Download as PDF 43118 Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 13, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–17850 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2894–013] jbell on DSK3GLQ082PROD with NOTICES Flambeau Hydro, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License. b. Project No.: P–2894–013. c. Date filed: December 31, 2018. d. Applicant: Flambeau Hydro, LLC. e. Name of Project: Black Brook Hydroelectric Project. f. Location: The existing project is located on the Apple River near the City of Amery, Polk County, Wisconsin. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Jason P. Kreuscher, Vice President, Renewable World Energies, LLC, 100 S State Street, P.O. Box 264, Neshkoro, WI 54960; (855) 994–93376 ext 102; or email at jason@rwehydro.com. i. FERC Contact: Michael Davis at (202) 502–8339; or michael.davis@ ferc.gov. j. Deadline for filing scoping comments: September 13, 2019. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, VerDate Sep<11>2014 20:49 Aug 19, 2019 Jkt 247001 using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2894–013. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. Project Description: Black Brook Project consists of the following existing facilities: (1) A 131-foot-long by 32-foothigh concrete gravity dam with three 12foot-high by 12-foot-wide radial gates, a 32.5-foot-wide by 23.6-foot-high overflow section with a 6-inch flashboard, a 315-foot-long by 12-footwide by 8.3-foot-high left embankment, and a 75-foot-long by 38.5-foot-wide by 31.2-foot-high right embankment; (2) a 10-foot-long by 3.17-foot-wide by 15foot-high reinforced concrete intake structure containing two 7-foot-wide by 12-foot-high steel dewatering gates and two 65-degree inclined 16-foot-wide by 15-foot-high trash racks with a 1.5-inch clear-bar spacing; (3) a cement block powerhouse with two generating units providing a total of 0.645 megawatt of installed capacity; (4) a tailrace; (5) a 13.2-kilovolt (kV) substation facility; (6) a 20-foot-long, 2,400-volt transmission line and a 1.25-mile-long, 13.2-kV transmission line; and (7) appurtenant facilities. The project has a normal pool elevation of 1045.47 feet National Geodetic Vertical Datum 1988 with a surface area of about 98 acres and no usable storage capacity. The project generates about 7,336 megawatt-hours annually. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to address the document. For assistance, contact FERC Online PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Support. A copy is available for inspection and reproduction at the address in Item H above. n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process: The Commission staff intends to prepare a single Environmental Assessment (EA) for the project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed action. At this time, we do not anticipate holding on-site public or agency scoping meetings. Instead, we are soliciting your comments and suggestions on the preliminary list of issues and alternatives to be addressed in the EA, as described in scoping document 1 (SD1), issued August 14, 2019. Copies of the SD1 outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866–208–3676 or for TTY, (202) 502–8659. Dated: August 14, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17899 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP19–495–000; PF18–6–000] Double E Pipeline, LLC; Notice of Application Take notice that on July 31, 2019, Double E Pipeline, LLC (Double E), 1790 Hughes Landing Blvd., Suite 500, The Woodlands, Texas 77380, filed in Docket No. CP19–495–000 an application, pursuant to section 7(c) of the Natural Gas Act (NGA) and Parts 157 and 284 of the Commission’s regulations, requesting a certificate of public convenience and necessity to construct, operate and maintain its Double E Pipeline Project. Specifically, Double E seeks authorization to E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 84, Number 161 (Tuesday, August 20, 2019)]
[Notices]
[Page 43118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17899]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2894-013]


Flambeau Hydro, LLC; Notice Soliciting Scoping Comments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent License.
    b. Project No.: P-2894-013.
    c. Date filed: December 31, 2018.
    d. Applicant: Flambeau Hydro, LLC.
    e. Name of Project: Black Brook Hydroelectric Project.
    f. Location: The existing project is located on the Apple River 
near the City of Amery, Polk County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Jason P. Kreuscher, Vice President, 
Renewable World Energies, LLC, 100 S State Street, P.O. Box 264, 
Neshkoro, WI 54960; (855) 994-93376 ext 102; or email at 
[email protected].
    i. FERC Contact: Michael Davis at (202) 502-8339; or 
[email protected].
    j. Deadline for filing scoping comments: September 13, 2019. The 
Commission strongly encourages electronic filing. Please file scoping 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426. The first page of any filing should include 
docket number P-2894-013.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. Project Description: Black Brook Project consists of the 
following existing facilities: (1) A 131-foot-long by 32-foot-high 
concrete gravity dam with three 12-foot-high by 12-foot-wide radial 
gates, a 32.5-foot-wide by 23.6-foot-high overflow section with a 6-
inch flashboard, a 315-foot-long by 12-foot-wide by 8.3-foot-high left 
embankment, and a 75-foot-long by 38.5-foot-wide by 31.2-foot-high 
right embankment; (2) a 10-foot-long by 3.17-foot-wide by 15-foot-high 
reinforced concrete intake structure containing two 7-foot-wide by 12-
foot-high steel dewatering gates and two 65-degree inclined 16-foot-
wide by 15-foot-high trash racks with a 1.5-inch clear-bar spacing; (3) 
a cement block powerhouse with two generating units providing a total 
of 0.645 megawatt of installed capacity; (4) a tailrace; (5) a 13.2-
kilovolt (kV) substation facility; (6) a 20-foot-long, 2,400-volt 
transmission line and a 1.25-mile-long, 13.2-kV transmission line; and 
(7) appurtenant facilities. The project has a normal pool elevation of 
1045.47 feet National Geodetic Vertical Datum 1988 with a surface area 
of about 98 acres and no usable storage capacity. The project generates 
about 7,336 megawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov using the eLibrary link. 
Enter the docket number excluding the last three digits in the docket 
number field to address the document. For assistance, contact FERC 
Online Support. A copy is available for inspection and reproduction at 
the address in Item H above.
    n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    o. Scoping Process: The Commission staff intends to prepare a 
single Environmental Assessment (EA) for the project in accordance with 
the National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable 
alternatives to the proposed action.
    At this time, we do not anticipate holding on-site public or agency 
scoping meetings. Instead, we are soliciting your comments and 
suggestions on the preliminary list of issues and alternatives to be 
addressed in the EA, as described in scoping document 1 (SD1), issued 
August 14, 2019.
    Copies of the SD1 outlining the subject areas to be addressed in 
the EA were distributed to the parties on the Commission's mailing list 
and the applicant's distribution list. Copies of SD1 may be viewed on 
the web at https://www.ferc.gov using the eLibrary link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, call 1-866-208-3676 or 
for TTY, (202) 502-8659.

    Dated: August 14, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17899 Filed 8-19-19; 8:45 am]
 BILLING CODE 6717-01-P