Notice of Effectiveness of Exempt Wholesale Generator Status, 42908-42909 [2019-17728]
Download as PDF
42908
Federal Register / Vol. 84, No. 160 / Monday, August 19, 2019 / Notices
Power Act,1 Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2018),
Order No. 679,2 and the Commission’s
November 15, 2012 policy statement on
transmission incentives,3 the New York
Power Authority (NYPA or Petitioner),
filed a petition for declaratory order
seeking incentive rate treatments for
NYPA’s investment in competitively
selected New York Independent System
Operator, Inc. transmission projects
needed to relieve severe and chronic
congestion between upstate and
downstate New York (AC Transmission
Needs Projects or AC Projects), as more
fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
1 16
U.S.C. 824s (2012).
Transmission Investment through
Pricing Reform, Order No. 679, 71 FR 43,294 (July
31, 2006) FERC Stats. & Regs. 31,222 (2006) (Order
No. 679), order on reh’g, Order No. 679–A, 72 FR
1152 (Jan. 10, 2007), FERC Stats & Regs. 31,236
(2006) (‘‘Order No. 679–A’’), reh’g denied, 119
FERC ¶ 61,062 (2007).
3 Promoting Transmission Investment through
Pricing Reform, 141 FERC ¶ 61,129 (2012)
(Incentives Policy Statement).
jspears on DSK3GMQ082PROD with NOTICES
2 Promoting
VerDate Sep<11>2014
16:29 Aug 16, 2019
Jkt 247001
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Dated: August 13, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17730 Filed 8–16–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RC11–6–009]
North American Electric Reliability
Corporation; Notice of Staff Review of
Enforcement Programs
Commission staff coordinated with
the staff of the North American Electric
Reliability Corporation (NERC) to
conduct the annual oversight of the
Find, Fix, Track and Report (FFT)
program, as outlined in the March 15,
2012 Order,1 and the Compliance
Exception (CE) Program, as proposed by
NERC’s September 18, 2015 annual
Compliance Filing.2 The Commission
supported NERC’s plan to coordinate
with Commission staff to review the
same sample of possible violations,
thereby reducing the burden on the
Regional Entities of providing evidence
for two different samples. Furthermore,
NERC and Commission staff agreed to
exclude the Florida Reliability
Coordinating Council Regional Entity
(FRCC) from the survey, reducing the
burden on FRCC as it focuses efforts on
a planned and approved termination of
its responsibilities as a Regional Entity.
Commission staff reviewed a sample of
27 FFT possible violations out of 47 FFT
possible violations posted by NERC
between October 2017 and September
2018 and a sample of 37 CE instances
of noncompliance out of 898 CE
instances of noncompliance posted by
NERC between October 2017 and
September 2018.
Commission staff believes that the
FFT and CE programs are meeting
expectations, with limited exceptions.
Sampling for the 2018 program year
indicated that the Regional Entities
appropriately included 63 of the 64
sampled possible violations in the FFT
and CE programs, with only one
exception, and that 62 of the 64 sampled
FFTs and CEs have been adequately
remediated, with the remaining two
FFTs to be adequately remediated once
the ongoing mitigation is completed in
the coming months. Commission staff’s
sample analysis indicated a decreasing
number of documentation concerns,
particularly with regard to the clear
identification of root cause in the FFT
and/or CE postings. Specifically, the
identification of root cause in FFTs and
CEs has improved significantly over the
past five years, moving from 38 percent
missing an identification of root cause
to all now being included in this year’s
sampling. Commission staff
subsequently reviewed the supporting
information for these FFTs or CEs and
agreed with the final risk
determinations for 62 of 64 samples.
Commission staff also noted a
significant improvement in the clear
identification of factors affecting the risk
prior to mitigation (such as potential
and actual risk), and actual harm, which
was identified in all samples. In
addition, Commission staff noted that
the FFTs and CEs sampled did not
contain any material misrepresentations
by the registered entities.
Dated: August 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17723 Filed 8–16–19; 8:45 am]
1 North
American Electric Reliability Corp., 138
FERC 61,193, at P 73 (2012) (discussing
Commission plans to survey a random sample of
FFTs submitted each year to gather information on
how the FFT program is working).
2 North American Electric Reliability Corp.,
Docket No. RC11–6–004, at 1 (Nov. 13, 2015)
(delegated letter order) (stating NERC’s intention to
combine the evaluation of Compliance Exceptions
with the annual sampling of FFTs to further
streamline oversight of the FFT and compliance
exception programs).
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
E:\FR\FM\19AUN1.SGM
19AUN1
Federal Register / Vol. 84, No. 160 / Monday, August 19, 2019 / Notices
Glen Ullin Energy Center, LLC .....................................................................................................................................
Wildhorse Wind Energy, LLC .......................................................................................................................................
Blossburg Power, LLC ...................................................................................................................................................
GenOn Holdco 1, LLC ...................................................................................................................................................
GenOn Holdco 2, LLC ...................................................................................................................................................
GenOn Holdco 3, LLC ...................................................................................................................................................
GenOn Holdco 4, LLC ...................................................................................................................................................
GenOn Holdco 5, LLC ...................................................................................................................................................
GenOn Holdco 6, LLC ...................................................................................................................................................
GenOn Holdco 7, LLC ...................................................................................................................................................
GenOn Holdco 8, LLC ...................................................................................................................................................
Hamilton Power, LLC ....................................................................................................................................................
Hunterstown Power, LLC ..............................................................................................................................................
Niles Power, LLC ...........................................................................................................................................................
Orrtanna Power, LLC .....................................................................................................................................................
Shawnee Power, LLC .....................................................................................................................................................
Titus Power, LLC ...........................................................................................................................................................
Tolna Power, LLC ..........................................................................................................................................................
Sage Draw Wind, LLC ...................................................................................................................................................
231RC 8me LLC .............................................................................................................................................................
Canadian Breaks LLC ....................................................................................................................................................
RE Gaskell West 2 LLC ..................................................................................................................................................
Turquoise Nevada LLC ..................................................................................................................................................
Take notice that during the month of
July 2, 2019, the status of the abovecaptioned entities as Exempt Wholesale
Generators Companies became effective
by operation of the Commission’s
regulations. 18 CFR 366.7(a) (2018).
Dated: August 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17728 Filed 8–16–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
jspears on DSK3GMQ082PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP19–1064–002.
Applicants: Stingray Pipeline
Company, L.L.C.
Description: Compliance filing
Stingray Second Order No. 587–Y
Compliance Filing to be effective 8/1/
2019.
Filed Date: 8/8/19.
Accession Number: 20190808–5028.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: RP19–1463–000.
Applicants: Big Sandy Pipeline, LLC,
Bobcat Gas Storage, East Tennessee
Natural Gas, LLC, Egan Hub Storage,
LLC, Garden Banks Gas Pipeline,
LLC,Maritimes & Northeast Pipeline,
L.L.C., Moss Bluff Hub, LLC,
Mississippi Canyon Gas Pipeline, L.L.C.,
Ozark Gas Transmission, L.L.C., NEXUS
Gas Transmission, LLC, Sabal Trail
Transmission, LLC, Saltville Gas Storage
VerDate Sep<11>2014
16:29 Aug 16, 2019
Jkt 247001
Company L.L.C.,Southeast Supply
Header, LLC, Steckman Ridge, LP, Texas
Eastern Transmission, LP, Nautilus
Pipeline Company, L.L.C., Algonquin
Gas Transmission, LLC.
Description: Compliance filing
Enbridge (U.S.) Pipelines Request for
Waivers—LINK System Maintenance.
Filed Date: 8/8/19.
Accession Number: 20190808–5044.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: RP19–1464–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt (Entergy
48769) to be effective 6/1/2019.
Filed Date: 8/8/19.
Accession Number: 20190808–5076.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: RP19–846–002.
Applicants: Black Hills Shoshone
Pipeline, LLC.
Description: Compliance filing
NAESB Compliance Filing—Order No.
587–Y to be effective 4/1/2019.
Filed Date: 8/8/19.
Accession Number: 20190808–5130.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: RP19–1465–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—NSTAR releases to BP
to be effective 8/9/2019.
Filed Date: 8/9/19.
Accession Number: 20190809–5030.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–884–001.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: Compliance filing RP19–
884–000 Order 587–Y Compliance
Filing to be effective 8/1/2019.
Filed Date: 8/9/19.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
42909
EG19–95–000
EG19–96–000
EG19–97–000
EG19–98–000
EG19–99–000
EG19–100–000
EG19–101–000
EG19–102–000
EG19–103–000
EG19–104–000
EG19–105–000
EG19–106–000
EG19–107–000
EG19–108–000
EG19–109–000
EG19–110–000
EG19–111–000
EG19–112–000
EG19–113–000
EG19–114–000
EG19–115–000
EG19–116–000
EG19–117–000
Accession Number: 20190809–5046.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–904–001.
Applicants: Freebird Gas Storage,
L.L.C.
Description: Compliance filing
Revised FERC Order No. 587–Y
Compliance Filing to be effective 8/1/
2019.
Filed Date: 8/9/19.
Accession Number: 20190809–5125.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–906–001.
Applicants: Caledonia Energy
Partners, L.L.C.
Description: Compliance filing
Revised FERC Order 587–Y Compliance
Filing to be effective 8/1/2019.
Filed Date: 8/9/19.
Accession Number: 20190809–5123.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–907–001.
Applicants: East Cheyenne Gas
Storage, LLC.
Description: Compliance filing
Revised FERC Order No. 587–Y
Compliance Filing to be effective 8/1/
2019.
Filed Date: 8/9/19.
Accession Number: 20190809–5124.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–926–001.
Applicants: Rendezvous Pipeline
Company, LLC.
Description: Compliance filing
Revised NAESB Compliance Filing—
Order No. 587–Y to be effective 8/1/
2019.
Filed Date: 8/9/19.
Accession Number: 20190809–5108.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: RP19–929–001.
Applicants: TransColorado Gas
Transmission Company LLC.
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 84, Number 160 (Monday, August 19, 2019)]
[Notices]
[Pages 42908-42909]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17728]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
[[Page 42909]]
Glen Ullin Energy Center, LLC.... EG19-95-000
Wildhorse Wind Energy, LLC....... EG19-96-000
Blossburg Power, LLC............. EG19-97-000
GenOn Holdco 1, LLC.............. EG19-98-000
GenOn Holdco 2, LLC.............. EG19-99-000
GenOn Holdco 3, LLC.............. EG19-100-000
GenOn Holdco 4, LLC.............. EG19-101-000
GenOn Holdco 5, LLC.............. EG19-102-000
GenOn Holdco 6, LLC.............. EG19-103-000
GenOn Holdco 7, LLC.............. EG19-104-000
GenOn Holdco 8, LLC.............. EG19-105-000
Hamilton Power, LLC.............. EG19-106-000
Hunterstown Power, LLC........... EG19-107-000
Niles Power, LLC................. EG19-108-000
Orrtanna Power, LLC.............. EG19-109-000
Shawnee Power, LLC............... EG19-110-000
Titus Power, LLC................. EG19-111-000
Tolna Power, LLC................. EG19-112-000
Sage Draw Wind, LLC.............. EG19-113-000
231RC 8me LLC.................... EG19-114-000
Canadian Breaks LLC.............. EG19-115-000
RE Gaskell West 2 LLC............ EG19-116-000
Turquoise Nevada LLC............. EG19-117-000
Take notice that during the month of July 2, 2019, the status of
the above-captioned entities as Exempt Wholesale Generators Companies
became effective by operation of the Commission's regulations. 18 CFR
366.7(a) (2018).
Dated: August 12, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17728 Filed 8-16-19; 8:45 am]
BILLING CODE 6717-01-P