Combined Notice of Filings #1, 46511-46512 [2019-19036]
Download as PDF
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
Size
Number of
entities
Average hours
per entity
Total burden
hours 7
(1)
(2)
(1) * (2)
Large ..........................................................................................................................
Medium ......................................................................................................................
Small ..........................................................................................................................
The total estimated annual cost
burden to respondents is $212,482,720,
which includes $127,433,401 for nonlabor record storage costs and
$85,049,319 for employee costs. The
average cost per respondent is $417,451,
which includes $250,360 for non-labor
record storage costs and $167,091 for
employee costs. All of these cost figures
are based on staff analysis of the data we
received in 2019.
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19043 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSK3GLQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–113–000.
Applicants: Golden State Water
Company.
Description: Supplement to July 12,
2019 Application for Authorization
Under Section 203 of the Federal Power
Act [Revised Exhibit N] of Golden State
Water Company.
Filed Date: 8/28/19.
Accession Number: 20190828–5072.
7 Due to rounding during the analysis and
calculations, the total in this column does not sum
to the exact figure reported shown in the summary
burden table.
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
174
166
169
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: EC19–129–000.
Applicants: Ambit Northeast, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Ambit
Northeast, LLC.
Filed Date: 8/28/19.
Accession Number: 20190828–5139.
Comments Due: 5 p.m. ET 9/18/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1762–001.
Applicants: Electric Energy, Inc.
Description: Compliance filing:
Compliance to 2019 Att M and Att N to
be effective 4/30/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5063.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2150–001.
Applicants: Shawville Power, LLC.
Description: Compliance filing:
Shawville Power LLC Compliance
Filing to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5032.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2151–001.
Applicants: New Castle Power, LLC.
Description: Compliance filing: New
Castle Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5033.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2152–001.
Applicants: Brunot Island Power,
LLC.
Description: Compliance filing:
Brunot Island Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5035.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2153–001.
Applicants: Gilbert Power, LLC.
Description: Compliance filing:
Gilbert Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5036.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2154–001.
Applicants: Sayreville Power, LLC.
Description: Compliance filing:
Sayreville Power Compliance Filing to
be effective 9/1/2019.
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
46511
11,475
2,371
1,571
1,996,658
393,619
265,572
Filed Date: 8/28/19.
Accession Number: 20190828–5037.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2155–001.
Applicants: Portland Power, LLC.
Description: Compliance filing:
Portland Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5038.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2156–001.
Applicants: Warren Generation, LLC.
Description: Compliance filing:
Warren Generation Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5039.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2157–001.
Applicants: Mountain Power, LLC.
Description: Compliance filing:
Mountain Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5040.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2158–001.
Applicants: Orrtanna Power, LLC.
Description: Compliance filing:
Orrtanna Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5041.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2159–001.
Applicants: Shawnee Power, LLC.
Description: Compliance filing:
Shawnee Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5042.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2160–001.
Applicants: Titus Power, LLC.
Description: Compliance filing: Titus
Power Compliance Filing to be effective
9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5043.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2161–001.
Applicants: Hamilton Power, LLC.
Description: Compliance filing:
Hamilton Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5047.
E:\FR\FM\04SEN1.SGM
04SEN1
jbell on DSK3GLQ082PROD with NOTICES
46512
Federal Register / Vol. 84, No. 171 / Wednesday, September 4, 2019 / Notices
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2162–001.
Applicants: Blossburg Power, LLC.
Description: Compliance filing:
Blossburg Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5052.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2163–001.
Applicants: Hunterstown Power, LLC.
Description: Compliance filing:
Hunterstown Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5053.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2164–001.
Applicants: Tolna Power, LLC.
Description: Compliance filing: Tolna
Power Compliance Filing to be effective
9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5057.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2505–001.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment: Refile
WDAT Energy Storage to be effective
10/30/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5130.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2687–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–27 Transferred Frequency
Response Agreement with Tacoma
Power to be effective 12/1/2019.
Filed Date: 8/27/19.
Accession Number: 20190827–5101.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19–2688–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5459; Queue
No. AE1–041 to be effective 7/29/2019.
Filed Date: 8/27/19.
Accession Number: 20190827–5106.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19–2689–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–27 Transferred Frequency
Response Agreement with PUD No. 2
Grant Co. to be effective 12/1/2019.
Filed Date: 8/27/19.
Accession Number: 20190827–5117.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19–2690–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–27 Transferred Frequency
VerDate Sep<11>2014
19:08 Sep 03, 2019
Jkt 247001
Response Agreement with PUD No. 1
Chelan Co. to be effective 12/1/2019.
Filed Date: 8/27/19.
Accession Number: 20190827–5119.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19–2691–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: GIA
and Distribution Service Agmt
SCEBESS–021 Project to be effective 8/
29/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5001.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2692–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–28 Transferred Frequency
Response Agreement with Bonneville
Power Admin to be effective 12/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5098.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2693–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–28 Transferred Frequency
Response Agreement with City of
Seattle to be effective 12/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5103.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2694–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–28 Transferred Frequency
Response Agreement with Powerex to
be effective 12/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5105.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2695–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to Clarify Trading Hub
Modification Process Language to be
effective 10/28/2019.
Filed Date: 8/28/19.
Accession Number: 20190828–5108.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19–2696–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 5159 and
ICSA, SA No. 5189; Queue No. AB2–040
(amend) to be effective 8/8/2018.
Filed Date: 8/28/19.
Accession Number: 20190828–5116.
Comments Due: 5 p.m. ET 9/18/19.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–19036 Filed 9–3–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Docket No. CP19–488–000]
Columbia Gulf Transmission, LLC;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Louisiana Xpress Project,
Request for Comments on
Environmental Issues, and Notice of
Public Scoping Session
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Louisiana Xpress Project involving
construction and operation of facilities
by Columbia Gulf Transmission, LLC
(Columbia Gulf) in Evangeline, East
Carroll, Catahoula, and Rapides
Parishes, Louisiana. The Commission
will use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
E:\FR\FM\04SEN1.SGM
04SEN1
Agencies
[Federal Register Volume 84, Number 171 (Wednesday, September 4, 2019)]
[Notices]
[Pages 46511-46512]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-19036]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-113-000.
Applicants: Golden State Water Company.
Description: Supplement to July 12, 2019 Application for
Authorization Under Section 203 of the Federal Power Act [Revised
Exhibit N] of Golden State Water Company.
Filed Date: 8/28/19.
Accession Number: 20190828-5072.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: EC19-129-000.
Applicants: Ambit Northeast, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Ambit Northeast, LLC.
Filed Date: 8/28/19.
Accession Number: 20190828-5139.
Comments Due: 5 p.m. ET 9/18/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-1762-001.
Applicants: Electric Energy, Inc.
Description: Compliance filing: Compliance to 2019 Att M and Att N
to be effective 4/30/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5063.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2150-001.
Applicants: Shawville Power, LLC.
Description: Compliance filing: Shawville Power LLC Compliance
Filing to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5032.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2151-001.
Applicants: New Castle Power, LLC.
Description: Compliance filing: New Castle Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5033.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2152-001.
Applicants: Brunot Island Power, LLC.
Description: Compliance filing: Brunot Island Power Compliance
Filing to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5035.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2153-001.
Applicants: Gilbert Power, LLC.
Description: Compliance filing: Gilbert Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5036.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2154-001.
Applicants: Sayreville Power, LLC.
Description: Compliance filing: Sayreville Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5037.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2155-001.
Applicants: Portland Power, LLC.
Description: Compliance filing: Portland Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5038.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2156-001.
Applicants: Warren Generation, LLC.
Description: Compliance filing: Warren Generation Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5039.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2157-001.
Applicants: Mountain Power, LLC.
Description: Compliance filing: Mountain Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5040.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2158-001.
Applicants: Orrtanna Power, LLC.
Description: Compliance filing: Orrtanna Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5041.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2159-001.
Applicants: Shawnee Power, LLC.
Description: Compliance filing: Shawnee Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5042.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2160-001.
Applicants: Titus Power, LLC.
Description: Compliance filing: Titus Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5043.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2161-001.
Applicants: Hamilton Power, LLC.
Description: Compliance filing: Hamilton Power Compliance Filing to
be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5047.
[[Page 46512]]
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2162-001.
Applicants: Blossburg Power, LLC.
Description: Compliance filing: Blossburg Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5052.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2163-001.
Applicants: Hunterstown Power, LLC.
Description: Compliance filing: Hunterstown Power Compliance Filing
to be effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5053.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2164-001.
Applicants: Tolna Power, LLC.
Description: Compliance filing: Tolna Power Compliance Filing to be
effective 9/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5057.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2505-001.
Applicants: Southern California Edison Company.
Description: Tariff Amendment: Refile WDAT Energy Storage to be
effective 10/30/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5130.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2687-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-27 Transferred
Frequency Response Agreement with Tacoma Power to be effective 12/1/
2019.
Filed Date: 8/27/19.
Accession Number: 20190827-5101.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19-2688-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA SA No. 5459;
Queue No. AE1-041 to be effective 7/29/2019.
Filed Date: 8/27/19.
Accession Number: 20190827-5106.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19-2689-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-27 Transferred
Frequency Response Agreement with PUD No. 2 Grant Co. to be effective
12/1/2019.
Filed Date: 8/27/19.
Accession Number: 20190827-5117.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19-2690-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-27 Transferred
Frequency Response Agreement with PUD No. 1 Chelan Co. to be effective
12/1/2019.
Filed Date: 8/27/19.
Accession Number: 20190827-5119.
Comments Due: 5 p.m. ET 9/17/19.
Docket Numbers: ER19-2691-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: GIA and Distribution Service
Agmt SCEBESS-021 Project to be effective 8/29/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5001.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2692-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-28 Transferred
Frequency Response Agreement with Bonneville Power Admin to be
effective 12/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5098.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2693-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-28 Transferred
Frequency Response Agreement with City of Seattle to be effective 12/1/
2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5103.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2694-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-28 Transferred
Frequency Response Agreement with Powerex to be effective 12/1/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5105.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2695-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Clarify Trading
Hub Modification Process Language to be effective 10/28/2019.
Filed Date: 8/28/19.
Accession Number: 20190828-5108.
Comments Due: 5 p.m. ET 9/18/19.
Docket Numbers: ER19-2696-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, SA No.
5159 and ICSA, SA No. 5189; Queue No. AB2-040 (amend) to be effective
8/8/2018.
Filed Date: 8/28/19.
Accession Number: 20190828-5116.
Comments Due: 5 p.m. ET 9/18/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 28, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-19036 Filed 9-3-19; 8:45 am]
BILLING CODE 6717-01-P