Combined Notice of Filings #1, 43116-43118 [2019-17850]

Download as PDF jbell on DSK3GLQ082PROD with NOTICES 43116 Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5080. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2604–000. Applicants: Massachusetts Gas & Electric, Inc. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5081. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2605–000. Applicants: Public Power & Utility of Maryland, LLC. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5083. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2606–000. Applicants: Public Power & Utility of NY, Inc. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5084. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2607–000. Applicants: Public Power (PA), LLC. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5085. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2608–000. Applicants: Public Power, LLC. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5086. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2609–000. Applicants: TriEagle Energy, LP. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5088. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2610–000. Applicants: Viridian Energy NY, LLC. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5089. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2611–000. Applicants: Viridian Energy PA, LLC. VerDate Sep<11>2014 20:49 Aug 19, 2019 Jkt 247001 Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5092. Comments Due: 5 p.m. ET 9/4/19. Docket Numbers: ER19–2612–000. Applicants: Viridian Energy, LLC. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/15/ 2019. Filed Date: 8/14/19. Accession Number: 20190814–5094. Comments Due: 5 p.m. ET 9/4/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 14, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–17880 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2595–000] SR Hazlehurst III, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced SR Hazlehurst III, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 3, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 14, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–17881 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–114–000. Applicants: Big Sky Wind, LLC, Pattern Renewables 2 LP. Description: Supplement to July 18, 2019 Application for Authorization E:\FR\FM\20AUN1.SGM 20AUN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices Under Section 203 of the Federal Power Act, et al. of Big Sky Wind, LLC, et al. Filed Date: 8/13/19. Accession Number: 20190813–5048. Comments Due: 5 p.m. ET 9/16/19. Docket Numbers: EC19–119–000. Applicants: Ashtabula Wind, LLC, Ashtabula Wind I, LLC, FPL Energy Hancock County Wind, LLC, Hancock County Wind, LLC, Story Wind, LLC, Story County Wind, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act, et al. of Ashtabula Wind, LLC, et al. Filed Date: 8/13/19. Accession Number: 20190813–5086. Comments Due: 5 p.m. ET 9/3/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–2189–000. Applicants: Palmetto Plains Solar Project, LLC. Description: Report Filing: Supplemental Information to be effective N/A. Filed Date: 8/12/19. Accession Number: 20190812–5192. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2575–001. Applicants: Techren Solar I LLC. Description: Tariff Amendment: Filing of Amendments to Substation Agreement and Gen-Tie Agreement to be effective 8/13/2019. Filed Date: 8/12/19. Accession Number: 20190812–5195. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2579–000. Applicants: Techren Solar II LLC. Description: Baseline eTariff Filing: Filing of Substation and Gen-Tie Agreements and Certificate of Concurrence to be effective 8/13/2019. Filed Date: 8/12/19. Accession Number: 20190812–5163. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2580–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Rayos Del Sol Solar Project GIA 1st Amd & Restated to be effective 7/23/ 2019. Filed Date: 8/12/19. Accession Number: 20190812–5181. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2581–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX-Shakes Solar GIA 3rd Amd & Restated to be effective 7/23/2019. Filed Date: 8/12/19. Accession Number: 20190812–5177. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2582–000. Applicants: Pacific Gas and Electric Company. VerDate Sep<11>2014 20:49 Aug 19, 2019 Jkt 247001 Description: Application requesting authorization to recover approximately $9.2 million in project abandonment costs of Pacific Gas and Electric Company. Filed Date: 8/12/19. Accession Number: 20190812–5199. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2583–000. Applicants: Green River Wind Farm Phase 1, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authority to be effective 10/14/2019. Filed Date: 8/13/19. Accession Number: 20190813–5071. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2584–000. Applicants: Crocker Wind Farm, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Authority to be effective 10/14/2019. Filed Date: 8/13/19. Accession Number: 20190813–5082. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2585–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: Florida Power & Light Company’s 2019 Rate Case Filing to be effective 11/1/ 2019. Filed Date: 8/13/19. Accession Number: 20190813–5126. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2586–000. Applicants: Midcontinent Independent System Operator, Inc., MidAmerican Energy Company. Description: § 205(d) Rate Filing: 2019–08–13_SA 3339 MidAmericanContrail Wind Project E&P (J611) to be effective 7/25/2019. Filed Date: 8/13/19. Accession Number: 20190813–5131. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2587–000. Applicants: Puget Sound Energy, Inc. Description: Puget Sound Energy, Inc. submits Average System Cost Filing for Sales of Electric Power to the Bonneville Power Administration, FY 2020–2021. Filed Date: 8/13/19. Accession Number: 20190813–5142. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2588–000. Applicants: Public Service Company of Colorado. Description: Compliance filing: Twin Eagle—MBR—08.13.19 to be effective 7/1/2019. Filed Date: 8/13/19. Accession Number: 20190813–5143. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2589–000. Applicants: Appalachian Power Company, Indiana Michigan Power PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 43117 Company, Kentucky Power Company, Kingsport Power Company, Ohio Power Company, Wheeling Power Company, AEP Appalachian Transmission Company, Inc., AEP Indiana Michigan Transmission Company, AEP Kentucky Transmission Company, Inc., AEP Ohio Transmission Company, Inc., AEP West Virginia Transmission Company, Inc., PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: AEP submits revisions to OATT, Att H–14B and H–20B re: WV Depreciation Rate Upda to be effective 3/6/2019. Filed Date: 8/13/19. Accession Number: 20190813–5146. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2590–000. Applicants: Marco DM Holdings, L.L.C. Description: § 205(d) Rate Filing: Change in Seller Category to be effective 8/14/2019. Filed Date: 8/13/19. Accession Number: 20190813–5160. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2591–000. Applicants: Plum Point Energy Associates, LLC. Description: § 205(d) Rate Filing: Change in Seller Category to be effective 8/14/2019. Filed Date: 8/13/19. Accession Number: 20190813–5161. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2592–000. Applicants: Plum Point Services Company, LLC. Description: § 205(d) Rate Filing: Change in Seller Category to be effective 8/14/2019. Filed Date: 8/13/19. Accession Number: 20190813–5162. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2593–000. Applicants: Florida Power & Light Company. Description: § 205(d) Rate Filing: FPL Second Revised FERC Rate Schedule No. 193 to be effective 6/26/2019. Filed Date: 8/13/19. Accession Number: 20190813–5182. Comments Due: 5 p.m. ET 9/3/19. Docket Numbers: ER19–2594–000. Applicants: PJM Interconnection, L.L.C. Description: Tariff Cancellation: Notice of Cancellation of 13 Service Agreements re: Deactivations and Withdrawal to be effective 1/5/2016. Filed Date: 8/13/19. Accession Number: 20190813–5207. Comments Due: 5 p.m. ET 9/3/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. E:\FR\FM\20AUN1.SGM 20AUN1 43118 Federal Register / Vol. 84, No. 161 / Tuesday, August 20, 2019 / Notices Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 13, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–17850 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2894–013] jbell on DSK3GLQ082PROD with NOTICES Flambeau Hydro, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License. b. Project No.: P–2894–013. c. Date filed: December 31, 2018. d. Applicant: Flambeau Hydro, LLC. e. Name of Project: Black Brook Hydroelectric Project. f. Location: The existing project is located on the Apple River near the City of Amery, Polk County, Wisconsin. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Jason P. Kreuscher, Vice President, Renewable World Energies, LLC, 100 S State Street, P.O. Box 264, Neshkoro, WI 54960; (855) 994–93376 ext 102; or email at jason@rwehydro.com. i. FERC Contact: Michael Davis at (202) 502–8339; or michael.davis@ ferc.gov. j. Deadline for filing scoping comments: September 13, 2019. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, VerDate Sep<11>2014 20:49 Aug 19, 2019 Jkt 247001 using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2894–013. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application is not ready for environmental analysis at this time. l. Project Description: Black Brook Project consists of the following existing facilities: (1) A 131-foot-long by 32-foothigh concrete gravity dam with three 12foot-high by 12-foot-wide radial gates, a 32.5-foot-wide by 23.6-foot-high overflow section with a 6-inch flashboard, a 315-foot-long by 12-footwide by 8.3-foot-high left embankment, and a 75-foot-long by 38.5-foot-wide by 31.2-foot-high right embankment; (2) a 10-foot-long by 3.17-foot-wide by 15foot-high reinforced concrete intake structure containing two 7-foot-wide by 12-foot-high steel dewatering gates and two 65-degree inclined 16-foot-wide by 15-foot-high trash racks with a 1.5-inch clear-bar spacing; (3) a cement block powerhouse with two generating units providing a total of 0.645 megawatt of installed capacity; (4) a tailrace; (5) a 13.2-kilovolt (kV) substation facility; (6) a 20-foot-long, 2,400-volt transmission line and a 1.25-mile-long, 13.2-kV transmission line; and (7) appurtenant facilities. The project has a normal pool elevation of 1045.47 feet National Geodetic Vertical Datum 1988 with a surface area of about 98 acres and no usable storage capacity. The project generates about 7,336 megawatt-hours annually. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to address the document. For assistance, contact FERC Online PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Support. A copy is available for inspection and reproduction at the address in Item H above. n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process: The Commission staff intends to prepare a single Environmental Assessment (EA) for the project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed action. At this time, we do not anticipate holding on-site public or agency scoping meetings. Instead, we are soliciting your comments and suggestions on the preliminary list of issues and alternatives to be addressed in the EA, as described in scoping document 1 (SD1), issued August 14, 2019. Copies of the SD1 outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of SD1 may be viewed on the web at https://www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866–208–3676 or for TTY, (202) 502–8659. Dated: August 14, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17899 Filed 8–19–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP19–495–000; PF18–6–000] Double E Pipeline, LLC; Notice of Application Take notice that on July 31, 2019, Double E Pipeline, LLC (Double E), 1790 Hughes Landing Blvd., Suite 500, The Woodlands, Texas 77380, filed in Docket No. CP19–495–000 an application, pursuant to section 7(c) of the Natural Gas Act (NGA) and Parts 157 and 284 of the Commission’s regulations, requesting a certificate of public convenience and necessity to construct, operate and maintain its Double E Pipeline Project. Specifically, Double E seeks authorization to E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 84, Number 161 (Tuesday, August 20, 2019)]
[Notices]
[Pages 43116-43118]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17850]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC19-114-000.
    Applicants: Big Sky Wind, LLC, Pattern Renewables 2 LP.
    Description: Supplement to July 18, 2019 Application for 
Authorization

[[Page 43117]]

Under Section 203 of the Federal Power Act, et al. of Big Sky Wind, 
LLC, et al.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5048.
    Comments Due: 5 p.m. ET 9/16/19.

    Docket Numbers: EC19-119-000.
    Applicants: Ashtabula Wind, LLC, Ashtabula Wind I, LLC, FPL Energy 
Hancock County Wind, LLC, Hancock County Wind, LLC, Story Wind, LLC, 
Story County Wind, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act, et al. of Ashtabula Wind, LLC, et al.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5086.
    Comments Due: 5 p.m. ET 9/3/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER19-2189-000.
    Applicants: Palmetto Plains Solar Project, LLC.
    Description: Report Filing: Supplemental Information to be 
effective N/A.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5192.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2575-001.
    Applicants: Techren Solar I LLC.
    Description: Tariff Amendment: Filing of Amendments to Substation 
Agreement and Gen-Tie Agreement to be effective 8/13/2019.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5195.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2579-000.
    Applicants: Techren Solar II LLC.
    Description: Baseline eTariff Filing: Filing of Substation and Gen-
Tie Agreements and Certificate of Concurrence to be effective 8/13/
2019.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5163.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2580-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Rayos Del Sol Solar 
Project GIA 1st Amd & Restated to be effective 7/23/2019.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5181.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2581-000.
    Applicants: AEP Texas Inc.
    Description: Sec.  205(d) Rate Filing: AEPTX-Shakes Solar GIA 3rd 
Amd & Restated to be effective 7/23/2019.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5177.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2582-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Application requesting authorization to recover 
approximately $9.2 million in project abandonment costs of Pacific Gas 
and Electric Company.
    Filed Date: 8/12/19.
    Accession Number: 20190812-5199.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2583-000.
    Applicants: Green River Wind Farm Phase 1, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authority to be effective 10/14/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5071.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2584-000.
    Applicants: Crocker Wind Farm, LLC.
    Description: Baseline eTariff Filing: Application for Market-Based 
Rate Authority to be effective 10/14/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5082.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2585-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: Florida Power & Light 
Company's 2019 Rate Case Filing to be effective 11/1/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5126.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2586-000.
    Applicants: Midcontinent Independent System Operator, Inc., 
MidAmerican Energy Company.
    Description: Sec.  205(d) Rate Filing: 2019-08-13_SA 3339 
MidAmerican-Contrail Wind Project E&P (J611) to be effective 7/25/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5131.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2587-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Puget Sound Energy, Inc. submits Average System Cost 
Filing for Sales of Electric Power to the Bonneville Power 
Administration, FY 2020-2021.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5142.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2588-000.
    Applicants: Public Service Company of Colorado.
    Description: Compliance filing: Twin Eagle--MBR--08.13.19 to be 
effective 7/1/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5143.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2589-000.
    Applicants: Appalachian Power Company, Indiana Michigan Power 
Company, Kentucky Power Company, Kingsport Power Company, Ohio Power 
Company, Wheeling Power Company, AEP Appalachian Transmission Company, 
Inc., AEP Indiana Michigan Transmission Company, AEP Kentucky 
Transmission Company, Inc., AEP Ohio Transmission Company, Inc., AEP 
West Virginia Transmission Company, Inc., PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: AEP submits revisions to 
OATT, Att H-14B and H-20B re: WV Depreciation Rate Upda to be effective 
3/6/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5146.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2590-000.
    Applicants: Marco DM Holdings, L.L.C.
    Description: Sec.  205(d) Rate Filing: Change in Seller Category to 
be effective 8/14/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5160.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2591-000.
    Applicants: Plum Point Energy Associates, LLC.
    Description: Sec.  205(d) Rate Filing: Change in Seller Category to 
be effective 8/14/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5161.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2592-000.
    Applicants: Plum Point Services Company, LLC.
    Description: Sec.  205(d) Rate Filing: Change in Seller Category to 
be effective 8/14/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5162.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2593-000.
    Applicants: Florida Power & Light Company.
    Description: Sec.  205(d) Rate Filing: FPL Second Revised FERC Rate 
Schedule No. 193 to be effective 6/26/2019.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5182.
    Comments Due: 5 p.m. ET 9/3/19.

    Docket Numbers: ER19-2594-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Cancellation: Notice of Cancellation of 13 
Service Agreements re: Deactivations and Withdrawal to be effective 1/
5/2016.
    Filed Date: 8/13/19.
    Accession Number: 20190813-5207.
    Comments Due: 5 p.m. ET 9/3/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.

[[Page 43118]]

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 13, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-17850 Filed 8-19-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.