Combined Notice of Filings #1, 43116-43118 [2019-17850]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
43116
Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5080.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2604–000.
Applicants: Massachusetts Gas &
Electric, Inc.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5081.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2605–000.
Applicants: Public Power & Utility of
Maryland, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5083.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2606–000.
Applicants: Public Power & Utility of
NY, Inc.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5084.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2607–000.
Applicants: Public Power (PA), LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5085.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2608–000.
Applicants: Public Power, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5086.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2609–000.
Applicants: TriEagle Energy, LP.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5088.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2610–000.
Applicants: Viridian Energy NY, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5089.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2611–000.
Applicants: Viridian Energy PA, LLC.
VerDate Sep<11>2014
20:49 Aug 19, 2019
Jkt 247001
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5092.
Comments Due: 5 p.m. ET 9/4/19.
Docket Numbers: ER19–2612–000.
Applicants: Viridian Energy, LLC.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/15/
2019.
Filed Date: 8/14/19.
Accession Number: 20190814–5094.
Comments Due: 5 p.m. ET 9/4/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 14, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–17880 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2595–000]
SR Hazlehurst III, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced SR Hazlehurst III,
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 3,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 14, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–17881 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–114–000.
Applicants: Big Sky Wind, LLC,
Pattern Renewables 2 LP.
Description: Supplement to July 18,
2019 Application for Authorization
E:\FR\FM\20AUN1.SGM
20AUN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices
Under Section 203 of the Federal Power
Act, et al. of Big Sky Wind, LLC, et al.
Filed Date: 8/13/19.
Accession Number: 20190813–5048.
Comments Due: 5 p.m. ET 9/16/19.
Docket Numbers: EC19–119–000.
Applicants: Ashtabula Wind, LLC,
Ashtabula Wind I, LLC, FPL Energy
Hancock County Wind, LLC, Hancock
County Wind, LLC, Story Wind, LLC,
Story County Wind, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Ashtabula
Wind, LLC, et al.
Filed Date: 8/13/19.
Accession Number: 20190813–5086.
Comments Due: 5 p.m. ET 9/3/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2189–000.
Applicants: Palmetto Plains Solar
Project, LLC.
Description: Report Filing:
Supplemental Information to be
effective N/A.
Filed Date: 8/12/19.
Accession Number: 20190812–5192.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2575–001.
Applicants: Techren Solar I LLC.
Description: Tariff Amendment: Filing
of Amendments to Substation
Agreement and Gen-Tie Agreement to
be effective 8/13/2019.
Filed Date: 8/12/19.
Accession Number: 20190812–5195.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2579–000.
Applicants: Techren Solar II LLC.
Description: Baseline eTariff Filing:
Filing of Substation and Gen-Tie
Agreements and Certificate of
Concurrence to be effective 8/13/2019.
Filed Date: 8/12/19.
Accession Number: 20190812–5163.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2580–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Rayos Del Sol Solar Project GIA
1st Amd & Restated to be effective 7/23/
2019.
Filed Date: 8/12/19.
Accession Number: 20190812–5181.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2581–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX-Shakes Solar GIA 3rd Amd &
Restated to be effective 7/23/2019.
Filed Date: 8/12/19.
Accession Number: 20190812–5177.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2582–000.
Applicants: Pacific Gas and Electric
Company.
VerDate Sep<11>2014
20:49 Aug 19, 2019
Jkt 247001
Description: Application requesting
authorization to recover approximately
$9.2 million in project abandonment
costs of Pacific Gas and Electric
Company.
Filed Date: 8/12/19.
Accession Number: 20190812–5199.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2583–000.
Applicants: Green River Wind Farm
Phase 1, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 10/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5071.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2584–000.
Applicants: Crocker Wind Farm, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authority to be effective 10/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5082.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2585–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing:
Florida Power & Light Company’s 2019
Rate Case Filing to be effective 11/1/
2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5126.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2586–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: § 205(d) Rate Filing:
2019–08–13_SA 3339 MidAmericanContrail Wind Project E&P (J611) to be
effective 7/25/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5131.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2587–000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc.
submits Average System Cost Filing for
Sales of Electric Power to the Bonneville
Power Administration, FY 2020–2021.
Filed Date: 8/13/19.
Accession Number: 20190813–5142.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2588–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: Twin
Eagle—MBR—08.13.19 to be effective
7/1/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5143.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2589–000.
Applicants: Appalachian Power
Company, Indiana Michigan Power
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
43117
Company, Kentucky Power Company,
Kingsport Power Company, Ohio Power
Company, Wheeling Power Company,
AEP Appalachian Transmission
Company, Inc., AEP Indiana Michigan
Transmission Company, AEP Kentucky
Transmission Company, Inc., AEP Ohio
Transmission Company, Inc., AEP West
Virginia Transmission Company, Inc.,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
submits revisions to OATT, Att H–14B
and H–20B re: WV Depreciation Rate
Upda to be effective 3/6/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5146.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2590–000.
Applicants: Marco DM Holdings,
L.L.C.
Description: § 205(d) Rate Filing:
Change in Seller Category to be effective
8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5160.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2591–000.
Applicants: Plum Point Energy
Associates, LLC.
Description: § 205(d) Rate Filing:
Change in Seller Category to be effective
8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5161.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2592–000.
Applicants: Plum Point Services
Company, LLC.
Description: § 205(d) Rate Filing:
Change in Seller Category to be effective
8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5162.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2593–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
Second Revised FERC Rate Schedule
No. 193 to be effective 6/26/2019.
Filed Date: 8/13/19.
Accession Number: 20190813–5182.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19–2594–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of 13 Service
Agreements re: Deactivations and
Withdrawal to be effective 1/5/2016.
Filed Date: 8/13/19.
Accession Number: 20190813–5207.
Comments Due: 5 p.m. ET 9/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
E:\FR\FM\20AUN1.SGM
20AUN1
43118
Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–17850 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2894–013]
jbell on DSK3GLQ082PROD with NOTICES
Flambeau Hydro, LLC; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: P–2894–013.
c. Date filed: December 31, 2018.
d. Applicant: Flambeau Hydro, LLC.
e. Name of Project: Black Brook
Hydroelectric Project.
f. Location: The existing project is
located on the Apple River near the City
of Amery, Polk County, Wisconsin.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jason P.
Kreuscher, Vice President, Renewable
World Energies, LLC, 100 S State Street,
P.O. Box 264, Neshkoro, WI 54960;
(855) 994–93376 ext 102; or email at
jason@rwehydro.com.
i. FERC Contact: Michael Davis at
(202) 502–8339; or michael.davis@
ferc.gov.
j. Deadline for filing scoping
comments: September 13, 2019. The
Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
VerDate Sep<11>2014
20:49 Aug 19, 2019
Jkt 247001
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2894–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Project Description: Black Brook
Project consists of the following existing
facilities: (1) A 131-foot-long by 32-foothigh concrete gravity dam with three 12foot-high by 12-foot-wide radial gates, a
32.5-foot-wide by 23.6-foot-high
overflow section with a 6-inch
flashboard, a 315-foot-long by 12-footwide by 8.3-foot-high left embankment,
and a 75-foot-long by 38.5-foot-wide by
31.2-foot-high right embankment; (2) a
10-foot-long by 3.17-foot-wide by 15foot-high reinforced concrete intake
structure containing two 7-foot-wide by
12-foot-high steel dewatering gates and
two 65-degree inclined 16-foot-wide by
15-foot-high trash racks with a 1.5-inch
clear-bar spacing; (3) a cement block
powerhouse with two generating units
providing a total of 0.645 megawatt of
installed capacity; (4) a tailrace; (5) a
13.2-kilovolt (kV) substation facility; (6)
a 20-foot-long, 2,400-volt transmission
line and a 1.25-mile-long, 13.2-kV
transmission line; and (7) appurtenant
facilities. The project has a normal pool
elevation of 1045.47 feet National
Geodetic Vertical Datum 1988 with a
surface area of about 98 acres and no
usable storage capacity. The project
generates about 7,336 megawatt-hours
annually.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to address the document.
For assistance, contact FERC Online
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Support. A copy is available for
inspection and reproduction at the
address in Item H above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process: The Commission
staff intends to prepare a single
Environmental Assessment (EA) for the
project in accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
At this time, we do not anticipate
holding on-site public or agency scoping
meetings. Instead, we are soliciting your
comments and suggestions on the
preliminary list of issues and
alternatives to be addressed in the EA,
as described in scoping document 1
(SD1), issued August 14, 2019.
Copies of the SD1 outlining the
subject areas to be addressed in the EA
were distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, call 1–866–208–3676 or
for TTY, (202) 502–8659.
Dated: August 14, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17899 Filed 8–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP19–495–000; PF18–6–000]
Double E Pipeline, LLC; Notice of
Application
Take notice that on July 31, 2019,
Double E Pipeline, LLC (Double E), 1790
Hughes Landing Blvd., Suite 500, The
Woodlands, Texas 77380, filed in
Docket No. CP19–495–000 an
application, pursuant to section 7(c) of
the Natural Gas Act (NGA) and Parts
157 and 284 of the Commission’s
regulations, requesting a certificate of
public convenience and necessity to
construct, operate and maintain its
Double E Pipeline Project. Specifically,
Double E seeks authorization to
E:\FR\FM\20AUN1.SGM
20AUN1
Agencies
[Federal Register Volume 84, Number 161 (Tuesday, August 20, 2019)]
[Notices]
[Pages 43116-43118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17850]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-114-000.
Applicants: Big Sky Wind, LLC, Pattern Renewables 2 LP.
Description: Supplement to July 18, 2019 Application for
Authorization
[[Page 43117]]
Under Section 203 of the Federal Power Act, et al. of Big Sky Wind,
LLC, et al.
Filed Date: 8/13/19.
Accession Number: 20190813-5048.
Comments Due: 5 p.m. ET 9/16/19.
Docket Numbers: EC19-119-000.
Applicants: Ashtabula Wind, LLC, Ashtabula Wind I, LLC, FPL Energy
Hancock County Wind, LLC, Hancock County Wind, LLC, Story Wind, LLC,
Story County Wind, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Ashtabula Wind, LLC, et al.
Filed Date: 8/13/19.
Accession Number: 20190813-5086.
Comments Due: 5 p.m. ET 9/3/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-2189-000.
Applicants: Palmetto Plains Solar Project, LLC.
Description: Report Filing: Supplemental Information to be
effective N/A.
Filed Date: 8/12/19.
Accession Number: 20190812-5192.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2575-001.
Applicants: Techren Solar I LLC.
Description: Tariff Amendment: Filing of Amendments to Substation
Agreement and Gen-Tie Agreement to be effective 8/13/2019.
Filed Date: 8/12/19.
Accession Number: 20190812-5195.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2579-000.
Applicants: Techren Solar II LLC.
Description: Baseline eTariff Filing: Filing of Substation and Gen-
Tie Agreements and Certificate of Concurrence to be effective 8/13/
2019.
Filed Date: 8/12/19.
Accession Number: 20190812-5163.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2580-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Rayos Del Sol Solar
Project GIA 1st Amd & Restated to be effective 7/23/2019.
Filed Date: 8/12/19.
Accession Number: 20190812-5181.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2581-000.
Applicants: AEP Texas Inc.
Description: Sec. 205(d) Rate Filing: AEPTX-Shakes Solar GIA 3rd
Amd & Restated to be effective 7/23/2019.
Filed Date: 8/12/19.
Accession Number: 20190812-5177.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2582-000.
Applicants: Pacific Gas and Electric Company.
Description: Application requesting authorization to recover
approximately $9.2 million in project abandonment costs of Pacific Gas
and Electric Company.
Filed Date: 8/12/19.
Accession Number: 20190812-5199.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2583-000.
Applicants: Green River Wind Farm Phase 1, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authority to be effective 10/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5071.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2584-000.
Applicants: Crocker Wind Farm, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authority to be effective 10/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5082.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2585-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: Florida Power & Light
Company's 2019 Rate Case Filing to be effective 11/1/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5126.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2586-000.
Applicants: Midcontinent Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: Sec. 205(d) Rate Filing: 2019-08-13_SA 3339
MidAmerican-Contrail Wind Project E&P (J611) to be effective 7/25/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5131.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2587-000.
Applicants: Puget Sound Energy, Inc.
Description: Puget Sound Energy, Inc. submits Average System Cost
Filing for Sales of Electric Power to the Bonneville Power
Administration, FY 2020-2021.
Filed Date: 8/13/19.
Accession Number: 20190813-5142.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2588-000.
Applicants: Public Service Company of Colorado.
Description: Compliance filing: Twin Eagle--MBR--08.13.19 to be
effective 7/1/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5143.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2589-000.
Applicants: Appalachian Power Company, Indiana Michigan Power
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power
Company, Wheeling Power Company, AEP Appalachian Transmission Company,
Inc., AEP Indiana Michigan Transmission Company, AEP Kentucky
Transmission Company, Inc., AEP Ohio Transmission Company, Inc., AEP
West Virginia Transmission Company, Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: AEP submits revisions to
OATT, Att H-14B and H-20B re: WV Depreciation Rate Upda to be effective
3/6/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5146.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2590-000.
Applicants: Marco DM Holdings, L.L.C.
Description: Sec. 205(d) Rate Filing: Change in Seller Category to
be effective 8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5160.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2591-000.
Applicants: Plum Point Energy Associates, LLC.
Description: Sec. 205(d) Rate Filing: Change in Seller Category to
be effective 8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5161.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2592-000.
Applicants: Plum Point Services Company, LLC.
Description: Sec. 205(d) Rate Filing: Change in Seller Category to
be effective 8/14/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5162.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2593-000.
Applicants: Florida Power & Light Company.
Description: Sec. 205(d) Rate Filing: FPL Second Revised FERC Rate
Schedule No. 193 to be effective 6/26/2019.
Filed Date: 8/13/19.
Accession Number: 20190813-5182.
Comments Due: 5 p.m. ET 9/3/19.
Docket Numbers: ER19-2594-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellation of 13
Service Agreements re: Deactivations and Withdrawal to be effective 1/
5/2016.
Filed Date: 8/13/19.
Accession Number: 20190813-5207.
Comments Due: 5 p.m. ET 9/3/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
[[Page 43118]]
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-17850 Filed 8-19-19; 8:45 am]
BILLING CODE 6717-01-P