Combined Notice of Filings #2, 43799 [2019-18123]
Download as PDF
43799
Federal Register / Vol. 84, No. 163 / Thursday, August 22, 2019 / Notices
FERC–725P1: MANDATORY RELIABILITY STANDARDS: PRC–005–6 2
Number of
respondents
Annual
number of
responses per
respondent
Total number
of responses
Average
burden hours
and cost per
response 3
Total annual burden
hours
and total annual
cost 4
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
5 996
PRC–005–6 Reliability Standard .................
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–18125 Filed 8–21–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–168–000.
Applicants: SR Arlington II MT, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of SR Arlington II MT,
LLC.
Filed Date: 8/16/19.
Accession Number: 20190816–5149.
Comments Due: 5 p.m. ET 9/6/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2621–000.
Applicants: FirstLight Power
Management LLC.
Description: Compliance filing: Notice
of Succession and New eTariff Baseline
Filing to be effective 8/17/2019.
figures (https://www.bls.gov/oes/current/naics2_
22.htm) and benefits (https://www.bls.gov/
news.release/ecec.nr0.htm) for May 2017 posted by
the Bureau of Labor Statistics for the Utilities
sector. The hourly estimates for salary plus benefits
VerDate Sep<11>2014
16:37 Aug 21, 2019
Jkt 247001
1
996
Filed Date: 8/16/19.
Accession Number: 20190816–5072.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19–2622–000.
Applicants: FirstLight Hydro
Generating Company.
Description: Tariff Cancellation:
Notice of Cancellation to be effective
8/17/2019.
Filed Date: 8/16/19.
Accession Number: 20190816–5079.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19–2623–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–16 EIM Implementation
Agreement With Turlock Irrigation Dist.
to be effective 1/1/2011.
Filed Date: 8/16/19.
Accession Number: 20190816–5090.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19–2624–000.
Applicants: Merrill Lynch
Commodities, Inc.
Description: § 205(d) Rate Filing:
normal 2019 to be effective 8/17/2019.
Filed Date: 8/16/19.
Accession Number: 20190816–5132.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19–2625–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
NITSA—(Idaho Falls Power) Rev 3 to be
effective 8/1/2019.
Filed Date: 8/16/19.
Accession Number: 20190816–5140.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19–2626–000.
Applicants: Rosewater Wind Farm
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 10/16/2019.
Filed Date: 8/16/19.
Accession Number: 20190816–5163.
Comments Due: 5 p.m. ET 9/6/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
are $66.90/hour based on the Electrical Engineering
career (Occupation Code: 17–2071).
4 Total Annual Cost is rounded-up from
$133,264.80 to $133,265.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
2 hrs.; $133.80 ...........
1,992 hrs.;
$133,265 6
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–18123 Filed 8–21–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10934–032]
Sugar River Hydro II, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Protests and
Motions To Intervene
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Extension of
License Term.
b. Project No.: P–10934–032.
c. Date Filed: July 17, 2019.
d. Licensee: Sugar River Hydro II,
LLC.
5 20 (PC role only) + 927 (GO role only) + 49
(joint role as PC and GO) = 996 unique entities.
6 This number is rounded from $133,264.80.
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 84, Number 163 (Thursday, August 22, 2019)]
[Notices]
[Page 43799]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-18123]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-168-000.
Applicants: SR Arlington II MT, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of SR Arlington II MT, LLC.
Filed Date: 8/16/19.
Accession Number: 20190816-5149.
Comments Due: 5 p.m. ET 9/6/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-2621-000.
Applicants: FirstLight Power Management LLC.
Description: Compliance filing: Notice of Succession and New
eTariff Baseline Filing to be effective 8/17/2019.
Filed Date: 8/16/19.
Accession Number: 20190816-5072.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19-2622-000.
Applicants: FirstLight Hydro Generating Company.
Description: Tariff Cancellation: Notice of Cancellation to be
effective 8/17/2019.
Filed Date: 8/16/19.
Accession Number: 20190816-5079.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19-2623-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-08-16 EIM
Implementation Agreement With Turlock Irrigation Dist. to be effective
1/1/2011.
Filed Date: 8/16/19.
Accession Number: 20190816-5090.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19-2624-000.
Applicants: Merrill Lynch Commodities, Inc.
Description: Sec. 205(d) Rate Filing: normal 2019 to be effective
8/17/2019.
Filed Date: 8/16/19.
Accession Number: 20190816-5132.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19-2625-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA NITSA--(Idaho Falls
Power) Rev 3 to be effective 8/1/2019.
Filed Date: 8/16/19.
Accession Number: 20190816-5140.
Comments Due: 5 p.m. ET 9/6/19.
Docket Numbers: ER19-2626-000.
Applicants: Rosewater Wind Farm LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 10/16/2019.
Filed Date: 8/16/19.
Accession Number: 20190816-5163.
Comments Due: 5 p.m. ET 9/6/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 16, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-18123 Filed 8-21-19; 8:45 am]
BILLING CODE 6717-01-P