Flambeau Hydro, LLC; Notice Soliciting Scoping Comments, 43118 [2019-17899]
Download as PDF
43118
Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–17850 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2894–013]
jbell on DSK3GLQ082PROD with NOTICES
Flambeau Hydro, LLC; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: P–2894–013.
c. Date filed: December 31, 2018.
d. Applicant: Flambeau Hydro, LLC.
e. Name of Project: Black Brook
Hydroelectric Project.
f. Location: The existing project is
located on the Apple River near the City
of Amery, Polk County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jason P.
Kreuscher, Vice President, Renewable
World Energies, LLC, 100 S State Street,
P.O. Box 264, Neshkoro, WI 54960;
(855) 994–93376 ext 102; or email at
jason@rwehydro.com.
i. FERC Contact: Michael Davis at
(202) 502–8339; or michael.davis@
ferc.gov.
j. Deadline for filing scoping
comments: September 13, 2019. The
Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
VerDate Sep<11>2014
20:49 Aug 19, 2019
Jkt 247001
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2894–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Project Description: Black Brook
Project consists of the following existing
facilities: (1) A 131-foot-long by 32-foothigh concrete gravity dam with three 12foot-high by 12-foot-wide radial gates, a
32.5-foot-wide by 23.6-foot-high
overflow section with a 6-inch
flashboard, a 315-foot-long by 12-footwide by 8.3-foot-high left embankment,
and a 75-foot-long by 38.5-foot-wide by
31.2-foot-high right embankment; (2) a
10-foot-long by 3.17-foot-wide by 15foot-high reinforced concrete intake
structure containing two 7-foot-wide by
12-foot-high steel dewatering gates and
two 65-degree inclined 16-foot-wide by
15-foot-high trash racks with a 1.5-inch
clear-bar spacing; (3) a cement block
powerhouse with two generating units
providing a total of 0.645 megawatt of
installed capacity; (4) a tailrace; (5) a
13.2-kilovolt (kV) substation facility; (6)
a 20-foot-long, 2,400-volt transmission
line and a 1.25-mile-long, 13.2-kV
transmission line; and (7) appurtenant
facilities. The project has a normal pool
elevation of 1045.47 feet National
Geodetic Vertical Datum 1988 with a
surface area of about 98 acres and no
usable storage capacity. The project
generates about 7,336 megawatt-hours
annually.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to address the document.
For assistance, contact FERC Online
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Support. A copy is available for
inspection and reproduction at the
address in Item H above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process: The Commission
staff intends to prepare a single
Environmental Assessment (EA) for the
project in accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
At this time, we do not anticipate
holding on-site public or agency scoping
meetings. Instead, we are soliciting your
comments and suggestions on the
preliminary list of issues and
alternatives to be addressed in the EA,
as described in scoping document 1
(SD1), issued August 14, 2019.
Copies of the SD1 outlining the
subject areas to be addressed in the EA
were distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, call 1–866–208–3676 or
for TTY, (202) 502–8659.
Dated: August 14, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17899 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP19–495–000; PF18–6–000]
Double E Pipeline, LLC; Notice of
Application
Take notice that on July 31, 2019,
Double E Pipeline, LLC (Double E), 1790
Hughes Landing Blvd., Suite 500, The
Woodlands, Texas 77380, filed in
Docket No. CP19–495–000 an
application, pursuant to section 7(c) of
the Natural Gas Act (NGA) and Parts
157 and 284 of the Commission’s
regulations, requesting a certificate of
public convenience and necessity to
construct, operate and maintain its
Double E Pipeline Project. Specifically,
Double E seeks authorization to
E:\FR\FM\20AUN1.SGM
20AUN1
Agencies
[Federal Register Volume 84, Number 161 (Tuesday, August 20, 2019)]
[Notices]
[Page 43118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17899]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2894-013]
Flambeau Hydro, LLC; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: P-2894-013.
c. Date filed: December 31, 2018.
d. Applicant: Flambeau Hydro, LLC.
e. Name of Project: Black Brook Hydroelectric Project.
f. Location: The existing project is located on the Apple River
near the City of Amery, Polk County, Wisconsin.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Jason P. Kreuscher, Vice President,
Renewable World Energies, LLC, 100 S State Street, P.O. Box 264,
Neshkoro, WI 54960; (855) 994-93376 ext 102; or email at
[email protected].
i. FERC Contact: Michael Davis at (202) 502-8339; or
[email protected].
j. Deadline for filing scoping comments: September 13, 2019. The
Commission strongly encourages electronic filing. Please file scoping
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-2894-013.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application is not ready for environmental analysis at this
time.
l. Project Description: Black Brook Project consists of the
following existing facilities: (1) A 131-foot-long by 32-foot-high
concrete gravity dam with three 12-foot-high by 12-foot-wide radial
gates, a 32.5-foot-wide by 23.6-foot-high overflow section with a 6-
inch flashboard, a 315-foot-long by 12-foot-wide by 8.3-foot-high left
embankment, and a 75-foot-long by 38.5-foot-wide by 31.2-foot-high
right embankment; (2) a 10-foot-long by 3.17-foot-wide by 15-foot-high
reinforced concrete intake structure containing two 7-foot-wide by 12-
foot-high steel dewatering gates and two 65-degree inclined 16-foot-
wide by 15-foot-high trash racks with a 1.5-inch clear-bar spacing; (3)
a cement block powerhouse with two generating units providing a total
of 0.645 megawatt of installed capacity; (4) a tailrace; (5) a 13.2-
kilovolt (kV) substation facility; (6) a 20-foot-long, 2,400-volt
transmission line and a 1.25-mile-long, 13.2-kV transmission line; and
(7) appurtenant facilities. The project has a normal pool elevation of
1045.47 feet National Geodetic Vertical Datum 1988 with a surface area
of about 98 acres and no usable storage capacity. The project generates
about 7,336 megawatt-hours annually.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to address the document. For assistance, contact FERC
Online Support. A copy is available for inspection and reproduction at
the address in Item H above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process: The Commission staff intends to prepare a
single Environmental Assessment (EA) for the project in accordance with
the National Environmental Policy Act. The EA will consider both site-
specific and cumulative environmental impacts and reasonable
alternatives to the proposed action.
At this time, we do not anticipate holding on-site public or agency
scoping meetings. Instead, we are soliciting your comments and
suggestions on the preliminary list of issues and alternatives to be
addressed in the EA, as described in scoping document 1 (SD1), issued
August 14, 2019.
Copies of the SD1 outlining the subject areas to be addressed in
the EA were distributed to the parties on the Commission's mailing list
and the applicant's distribution list. Copies of SD1 may be viewed on
the web at https://www.ferc.gov using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, call 1-866-208-3676 or
for TTY, (202) 502-8659.
Dated: August 14, 2019.
Kimberly D. Bose,
Secretary.