Boulder Canyon Project, 44294-44295 [2019-18220]
Download as PDF
44294
Federal Register / Vol. 84, No. 164 / Friday, August 23, 2019 / Notices
Dated: August 20, 2019.
Kate Mullan,
PRA Coordinator, Information Collection
Clearance Program, Information Management
Branch, Office of the Chief Information
Officer.
The base charge decreased by $3.3
million to $66.4 million, a 4.8%
reduction from FY 2019. The reduction
is primarily the result of an increase in
non-power revenue projections for the
Hoover Dam visitor center.
DATES: The FY 2020 base charge and
rates will be effective October 1, 2019,
and will remain in effect through
September 30, 2020.
FOR FURTHER INFORMATION CONTACT: Mr.
Ronald E. Moulton, Regional Manager,
Desert Southwest Region, Western Area
Power Administration, P.O. Box 6457,
Phoenix, AZ 85005–6457, (602) 605–
2525, or dswpwrmrk@wapa.gov; or Ms.
Tina Ramsey, Rates Manager, Desert
Southwest Region, Western Area Power
Administration, (602) 605–2565, or
ramsey@wapa.gov.
SUPPLEMENTARY INFORMATION: On June 6,
2018, the Federal Energy Regulatory
Commission (FERC) confirmed and
approved Rate Schedule BCP–F10 under
Rate Order No. WAPA–178 on a final
basis through September 30, 2022.1 The
[FR Doc. 2019–18236 Filed 8–22–19; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project
Western Area Power
Administration, DOE.
ACTION: Notice concerning fiscal year
2020 Boulder Canyon Project base
charge and rates for electric service.
AGENCY:
The Assistant Secretary for
Electricity confirms, approves, and
places into effect, on a final basis, the
Boulder Canyon Project (BCP) base
charge and rates for fiscal year (FY)
2020 under Rate Schedule BCP–F10.
SUMMARY:
rate-setting methodology for BCP
calculates an annual base charge rather
than a unit rate for Hoover Dam
hydropower. The base charge recovers
an annual revenue requirement that
includes projected costs of investment
repayment, interest, operations,
maintenance, replacements, payments
to States, and Hoover Dam visitor
services. Non-power revenue
projections such as water sales, Hoover
Dam visitor revenue, ancillary services,
and late fees help offset these projected
costs. Customers are billed a percentage
of the base charge in proportion to their
Hoover power allocation. Rates are
calculated for comparative purposes but
are not used to determine the charges
for service.
Rate Schedule BCP–F10 and the BCP
Electric Service Agreement require
WAPA to determine the annual base
charge and rates for the next fiscal year
before October 1 of each year. The FY
2019 BCP base charge and rates expire
on September 30, 2019.
COMPARISON OF BASE CHARGE AND RATES
jbell on DSK3GLQ082PROD with NOTICES
Base Charge ($) ..............................................................................................
Composite Rate (mills/kWh) ............................................................................
Energy Rate (mills/kWh) ..................................................................................
Capacity Rate ($/kW-Mo) ................................................................................
A $5.1 million increase in non-power
revenue projections primarily resulting
from the resumption of typical revenues
following completion of renovations to
the Hoover Dam visitor center and $1.3
million in prior year carryover
contributed to the FY 2020 base charge
reduction.
The Bureau of Reclamation’s FY 2020
budget is increasing by $3.7 million.
Higher operation and maintenance
expenses of $1.8 million and
replacement costs of $1.4 million
account for most of this increase.
WAPA’s FY 2020 budget is decreasing
by $600,000 due to a $400,000 reduction
in dispatching and substation
maintenance expenses and a $200,000
reduction in replacement costs.
The FY 2020 composite and energy
rates are decreasing by 4.4 percent. The
reduction of the base charge contributes
to these decreases. The capacity rate is
decreasing by 6.9 percent. This decline
is due to a reduction in the base charge
and an increase in capacity projections.
FY 2019
FY 2020
$69,741,657
18.92
9.46
$1.88
$66,419,402
18.08
9.04
$1.75
Public Notice and Comment
The notice of the proposed FY 2020
base charge and rates for electric service
was published consistent with
procedures set forth in 10 CFR part 903
and 10 CFR part 904. WAPA took the
following steps to involve customers
and interested parties in the rate
process:
1. On April 9, 2019, a Federal
Register notice (84 FR 14111)
announced the proposed base charge
and rates and initiated the 90-day public
consultation and comment period.
2. On May 9, 2019, WAPA held a
public information forum in Phoenix,
Arizona. WAPA’s representatives
explained the proposed base charge and
rates, provided handouts, and were
available to answer questions.
3. On June 10, 2019, WAPA held a
public comment forum in Phoenix,
Arizona, to provide an opportunity for
customers and interested parties to
comment and ask questions for the
record.
16:40 Aug 22, 2019
Jkt 247001
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
¥$3,322,255
¥0.84
¥0.42
¥$0.13
Percent
change
¥4.8
¥4.4
¥4.4
¥6.9
4. On July 8, 2019, the consultation
and comment period ended, and WAPA
received four comments. The comments
appear below, paraphrased where
appropriate without compromising their
meaning.
Comment: A commenter thanked
WAPA for lowering its FY 2020
operations and maintenance budget and
requested additional detail on the
budget.
Response: WAPA’s operations and
maintenance budget for FY 2020 is
$8,307,206 and is comprised of facility
expense totaling $2,491,204 and
systemwide expense totaling
$5,816,002. Further detail on the budget
is included in WAPA’s Ten-Year
Operating Plan, which is available on
WAPA’s website.
Comment: A commenter asked for
information about Reclamation’s
administrative and general expense
refund adjustment.
Response: Reclamation receives a
credit from appropriations for its post911 security contract costs. Reclamation
1 Order Confirming and Approving Rate Schedule
on a Final Basis, FERC Docket No. EF18–1–000, 163
FERC ¶ 62,154 (2018).
VerDate Sep<11>2014
Amount
change
E:\FR\FM\23AUN1.SGM
23AUN1
Federal Register / Vol. 84, No. 164 / Friday, August 23, 2019 / Notices
has historically budgeted $200,000
annually for this credit, which was
included in the administrative and
general expense category. Due to the
variability of the credit amount,
Reclamation is no longer budgeting for
this item beginning in FY 2020.
Comment: A commenter asked for the
balance of Post-Retirement Benefits
(PRB) collections in the accounts for the
current and previous marketing periods.
Response: While there are not
separate accounts for PRB collections,
Reclamation and WAPA identified PRB
balances for the two marketing periods
requested. The PRB balance for the
marketing period concluded in FY 2017
totals $30,929,279. As of the end of FY
2018, the PRB balance for the marketing
period beginning in FY 2018 totals
$1,729,545.
Comment: A commenter asked why
Reclamation’s PRB budget increased in
FY 2020.
Response: There are three
components of PRB: (1) Civil Service
Retirement System and Federal
Employee Retirement System costs, (2)
Federal Employee Health Benefits
(FEHB) costs, and (3) Federal Employee
Group Life Insurance costs. PRB budget
projections are calculated using a fiveyear average of expenditures. The fiveyear average included in the FY 2020
PRB budget rose primarily due to an
increase in FEHB costs in FY 2018. PRB
historical expenditures and projections
are available on WAPA’s website.
Certification of Rates
WAPA’s Administrator certified that
the FY 2020 base charge and rates under
Rate Schedule BCP–F10 are the lowest
possible rates, consistent with sound
business principles. The base charge
and rates were developed following
administrative policies and applicable
laws.
jbell on DSK3GLQ082PROD with NOTICES
Availability of Information
Information about the rate process to
establish the FY 2020 base charge and
rates was made available on WAPA’s
website at https://www.wapa.gov/
regions/DSW/Rates/Pages/bouldercanyon-rates.aspx.
Legal Authority
10 CFR part 904.7(e) requires annual
review of the BCP base charge and an
adjustment, either upward or
downward, when necessary and
administratively feasible to assure
sufficient revenues to effect payment of
all costs and financial obligations
associated with the project. The
Administrator provided all Contractors
an opportunity to comment on the
proposed base charge adjustment
VerDate Sep<11>2014
17:54 Aug 22, 2019
Jkt 247001
consistent with the procedures for
public participation in rate adjustments
as required under 10 CFR part 904.7(e)
and the BCP Electric Service Agreement.
The BCP Electric Service Agreement
goes on to state that in years other than
the first and fifth years of a rate
schedule approved by the Federal
Energy Regulatory Commission on a
final basis, adjustments to the base
charge shall be effective upon approval
by the Deputy Secretary of Energy.
Under the Department of Energy
Organization Act, the Secretary of
Energy holds plenary authority over
Department of Energy affairs with
respect to the Power Marketing
Administrations. By Delegation Order
No. 00–002.00Q, effective November 1,
2018, the Secretary of Energy delegated
to the Under Secretary of Energy the
authority vested in the Secretary with
respect to WAPA. By Redelegation
Order No. 00–002.10D, effective June 4,
2019, the Under Secretary of Energy
delegated to the Assistant Secretary for
Electricity the same authority with
respect to WAPA.2 This rate action is
issued under the Redelegation Order
and DOE’s procedures for public
participation in rate adjustments set
forth at 10 CFR part 903 and 10 CFR
part 904.3
Following DOE’s review of WAPA’s
proposal, I hereby confirm, approve,
and place the FY 2020 base charge and
rates for BCP electric service, under Rate
Schedule BCP–F10, into effect on a final
basis through September 30, 2020.
Dated: August 19, 2019.
Bruce J. Walker,
Assistant Secretary for Electricity.
44295
meeting of the Children’s Health
Protection Advisory Committee
(CHPAC) will be held September 5 and
6, 2019 at Milken Institute School of
Public Health, located at 950 New
Hampshire Ave NW, Washington, DC
20052. Due to unforeseen administrative
circumstances, EPA is announcing this
meeting with less than 15 calendar days’
notice. The CHPAC advises the
Environmental Protection Agency (EPA)
on science, regulations and other issues
relating to children’s environmental
health.
September 5, 2019 from 9 a.m. to
5 p.m. and September 6, 2019 from 9
a.m. to 1 p.m.
ADDRESSES: 950 New Hampshire Ave.
NW, Washington, DC 20052.
FOR FURTHER INFORMATION CONTACT: Nica
Louie, Office of Children’s Health
Protection, U.S. EPA, MC 1107T, 1200
Pennsylvania Avenue NW, Washington,
DC 20460, (202) 564–7633 or
louie.nica@epa.gov.
SUPPLEMENTARY INFORMATION: The
meetings of the CHPAC are open to the
public. An agenda will be posted to
https://www.epa.gov/children/
childrens-health-protection-advisorycommittee-chpac.
Access and Accommodations: For
information on access or services for
individuals with disabilities, please
contact Nica Louie at 202–564–7633 or
louie.nica@epa.gov.
DATES:
Dated: July 10, 2019.
Nica Louie,
Environmental Health Scientist.
[FR Doc. 2019–18237 Filed 8–22–19; 8:45 am]
BILLING CODE 6560–50–P
[FR Doc. 2019–18220 Filed 8–22–19; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9046–4]
[FRL–9997–93–OA]
Environmental Impact Statements;
Notice of Availability
Notice of Meeting of the EPA
Children’s Health Protection Advisory
Committee (CHPAC)
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
Pursuant to the provisions of
the Federal Advisory Committee Act,
notice is hereby given that the next
SUMMARY:
2 Delegation
Orders No. 00–002–00Q and 00–
002.10D both clarify that this delegation of
authority is ‘‘In addition’’ to the authority to
approve and place into effect on an interim basis
WAPA’s power and transmission rates.
3 50 FR 37835 (Sept. 18, 1985) and 84 FR 5347
(Feb. 21, 2019).
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/
nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/12/2019 Through 08/16/2019
Pursuant to 40 CFR 1506.9
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
E:\FR\FM\23AUN1.SGM
23AUN1
Agencies
[Federal Register Volume 84, Number 164 (Friday, August 23, 2019)]
[Notices]
[Pages 44294-44295]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18220]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice concerning fiscal year 2020 Boulder Canyon Project base
charge and rates for electric service.
-----------------------------------------------------------------------
SUMMARY: The Assistant Secretary for Electricity confirms, approves,
and places into effect, on a final basis, the Boulder Canyon Project
(BCP) base charge and rates for fiscal year (FY) 2020 under Rate
Schedule BCP-F10. The base charge decreased by $3.3 million to $66.4
million, a 4.8% reduction from FY 2019. The reduction is primarily the
result of an increase in non-power revenue projections for the Hoover
Dam visitor center.
DATES: The FY 2020 base charge and rates will be effective October 1,
2019, and will remain in effect through September 30, 2020.
FOR FURTHER INFORMATION CONTACT: Mr. Ronald E. Moulton, Regional
Manager, Desert Southwest Region, Western Area Power Administration,
P.O. Box 6457, Phoenix, AZ 85005-6457, (602) 605-2525, or
[email protected]; or Ms. Tina Ramsey, Rates Manager, Desert Southwest
Region, Western Area Power Administration, (602) 605-2565, or
[email protected].
SUPPLEMENTARY INFORMATION: On June 6, 2018, the Federal Energy
Regulatory Commission (FERC) confirmed and approved Rate Schedule BCP-
F10 under Rate Order No. WAPA-178 on a final basis through September
30, 2022.\1\ The rate-setting methodology for BCP calculates an annual
base charge rather than a unit rate for Hoover Dam hydropower. The base
charge recovers an annual revenue requirement that includes projected
costs of investment repayment, interest, operations, maintenance,
replacements, payments to States, and Hoover Dam visitor services. Non-
power revenue projections such as water sales, Hoover Dam visitor
revenue, ancillary services, and late fees help offset these projected
costs. Customers are billed a percentage of the base charge in
proportion to their Hoover power allocation. Rates are calculated for
comparative purposes but are not used to determine the charges for
service.
---------------------------------------------------------------------------
\1\ Order Confirming and Approving Rate Schedule on a Final
Basis, FERC Docket No. EF18-1-000, 163 FERC ] 62,154 (2018).
---------------------------------------------------------------------------
Rate Schedule BCP-F10 and the BCP Electric Service Agreement
require WAPA to determine the annual base charge and rates for the next
fiscal year before October 1 of each year. The FY 2019 BCP base charge
and rates expire on September 30, 2019.
Comparison of Base Charge and Rates
----------------------------------------------------------------------------------------------------------------
FY 2019 FY 2020 Amount change Percent change
----------------------------------------------------------------------------------------------------------------
Base Charge ($)................................. $69,741,657 $66,419,402 -$3,322,255 -4.8
Composite Rate (mills/kWh)...................... 18.92 18.08 -0.84 -4.4
Energy Rate (mills/kWh)......................... 9.46 9.04 -0.42 -4.4
Capacity Rate ($/kW-Mo)......................... $1.88 $1.75 -$0.13 -6.9
----------------------------------------------------------------------------------------------------------------
A $5.1 million increase in non-power revenue projections primarily
resulting from the resumption of typical revenues following completion
of renovations to the Hoover Dam visitor center and $1.3 million in
prior year carryover contributed to the FY 2020 base charge reduction.
The Bureau of Reclamation's FY 2020 budget is increasing by $3.7
million. Higher operation and maintenance expenses of $1.8 million and
replacement costs of $1.4 million account for most of this increase.
WAPA's FY 2020 budget is decreasing by $600,000 due to a $400,000
reduction in dispatching and substation maintenance expenses and a
$200,000 reduction in replacement costs.
The FY 2020 composite and energy rates are decreasing by 4.4
percent. The reduction of the base charge contributes to these
decreases. The capacity rate is decreasing by 6.9 percent. This decline
is due to a reduction in the base charge and an increase in capacity
projections.
Public Notice and Comment
The notice of the proposed FY 2020 base charge and rates for
electric service was published consistent with procedures set forth in
10 CFR part 903 and 10 CFR part 904. WAPA took the following steps to
involve customers and interested parties in the rate process:
1. On April 9, 2019, a Federal Register notice (84 FR 14111)
announced the proposed base charge and rates and initiated the 90-day
public consultation and comment period.
2. On May 9, 2019, WAPA held a public information forum in Phoenix,
Arizona. WAPA's representatives explained the proposed base charge and
rates, provided handouts, and were available to answer questions.
3. On June 10, 2019, WAPA held a public comment forum in Phoenix,
Arizona, to provide an opportunity for customers and interested parties
to comment and ask questions for the record.
4. On July 8, 2019, the consultation and comment period ended, and
WAPA received four comments. The comments appear below, paraphrased
where appropriate without compromising their meaning.
Comment: A commenter thanked WAPA for lowering its FY 2020
operations and maintenance budget and requested additional detail on
the budget.
Response: WAPA's operations and maintenance budget for FY 2020 is
$8,307,206 and is comprised of facility expense totaling $2,491,204 and
systemwide expense totaling $5,816,002. Further detail on the budget is
included in WAPA's Ten-Year Operating Plan, which is available on
WAPA's website.
Comment: A commenter asked for information about Reclamation's
administrative and general expense refund adjustment.
Response: Reclamation receives a credit from appropriations for its
post-911 security contract costs. Reclamation
[[Page 44295]]
has historically budgeted $200,000 annually for this credit, which was
included in the administrative and general expense category. Due to the
variability of the credit amount, Reclamation is no longer budgeting
for this item beginning in FY 2020.
Comment: A commenter asked for the balance of Post-Retirement
Benefits (PRB) collections in the accounts for the current and previous
marketing periods.
Response: While there are not separate accounts for PRB
collections, Reclamation and WAPA identified PRB balances for the two
marketing periods requested. The PRB balance for the marketing period
concluded in FY 2017 totals $30,929,279. As of the end of FY 2018, the
PRB balance for the marketing period beginning in FY 2018 totals
$1,729,545.
Comment: A commenter asked why Reclamation's PRB budget increased
in FY 2020.
Response: There are three components of PRB: (1) Civil Service
Retirement System and Federal Employee Retirement System costs, (2)
Federal Employee Health Benefits (FEHB) costs, and (3) Federal Employee
Group Life Insurance costs. PRB budget projections are calculated using
a five-year average of expenditures. The five-year average included in
the FY 2020 PRB budget rose primarily due to an increase in FEHB costs
in FY 2018. PRB historical expenditures and projections are available
on WAPA's website.
Certification of Rates
WAPA's Administrator certified that the FY 2020 base charge and
rates under Rate Schedule BCP-F10 are the lowest possible rates,
consistent with sound business principles. The base charge and rates
were developed following administrative policies and applicable laws.
Availability of Information
Information about the rate process to establish the FY 2020 base
charge and rates was made available on WAPA's website at https://www.wapa.gov/regions/DSW/Rates/Pages/boulder-canyon-rates.aspx.
Legal Authority
10 CFR part 904.7(e) requires annual review of the BCP base charge
and an adjustment, either upward or downward, when necessary and
administratively feasible to assure sufficient revenues to effect
payment of all costs and financial obligations associated with the
project. The Administrator provided all Contractors an opportunity to
comment on the proposed base charge adjustment consistent with the
procedures for public participation in rate adjustments as required
under 10 CFR part 904.7(e) and the BCP Electric Service Agreement. The
BCP Electric Service Agreement goes on to state that in years other
than the first and fifth years of a rate schedule approved by the
Federal Energy Regulatory Commission on a final basis, adjustments to
the base charge shall be effective upon approval by the Deputy
Secretary of Energy. Under the Department of Energy Organization Act,
the Secretary of Energy holds plenary authority over Department of
Energy affairs with respect to the Power Marketing Administrations. By
Delegation Order No. 00-002.00Q, effective November 1, 2018, the
Secretary of Energy delegated to the Under Secretary of Energy the
authority vested in the Secretary with respect to WAPA. By Redelegation
Order No. 00-002.10D, effective June 4, 2019, the Under Secretary of
Energy delegated to the Assistant Secretary for Electricity the same
authority with respect to WAPA.\2\ This rate action is issued under the
Redelegation Order and DOE's procedures for public participation in
rate adjustments set forth at 10 CFR part 903 and 10 CFR part 904.\3\
---------------------------------------------------------------------------
\2\ Delegation Orders No. 00-002-00Q and 00-002.10D both clarify
that this delegation of authority is ``In addition'' to the
authority to approve and place into effect on an interim basis
WAPA's power and transmission rates.
\3\ 50 FR 37835 (Sept. 18, 1985) and 84 FR 5347 (Feb. 21, 2019).
---------------------------------------------------------------------------
Following DOE's review of WAPA's proposal, I hereby confirm,
approve, and place the FY 2020 base charge and rates for BCP electric
service, under Rate Schedule BCP-F10, into effect on a final basis
through September 30, 2020.
Dated: August 19, 2019.
Bruce J. Walker,
Assistant Secretary for Electricity.
[FR Doc. 2019-18220 Filed 8-22-19; 8:45 am]
BILLING CODE 6450-01-P