Columbia Gulf’s Mainline Pool to a
primary delivery point at an
interconnection with KMLP in
Evangeline Parish, Louisiana.
Each new compressor station
(Shelburn Compressor Station in East
Carroll Parish, Red Mountain
Compressor Station in Catahoula Parish,
and Chicot Compressor Station in
Evangeline Parish) would include two
23,470 horsepower (hp) Solar Turbine
Titan 130 natural gas turbine driven
compressors (totaling 46,940 hp), filter/
separators, gas cooling bays, 48-inchdiameter suction and 42-inch-diameter
discharge piping, and related
appurtenant facilities.
Modifications to the existing
Alexandria Compressor Station in
Rapides Parish would include
additional cooling bays with associated
piping and appurtenant facilities.
The general location of the Louisiana
Xpress Project facilities is shown in
appendix 2.
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 167.4 acres of land
for the aboveground facilities. Following
construction, Columbia Gulf would
maintain about 35.8 acres for permanent
operation of the project’s facilities; the
remaining acreage would be restored
and revert to former uses.
jbell on DSK3GLQ082PROD with NOTICES
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• socioeconomics;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
2 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of the project
to formally cooperate in the preparation
of the EA.3 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 3).
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 The EA
for these project will document findings
on the impacts on historic properties
and summarize the status of
consultations under section 106.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP19–488). Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties, newspapers and local
libraries. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Additional Information
Dated: August 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–19066 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–484–000]
Kinder Morgan Louisiana Pipeline,
LLC; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Acadiana Project and
Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
E:\FR\FM\04SEN1.SGM
04SEN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
environmental assessment (EA) that will
discuss the environmental impacts of
the Acadiana Project involving
construction and operation of facilities
by Kinder Morgan Louisiana Pipeline,
LLC (KMLP) in Acadia and Evangeline
Parishes, Louisiana. The Commission
will use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on September 27, 2019.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on the project
to the Commission before the opening of
the docket on June 28, 2019, you will
need to file those comments in Docket
No. CP19–484–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for the project. State and
local government representatives should
notify their constituents of the proposed
project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
KMLP provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC website
(www.ferc.gov) at https://www.ferc.gov/
resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the docket/
project to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; a
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
46515
comment on a particular project is
considered a ‘‘Comment on a Filing;’’ or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the project docket number (CP19–484–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Summary of the Proposed Project
KMLP proposes to construct and
operate three new natural gas-fired
compressor units at its existing
compressor station, make modifications
to meter piping and new control valves
at its existing meter station, as well as
install auxiliary facilities at both
locations. The Acadiana Project would
increase the north-south natural gas
delivery capacity on its pipeline system
by approximately 894,000 dekatherms
per day. According to KMLP, its project
would meet the needs of Sabine Pass
Liquefaction, LLC at its liquefied natural
gas export terminal in Cameron Parish,
Louisiana.
The Acadiana Project would consist
of the installation of the following
facilities:
• Three new 31,900 horsepower Solar
Titan 250 natural gas-fired turbine
driven compressor units at KMLP’s
existing Compressor Station 760, in
Acadia Parish, Louisiana. Additionally,
KMLP would install natural gas cooling
equipment, two compressor buildings,
two master control buildings, a
switchgear building, two emergency
generators (requiring an extension of the
existing auxiliary building), filter
separators, fuel gas skids, fuel gas
heaters, and re-wheel the two existing
compressor units at Compressor Station
760; and
• Piping modifications and new
control valves at KMLP’s existing
Columbia Gulf Transmission, LLC Meter
Station in Evangeline Parish, Louisiana.
The general location of the Acadiana
Project facilities is shown in appendix
1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 88.5 acres of land
for all project facilities. Following
construction, KMLP would maintain
about 3.14 acres for permanent
operation of the project’s facilities; the
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE, Washington, DC 20426, or call (202) 502–
8371. For instructions on connecting to eLibrary,
refer to the last page of this notice.
E:\FR\FM\04SEN1.SGM
04SEN1
46516
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
remaining acreage would be restored
and revert to former uses. About 21.2
acres of the project would occur within
KMLP’s existing facilities.
The EA Process
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise;
• public safety; and
• cumulative impacts.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project, and
make recommendations on how to
lessen or avoid impacts on the various
resource areas.
The EA will present Commission
staffs’ independent analysis of the
issues. The EA will be available in
electronic format in the public record
through eLibrary 2 and the
Commission’s website (https://
www.ferc.gov/industries/gas/enviro/
eis.asp). If eSubscribed, you will receive
instant email notification when the EA
is issued. The EA may be issued for an
allotted public comment period.
Commission staff will consider all
comments on the EA before making
recommendations to the Commission.
To ensure Commission staff have the
opportunity to address your comments,
please carefully follow the instructions
in the Public Participation section,
beginning on page 2.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of the project
to formally cooperate in the preparation
of the EA.3 Agencies that would like to
request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
jbell on DSK3GLQ082PROD with NOTICES
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, the Commission is
2 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
using this notice to initiate consultation
with the applicable State Historic
Preservation Office, and to solicit their
views and those of other government
agencies, interested Indian tribes, and
the public on the project’s potential
effects on historic properties.4 The EA
for the project will document findings
on the impacts on historic properties
and summarize the status of
consultations under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties, and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. Commission
staff will update the environmental
mailing list as the analysis proceeds to
ensure that Commission notices related
to this environmental review are sent to
all individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If the Commission issues the EA for
an allotted public comment period, a
Notice of Availability of the EA will be
sent to the environmental mailing list
and will provide instructions to access
the electronic document on the FERC’s
website (www.ferc.gov). If you need to
make changes to your name/address, or
if you would like to remove your name
from the mailing list, please return the
attached ‘‘Mailing List Update Form’’
(appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on General Search and enter the
docket number in the Docket Number
field, excluding the last three digits (i.e.,
CP19–484). Be sure you have selected
an appropriate date range. For
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Dated: August 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–19063 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14968–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications: Lock+TM Hydro Friends
Fund XV, LLC
On March 1, 2019, Lock+TM Hydro
Friends Fund XV, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Francis Walter Dam
Hydropower Project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Francis Walter Dam on the Lehigh River
in Luzerne County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new 30-foot-wide,
30-foot-deep, 160-foot-tall modular
frame structure to be installed at the
intake for the outlet pipe adjacent to the
outlet tower, containing two turbinegenerator units with a rated capacity of
2,400 kilowatts each; (2) a new
switchgear and control room located in
the modular structure; and (3) a new 13kilovolt transmission line connecting
the modular structure with a nearby
existing electrical grid. The proposed
project would have an annual
generation of 20,000 megawatt-hours.
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 84, Number 171 (Wednesday, September 4, 2019)]
[Notices]
[Pages 46514-46516]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19063]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-484-000]
Kinder Morgan Louisiana Pipeline, LLC; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Acadiana Project
and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an
[[Page 46515]]
environmental assessment (EA) that will discuss the environmental
impacts of the Acadiana Project involving construction and operation of
facilities by Kinder Morgan Louisiana Pipeline, LLC (KMLP) in Acadia
and Evangeline Parishes, Louisiana. The Commission will use this EA in
its decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies about issues regarding the project. The National Environmental
Policy Act (NEPA) requires the Commission to take into account the
environmental impacts that could result from its action whenever it
considers the issuance of a Certificate of Public Convenience and
Necessity. NEPA also requires the Commission to discover concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of issues
to address in the EA. To ensure that your comments are timely and
properly recorded, please submit your comments so that the Commission
receives them in Washington, DC on or before 5:00 p.m. Eastern Time on
September 27, 2019.
You can make a difference by submitting your specific comments or
concerns about the project. Your comments should focus on the potential
environmental effects, reasonable alternatives, and measures to avoid
or lessen environmental impacts. Your input will help the Commission
staff determine what issues they need to evaluate in the EA. Commission
staff will consider all filed comments during the preparation of the
EA.
If you sent comments on the project to the Commission before the
opening of the docket on June 28, 2019, you will need to file those
comments in Docket No. CP19-484-000 to ensure they are considered as
part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for the project. State and local government
representatives should notify their constituents of the proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, that approval conveys with it the right of
eminent domain. Therefore, if you and the company do not reach an
easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law.
KMLP provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/gas/gas.pdf.
Public Participation
The Commission offers a free service called eSubscription which
makes it easy to stay informed of all issuances and submittals
regarding the docket/project to which you subscribe. These instant
email notifications are the fastest way to receive notification and
provide a link to the document files which can reduce the amount of
time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/esubscription.asp.
For your convenience, there are three methods you can use to submit
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected]. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to Documents and Filings. Using eComment is an easy
method for submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is also on the Commission's website (www.ferc.gov) under
the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing;'' or
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the project docket number
(CP19-484-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Summary of the Proposed Project
KMLP proposes to construct and operate three new natural gas-fired
compressor units at its existing compressor station, make modifications
to meter piping and new control valves at its existing meter station,
as well as install auxiliary facilities at both locations. The Acadiana
Project would increase the north-south natural gas delivery capacity on
its pipeline system by approximately 894,000 dekatherms per day.
According to KMLP, its project would meet the needs of Sabine Pass
Liquefaction, LLC at its liquefied natural gas export terminal in
Cameron Parish, Louisiana.
The Acadiana Project would consist of the installation of the
following facilities:
Three new 31,900 horsepower Solar Titan 250 natural gas-
fired turbine driven compressor units at KMLP's existing Compressor
Station 760, in Acadia Parish, Louisiana. Additionally, KMLP would
install natural gas cooling equipment, two compressor buildings, two
master control buildings, a switchgear building, two emergency
generators (requiring an extension of the existing auxiliary building),
filter separators, fuel gas skids, fuel gas heaters, and re-wheel the
two existing compressor units at Compressor Station 760; and
Piping modifications and new control valves at KMLP's
existing Columbia Gulf Transmission, LLC Meter Station in Evangeline
Parish, Louisiana.
The general location of the Acadiana Project facilities is shown in
appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE, Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 88.5
acres of land for all project facilities. Following construction, KMLP
would maintain about 3.14 acres for permanent operation of the
project's facilities; the
[[Page 46516]]
remaining acreage would be restored and revert to former uses. About
21.2 acres of the project would occur within KMLP's existing
facilities.
The EA Process
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise;
public safety; and
cumulative impacts.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
The EA will present Commission staffs' independent analysis of the
issues. The EA will be available in electronic format in the public
record through eLibrary \2\ and the Commission's website (https://www.ferc.gov/industries/gas/enviro/eis.asp). If eSubscribed, you will
receive instant email notification when the EA is issued. The EA may be
issued for an allotted public comment period. Commission staff will
consider all comments on the EA before making recommendations to the
Commission. To ensure Commission staff have the opportunity to address
your comments, please carefully follow the instructions in the Public
Participation section, beginning on page 2.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of the project to formally cooperate in the
preparation of the EA.\3\ Agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office,
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The EA for the project will document
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties, and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. Commission staff will update the environmental
mailing list as the analysis proceeds to ensure that Commission notices
related to this environmental review are sent to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If the Commission issues the EA for an allotted public comment
period, a Notice of Availability of the EA will be sent to the
environmental mailing list and will provide instructions to access the
electronic document on the FERC's website (www.ferc.gov). If you need
to make changes to your name/address, or if you would like to remove
your name from the mailing list, please return the attached ``Mailing
List Update Form'' (appendix 2).
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on General Search and enter the docket number in
the Docket Number field, excluding the last three digits (i.e., CP19-
484). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
[email protected] or (866) 208-3676, or for TTY, contact (202)
502-8659. The eLibrary link also provides access to the texts of all
formal documents issued by the Commission, such as orders, notices, and
rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along
with other related information.
Dated: August 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-19063 Filed 9-3-19; 8:45 am]