Board of Water Works of Pueblo, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 45147-45148 [2019-18529]
Download as PDF
Federal Register / Vol. 84, No. 167 / Wednesday, August 28, 2019 / Notices
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14973–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14973) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–18541 Filed 8–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD19–11–000]
Board of Water Works of Pueblo,
Colorado; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On August 21, 2019, the Board of
Water Works of Pueblo, Colorado, filed
a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA). The proposed
Whitlock Hydroelectric Facility Project
would have an installed capacity of up
to 1,100 kilowatts (kW), and would be
located at the Whitlock Water Treatment
45147
Plant in the City of Pueblo, Pueblo
County, Colorado.
Applicant Contact: Karl F. Kumli, III,
Esq., 2060 Broadway, #400, Boulder, CO
80302, Phone No. (303) 447–1375,
Email: karlk@dietzedavis.com.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, Email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) An up to
1,100 kW in-line turbine-generating unit
within an existing 38-foot by 33.5-foot
pressure dissipation building; and (2)
appurtenant facilities. The proposed
project would have an estimated annual
generation of up to 3,000 megawatthours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
FPA 30(a)(3)(A) ...........
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric power and uses for
such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ..............................................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements
of Part I of the FPA.
FPA 30(a)(3)(C)(i) .......
FPA 30(a)(3)(C)(ii) ......
FPA 30(a)(3)(C)(iii) ......
jbell on DSK3GLQ082PROD with NOTICES
Satisfies
(Y/N)
Statutory provision
Preliminary Determination: The
proposed Whitlock Hydroelectric
Facility Project will not interfere with
the primary purpose of the conduit,
which is to transport water for
municipal use. Therefore, based upon
the above criteria, Commission staff
preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is September 27, 2019.
Deadline for filing motions to
intervene is September 27, 2019.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the COMMENTS
CONTESTING QUALIFICATION FOR A
VerDate Sep<11>2014
20:14 Aug 27, 2019
Jkt 247001
CONDUIT HYDROPOWER FACILITY or
MOTION TO INTERVENE, as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
1 18
PO 00000
Fmt 4703
Sfmt 4703
Y
Y
Y
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the eLibrary link. Enter the docket
number (i.e., CD19–11) in the docket
number field to access the document.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
CFR 385.2001–2005 (2018).
Frm 00028
Y
E:\FR\FM\28AUN1.SGM
28AUN1
45148
Federal Register / Vol. 84, No. 167 / Wednesday, August 28, 2019 / Notices
Dated: August 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–18529 Filed 8–27–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14972–000]
jbell on DSK3GLQ082PROD with NOTICES
Lock+TM Hydro Friends Fund XIX, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2019, Lock+TM Hydro
Friends Fund XIX, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Tioga Dam
Hydropower Project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Tioga Dam on the Tioga River in Tioga
County, Pennsylvania. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A new 30-foot-long,
30-foot-wide, 160-foot-high Large Frame
Module; (2) two turbine-generator units
with a total rated capacity of 2.2
megawatts; (3) a new 4-foot-long, 4-footwide, 3-foot-high pad-mounted
transformer; (4) a new 200-foot-long, 13kilovolt transmission line connecting
the new transformer to an existing
distribution line; and (5) appurtenant
facilities. The proposed project would
have an annual generation of 9,700
megawatt-hours.
Applicant Contact: Wayne Krouse,
Lock+TM Hydro Friends Fund XIX, LLC,
P.O. Box 43796, Birmingham, AL 35243;
phone: 877–556–6566 ext. 709.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
VerDate Sep<11>2014
20:14 Aug 27, 2019
Jkt 247001
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14972–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s website at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14972) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–18538 Filed 8–27–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OLEM–2018–0305; FRL–9997–
08–OMS]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; Guidance for Applicants
Requesting To Treat/Dispose of PCBs
Using Incineration or an Alternative
Method (New)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
Guidance for Applicants Requesting to
Treat/Dispose of PCBs Using
Incineration or an Alternative Method
(EPA ICR Number 2596.01, OMB
Control Number 2070–NEW), to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a request of a
new collection. Public comments were
previously requested via the Federal
Register on April 16, 2019 during a 60day comment period. This notice allows
SUMMARY:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
for an additional 30 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before September 27,
2019.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OLEM–2018–0305, to (1) EPA, either
online using www.regulations.gov (our
preferred method), or by email to rcradocket@epa.gov, or by mail to: RCRA
Docket (2822T), U.S. Environmental
Protection Agency, 1200 Pennsylvania
Avenue NW, Washington, DC 20460;
and (2) OMB via email to oira_
submission@omb.eop.gov. Address
comments to OMB Desk Officer for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT: Josh
Smeraldi, Office of Resource
Conservation and Recovery (Mail Code
5303P), U.S. Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460; telephone
number: 703–308–0441; email address:
smeraldi.josh@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Abstract: Guidance documents were
developed in 1986 for persons applying
to EPA for approval to dispose of PCBs
using incineration (40 CFR 761.70) or a
method alternative to incineration (40
CFR 761.60(e)). The guidances are split
into two document (thermal and nonthermal) and they present and discuss
the format, content, and suggested level
of detail for approval applications, test
plans, and test reports.
EPA is currently updating these
guidance documents and will combine
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 84, Number 167 (Wednesday, August 28, 2019)]
[Notices]
[Pages 45147-45148]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18529]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD19-11-000]
Board of Water Works of Pueblo, Colorado; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On August 21, 2019, the Board of Water Works of Pueblo, Colorado,
filed a notice of intent to construct a qualifying conduit hydropower
facility, pursuant to section 30 of the Federal Power Act (FPA). The
proposed Whitlock Hydroelectric Facility Project would have an
installed capacity of up to 1,100 kilowatts (kW), and would be located
at the Whitlock Water Treatment Plant in the City of Pueblo, Pueblo
County, Colorado.
Applicant Contact: Karl F. Kumli, III, Esq., 2060 Broadway, #400,
Boulder, CO 80302, Phone No. (303) 447-1375, Email:
[email protected].
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email:
[email protected].
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) An up to 1,100 kW in-line turbine-
generating unit within an existing 38-foot by 33.5-foot pressure
dissipation building; and (2) appurtenant facilities. The proposed
project would have an estimated annual generation of up to 3,000
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial consumption
and not primarily for
the generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed, operated,
or maintained for the
generation of electric
power and uses for
such generation only
the hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Whitlock Hydroelectric
Facility Project will not interfere with the primary purpose of the
conduit, which is to transport water for municipal use. Therefore,
based upon the above criteria, Commission staff preliminarily
determines that the proposal satisfies the requirements for a
qualifying conduit hydropower facility, which is not required to be
licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is
September 27, 2019.
Deadline for filing motions to intervene is September 27, 2019.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the COMMENTS CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY or MOTION TO INTERVENE, as applicable; (2)
state in the heading the name of the applicant and the project number
of the application to which the filing responds; (3) state the name,
address, and telephone number of the person filing; and (4) otherwise
comply with the requirements of sections 385.2001 through 385.2005 of
the Commission's regulations.\1\ All comments contesting Commission
staff's preliminary determination that the facility meets the
qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2018).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE, Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE, Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the eLibrary link. Enter the docket number (i.e., CD19-11) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call
(202) 502-8659.
[[Page 45148]]
Dated: August 22, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-18529 Filed 8-27-19; 8:45 am]