Combined Notice of Filings #1, 45746-45747 [2019-18835]

Download as PDF 45746 Federal Register / Vol. 84, No. 169 / Friday, August 30, 2019 / Notices students’ reading, mathematics, and science literacy. PISA was first administered in 2000 and is conducted every three years. The United States has participated in all of the previous cycles and is participating in 2021 in order to track trends and to compare the performance of U.S. students with that of students in other education systems. PISA 2021 is sponsored by the Organization for Economic Cooperation and Development (OECD). In the United States, PISA is conducted by the National Center for Education Statistics (NCES), within the U.S. Department of Education. In each administration of PISA, one of the subject areas (reading, mathematics, or science literacy) is the major domain and has the broadest content coverage, while the other two subjects are the minor domains. PISA emphasizes functional skills that students have acquired as they near the end of mandatory schooling (aged 15 years), and students’ knowledge and skills gained both in and out of school environments. PISA 2021 will focus on mathematics literacy as the major domain. Reading and science literacy will also be assessed as minor domains, with additional assessment of financial literacy. In addition to the cognitive assessments described above, PISA 2021 will include questionnaires administered to school principals and assessed students. To prepare for the main study in 2021, PISA countries will conduct a field test in the spring of 2020, primarily to evaluate newly developed assessment and questionnaire items but also to test the assessment operations. The PISA 2021 field test data collection will occur in the U.S.A. from March–April 2020 and the main study data collection from September–November 2021. This submission requests approval for: All recruitment and data collection activities related to the 2020 field test, and the overarching plan and recruitment of schools for the PISA 2021 main study. jspears on DSK3GMQ082PROD with NOTICES Dated: August 27, 2019. Kate Mullan, PRA Coordinator, Information Collection Clearance Program, Information Management Branch, Office of the Chief Information Officer. [FR Doc. 2019–18777 Filed 8–29–19; 8:45 am] BILLING CODE 4000–01–P VerDate Sep<11>2014 16:43 Aug 29, 2019 Jkt 247001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–128–000. Applicants: Wildorado Wind, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. Filed Date: 8/23/19. Accession Number: 20190823–5176. Comments Due: 5 p.m. ET 9/13/19. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–172–000. Applicants: TWE Bowman Solar Project, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of TWE Bowman Solar Project, LLC. Filed Date: 8/23/19. Accession Number: 20190823–5160. Comments Due: 5 p.m. ET 9/13/19. Docket Numbers: EG19–173–000. Applicants: MD Solar 2, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status. Filed Date: 8/26/19. Accession Number: 20190826–5032. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: EG19–174–000. Applicants: FL Solar 4, LLC. Description: FL Solar 4 Submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/26/19. Accession Number: 20190826–5033. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: EG19–175–000. Applicants: AZ Solar 1, LLC. Description: AZ Solar 1, LLC Submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/26/19. Accession Number: 20190826–5034. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: EG19–176–000. Applicants: GA Solar 3, LLC. Description: AZ Solar 1, LLC Submits Notice of Self-Certification of Exempt Wholesale Generator Status. Filed Date: 8/26/19. Accession Number: 20190826–5035. Comments Due: 5 p.m. ET 9/16/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2065–002. Applicants: Midcontinent Independent System Operator, Inc., Ameren Illinois Company. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Description: Tariff Amendment: 2019–08–26_SA 2026 Ameren-Hannibal Second Substitute 2nd Rev WDS to be effective 8/1/2019. Filed Date: 8/26/19. Accession Number: 20190826–5094. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: ER19–2275–001. Applicants: MidAmerican Energy Company. Description: Tariff Amendment: Concurrence with Ottumwa GS Unit 1 F&O Agt—Amendment to ER19–2275 to be effective 6/27/2019. Filed Date: 8/26/19. Accession Number: 20190826–5093. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: ER19–2680–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: E&P Agreement for EDPR CA Solar ParkSandrini Sol 2 to be effective 8/27/2019. Filed Date: 8/26/19. Accession Number: 20190826–5000. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: ER19–2681–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Attachment AE Revisions to Modify Market Timelines to be effective 12/31/ 9998. Filed Date: 8/26/19. Accession Number: 20190826–5089. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: ER19–2682–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original ICSA, SA No. 5454; Queue No. AB2–093 to be effective 7/26/2019. Filed Date: 8/26/19. Accession Number: 20190826–5142. Comments Due: 5 p.m. ET 9/16/19. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR19–8–000. Applicants: North American Electric Reliability Corporation. Description: Request of North American Electric Reliability Corporation for Acceptance of its 2020 Business Plan and Budget and the 2020 Business Plans and Budgets of Regional Entities and for Approval of Proposed Assessments to Fund Budgets. Filed Date: 8/23/19. Accession Number: 20190823–5182. Comments Due: 5 p.m. ET 9/16/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings E:\FR\FM\30AUN1.SGM 30AUN1 Federal Register / Vol. 84, No. 169 / Friday, August 30, 2019 / Notices must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 26, 2019. Kimberly D. Bose, Secretary. BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: jspears on DSK3GMQ082PROD with NOTICES Filings Instituting Proceedings Docket Number: PR19–73–000. Applicants: Ameren Illinois Company. Description: Tariff filing per 284.123(b)(2)+(g): Amended Statement of Operating Conditions to be effective 8/22/2019. Filed Date: 8/22/19. Accession Number: 201908225062. Comments Due: 5 p.m. ET 9/12/19. 284.123(g) Protests Due: 5 p.m. ET 10/ 21/19. Docket Numbers: CP17–40–004. Applicants: Spire STL Pipeline LLC. Description: Abbreviated Application of Spire STL Pipeline LLC for Limited Amendment of Certificate of Public Convenience and Necessity. Filed Date: 8/21/19. Accession Number: 20190821–5122. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: RP19–1479–000. Applicants: LA Storage, LLC. Description: § 4(d) Rate Filing: Filing of Negotiated Rate, Conforming IW Agreement (Increased Capacity) to be effective 8/20/2019. Filed Date: 8/20/19. Accession Number: 20190820–5029. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: RP19–1480–000. Applicants: Southern Natural Gas Company, L.L.C. 16:43 Aug 29, 2019 Jkt 247001 Docket Numbers: RP19–1481–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—FTP—Who Dat MC 547 to be effective 7/1/2019. Filed Date: 8/22/19. Accession Number: 20190822–5063. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: RP19–1482–000. Applicants: Equitrans, L.P. Description: Compliance filing Notice Regarding Non-Jurisdictional Gathering Facilities (Copley System). Filed Date: 8/22/19. Accession Number: 20190822–5121. Comments Due: 5 p.m. ET 9/3/19. [FR Doc. 2019–18835 Filed 8–29–19; 8:45 am] VerDate Sep<11>2014 Description: § 4(d) Rate Filing: Fuel Retention Rates—Winter 2019 to be effective 10/1/2019. Filed Date: 8/22/19. Accession Number: 20190822–5030. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: RP19–1483–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiated Rate AGS Agreement to be effective 12/31/9998. Filed Date: 8/22/19. Accession Number: 20190822–5124. Comments Due: 5 p.m. ET 9/3/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 26, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–18831 Filed 8–29–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 45747 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OECA–2012–0687; FRL–9999– 04–OMS] Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Stationary Combustion Turbines (Renewal) Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Stationary Combustion Turbines (EPA ICR Number 1967.08, OMB Control Number 2060–0540), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through November 30, 2019. Public comments were previously requested, via the Federal Register, on May 6, 2019 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before September 30, 2019. SUMMARY: Submit your comments, referencing Docket ID Number EPA– HQ–OECA–2012–0687, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute. FOR FURTHER INFORMATION CONTACT: Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of ADDRESSES: E:\FR\FM\30AUN1.SGM 30AUN1

Agencies

[Federal Register Volume 84, Number 169 (Friday, August 30, 2019)]
[Notices]
[Pages 45746-45747]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18835]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-128-000.
    Applicants: Wildorado Wind, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act, et al.
    Filed Date: 8/23/19.
    Accession Number: 20190823-5176.
    Comments Due: 5 p.m. ET 9/13/19.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-172-000.
    Applicants: TWE Bowman Solar Project, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of TWE Bowman Solar Project, LLC.
    Filed Date: 8/23/19.
    Accession Number: 20190823-5160.
    Comments Due: 5 p.m. ET 9/13/19.

    Docket Numbers: EG19-173-000.
    Applicants: MD Solar 2, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5032.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: EG19-174-000.
    Applicants: FL Solar 4, LLC.
    Description: FL Solar 4 Submits Notice of Self-Certification of 
Exempt Wholesale Generator Status.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5033.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: EG19-175-000.
    Applicants: AZ Solar 1, LLC.
    Description: AZ Solar 1, LLC Submits Notice of Self-Certification 
of Exempt Wholesale Generator Status.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5034.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: EG19-176-000.
    Applicants: GA Solar 3, LLC.
    Description: AZ Solar 1, LLC Submits Notice of Self-Certification 
of Exempt Wholesale Generator Status.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5035.
    Comments Due: 5 p.m. ET 9/16/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2065-002.
    Applicants: Midcontinent Independent System Operator, Inc., Ameren 
Illinois Company.
    Description: Tariff Amendment: 2019-08-26_SA 2026 Ameren-Hannibal 
Second Substitute 2nd Rev WDS to be effective 8/1/2019.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5094.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: ER19-2275-001.
    Applicants: MidAmerican Energy Company.
    Description: Tariff Amendment: Concurrence with Ottumwa GS Unit 1 
F&O Agt--Amendment to ER19-2275 to be effective 6/27/2019.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5093.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: ER19-2680-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: E&P Agreement for EDPR CA 
Solar Park-Sandrini Sol 2 to be effective 8/27/2019.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5000.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: ER19-2681-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: Attachment AE Revisions to 
Modify Market Timelines to be effective 12/31/9998.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5089.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: ER19-2682-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original ICSA, SA No. 5454; 
Queue No. AB2-093 to be effective 7/26/2019.
    Filed Date: 8/26/19.
    Accession Number: 20190826-5142.
    Comments Due: 5 p.m. ET 9/16/19.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR19-8-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Request of North American Electric Reliability 
Corporation for Acceptance of its 2020 Business Plan and Budget and the 
2020 Business Plans and Budgets of Regional Entities and for Approval 
of Proposed Assessments to Fund Budgets.
    Filed Date: 8/23/19.
    Accession Number: 20190823-5182.
    Comments Due: 5 p.m. ET 9/16/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings

[[Page 45747]]

must file in accordance with Rules 211 and 214 of the Commission's 
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern 
time on the specified comment date. Protests may be considered, but 
intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 26, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-18835 Filed 8-29-19; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.