Lock+TM Hydro Friends Fund XX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 45146-45147 [2019-18541]

Download as PDF 45146 Federal Register / Vol. 84, No. 167 / Wednesday, August 28, 2019 / Notices The following is a list of off-therecord communications recently received by the Secretary of the Commission. The communications listed are grouped by docket numbers in ascending order. These filings are available for electronic review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https:// www.ferc.gov using the eLibrary link. Enter the docket number, excluding the Docket No. File date Prohibited: None. Exempt: CP18–46–000 ......................................................... Dated: August 21, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–18474 Filed 8–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2670–000] jbell on DSK3GLQ082PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: SR Meridian III, LLC This is a supplemental notice in the above-referenced SR Meridian III, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 11, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the VerDate Sep<11>2014 20:14 Aug 27, 2019 Jkt 247001 Presenter or requester 8–6–2019 Pennsylvania Department of Community & Economic Development. eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 22, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–18509 Filed 8–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14973–000] Lock+TM Hydro Friends Fund XX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2019, Lock+TM Hydro Friends Fund XX, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Blue Marsh Dam Hydropower Project to be located at the U.S. Army Corps of Engineers’ (Corps) Blue Marsh Dam on the Tulpehocken Creek in Berks County, Pennsylvania. PO 00000 Frm 00027 last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Fmt 4703 Sfmt 4703 The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A new 30-foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two turbine-generator units with a total rated capacity of 1.75 megawatts; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting the new transformer to an existing distribution line; and (5) appurtenant facilities. The proposed project would have an annual generation of 7,750 megawatt-hours. Applicant Contact: Wayne Krouse, Lock∂TM Hydro Friends Fund XX, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877–556–6566 ext. 709. FERC Contact: Woohee Choi; phone: (202) 502–6336. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please E:\FR\FM\28AUN1.SGM 28AUN1 Federal Register / Vol. 84, No. 167 / Wednesday, August 28, 2019 / Notices send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–14973–000. More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of the Commission’s website at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14973) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: August 22, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–18541 Filed 8–27–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD19–11–000] Board of Water Works of Pueblo, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On August 21, 2019, the Board of Water Works of Pueblo, Colorado, filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA). The proposed Whitlock Hydroelectric Facility Project would have an installed capacity of up to 1,100 kilowatts (kW), and would be located at the Whitlock Water Treatment 45147 Plant in the City of Pueblo, Pueblo County, Colorado. Applicant Contact: Karl F. Kumli, III, Esq., 2060 Broadway, #400, Boulder, CO 80302, Phone No. (303) 447–1375, Email: karlk@dietzedavis.com. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, Email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) An up to 1,100 kW in-line turbine-generating unit within an existing 38-foot by 33.5-foot pressure dissipation building; and (2) appurtenant facilities. The proposed project would have an estimated annual generation of up to 3,000 megawatthours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Description FPA 30(a)(3)(A) ........... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 40 megawatts .............................................. On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. FPA 30(a)(3)(C)(i) ....... FPA 30(a)(3)(C)(ii) ...... FPA 30(a)(3)(C)(iii) ...... jbell on DSK3GLQ082PROD with NOTICES Satisfies (Y/N) Statutory provision Preliminary Determination: The proposed Whitlock Hydroelectric Facility Project will not interfere with the primary purpose of the conduit, which is to transport water for municipal use. Therefore, based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is September 27, 2019. Deadline for filing motions to intervene is September 27, 2019. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A VerDate Sep<11>2014 20:14 Aug 27, 2019 Jkt 247001 CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at 1 18 PO 00000 Fmt 4703 Sfmt 4703 Y Y Y FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the eLibrary link. Enter the docket number (i.e., CD19–11) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. CFR 385.2001–2005 (2018). Frm 00028 Y E:\FR\FM\28AUN1.SGM 28AUN1

Agencies

[Federal Register Volume 84, Number 167 (Wednesday, August 28, 2019)]
[Notices]
[Pages 45146-45147]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18541]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14973-000]


Lock+TM Hydro Friends Fund XX, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On March 1, 2019, Lock\+TM\ Hydro Friends Fund XX, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the Blue 
Marsh Dam Hydropower Project to be located at the U.S. Army Corps of 
Engineers' (Corps) Blue Marsh Dam on the Tulpehocken Creek in Berks 
County, Pennsylvania. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) A new 30-
foot-long, 30-foot-wide, 160-foot-high Large Frame Module; (2) two 
turbine-generator units with a total rated capacity of 1.75 megawatts; 
(3) a new 4-foot-long, 4-foot-wide, 3-foot-high pad-mounted 
transformer; (4) a new 200-foot-long, 13-kilovolt transmission line 
connecting the new transformer to an existing distribution line; and 
(5) appurtenant facilities. The proposed project would have an annual 
generation of 7,750 megawatt-hours.
    Applicant Contact: Wayne Krouse, Lock+TM Hydro Friends 
Fund XX, LLC, P.O. Box 43796, Birmingham, AL 35243; phone: 877-556-6566 
ext. 709.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please

[[Page 45147]]

send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-14973-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the eLibrary link of the 
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14973) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

     Dated: August 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-18541 Filed 8-27-19; 8:45 am]
 BILLING CODE 6717-01-P