Endangered and Threatened Wildlife and Plants; 28 Draft Recovery Plan Revisions for 53 Species in the Southeast, Mountain-Prairie, and Pacific Southwest Regions of the United States, 40039-40040 [C1-2019-16749]
Download as PDF
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
at DataClearance@FERC.gov, telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725J (Definition of the
Bulk Electric System).
OMB Control No.: 1902–0259.
Type of Request: Three-year extension
of the FERC–725J with no changes to the
current reporting requirements.
Abstract: On December 20, 2012, the
Commission issued Order No. 773, a
Final Rule approving NERC’s
modifications to the definition of bulk
electric system and the Rules of
Procedure exception process to be
effective July 1, 2013. On April 18,
2013, in Order No. 773–A, the
Commission largely affirmed its
findings in Order No. 773. In Order Nos.
773 and 773–A, the Commission
directed NERC to modify the definition
of bulk electric system in two respects:
(1) Modify the local network exclusion
(exclusion E3) to remove the 100 kV
minimum operating voltage to allow
systems that include one or more looped
configurations connected below 100 kV
40039
to be eligible for the local network
exclusion; and (2) modify the exclusions
to ensure that generator interconnection
facilities at or above 100 kV connected
to bulk electric system generators
identified in inclusion I2 are not
excluded from the bulk electric system.1
Type of Respondents: Generator
owners, distribution providers, other
NERC-registered entities.
Estimate of Annual Burden.2 The
Commission estimates the annual public
reporting burden and cost 3 for the
information collection as:
jspears on DSK3GMQ082PROD with NOTICES
FERC–725J (DEFINITION OF THE BULK ELECTRIC SYSTEM)
Number of
respondents
Annual
number of
responses per
respondent
(1)
(2)
Total number
of responses
Average
burden
(hrs.) & cost ($) per
response
Total annual
burden
hours &
total
annual cost
($)
Cost per
respondent
($)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Generator Owners, Distribution Providers, and
Transmission Owners
(Exception Request).
All Registered Entities
(Implementation Plans
and Compliance).
Local Distribution Determinations.
20
1
20
94 hrs.; $7,708 ......
1,880 hrs.; $154,160 ......
$7,708
186
1
186
350 hrs.; $28,700 ..
65,100 hrs.; $5,338,200
28,700
1
1
1
92 hrs.; $7,544 ......
92 hrs.; $7,544 ...............
Total .........................
........................
........................
207
................................
67,072 hrs.; $5,499,904
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collection of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collection; and (4) ways to
minimize the burden of the collection of
information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
1 Revisions to Electric Reliability Organization
Definition of Bulk Electric System and Rules of
Procedure, Order No. 773, 141 FERC 61,236 (2012);
order on reh’g, Order No. 773–A, 143 FERC 61,053
(2013); order on reh’g and clarification, 144 FERC
61,174 (2013); aff’d sub nom., People of the State
of New York and the Pub. Serv. Comm’n of New
York v. FERC, No. 13–2316 (2d. Cir. 2015). On June
13, 2013, the Commission granted NERC’s request
for extension of time and extended the effective
date for the revised definition of bulk electric
system and the Rules of Procedure exception
process to July 1, 2014. Revisions to Electric
Reliability Organization Definition of Bulk Electric
System and Rules of Procedure, 143 FERC 61,231,
at P 13 (2013). On March 20, 2014, the Commission
approved NERC’s revisions to the definition of bulk
electric system and determined the revisions either
adequately address the Commission’s Order Nos.
773 and 773–A directives or provide an equally
effective and efficient approach. See order
approving revised definition, 146 FERC ¶ 61,199
(2014).
2 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a federal agency. See 5 CFR
1320 for additional information on the definition of
information collection burden.
3 The estimated hourly cost (salary plus benefits)
is based on the figures for May 2018 posted by the
VerDate Sep<11>2014
18:19 Aug 12, 2019
Jkt 247001
7,544
........................
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FR Doc. 2019–17250 Filed 8–12–19; 8:45 am]
[FWS–HQ–ES–2019–N033;
FXES11130100000C4–190–FF02ENEH00]
BILLING CODE 6717–01–P
Endangered and Threatened Wildlife
and Plants; 28 Draft Recovery Plan
Revisions for 53 Species in the
Southeast, Mountain-Prairie, and
Pacific Southwest Regions of the
United States
Correction
In notice document 2019–16749,
beginning on page 38284 in the issue of
August 6, 2019, make the following
correction:
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Bureau of Labor Statistics for the Utilities sector
(available at https://www.bls.gov/oes/current/naics2_
22.htm) and updated March 2019 for benefits
information (at https://www.bls.gov/news.release/
ecec.nr0.htm). The hourly estimates for salary plus
benefits are:
—Legal (code 23–0000), $142.86
—File Clerks (code 43–4071), $34.50
—Electrical Engineer (code 17–2071), $68.17
The average hourly burden cost for this collection
is $81.84 [($142.86 + $34.50 + $68.17) / 3 = $81.84]
and is rounded to $82.00 an hour.
E:\FR\FM\13AUN1.SGM
13AUN1
40040
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
On page 38285, in the table, on the
first line, in column six, the URL
https://ecos.fws.gov/docs/recovery_
plan/Orangenacre%20Mucket
%20Recovery%20Plan
%20Amendment.pdf should read
https://ecos.fws.gov/docs/recovery_
plan/Orange-nacre%20Mucket
%20Recovery%20Plan%20Amendment.
pdf.
[FR Doc. C1–2019–16749 Filed 8–12–19; 8:45 am]
BILLING CODE 1301–00–D
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–117–000.
Applicants: Simon Solar Farm LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Simon Solar
Farm LLC.
Filed Date: 8/6/19.
Accession Number: 20190806–5167.
Comments Due: 5 p.m. ET 8/27/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1156–001.
Applicants: St. Joseph Energy Center,
LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 8/7/19.
Accession Number: 20190807–5047.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER18–2002–001.
Applicants: Essential Power Rock
Springs, LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 8/7/19.
Accession Number: 20190807–5042.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2537–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–06 Non-conforming Reliability
Coordinator Service Agreement—
Gridforce to be effective 10/7/2019.
Filed Date: 8/6/19.
Accession Number: 20190806–5145.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2538–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
Second Amended Generation Dispatch
and Energy Management Agreement to
be effective 9/3/2019.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
Filed Date: 8/6/19.
Accession Number: 20190806–5153.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2539–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—First Wind Energy
to be effective 8/6/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5014.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2540–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—Blue Sky West,
LLC to be effective 10/27/2016.
Filed Date: 8/7/19.
Accession Number: 20190807–5015.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2541–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—Aroostook Wind to
be effective 10/8/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5016.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2542–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5451; Queue
No. AD1–018 to be effective 7/9/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5049.
Comments Due: 5 p.m. ET 8/28/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17249 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2880–015]
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Licensing and Deadline for
Submission of Final Amendments:
Cherokee Falls Hydroelectric Project,
LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 2880–015.
c. Date Filed: July 31, 2019.
d. Applicant: Cherokee Falls
Hydroelectric Project, LLC.
e. Name of Project: Cherokee Falls
Hydroelectric Project (Cherokee Falls
Project).
f. Location: The existing project is
located the Broad River, in Cherokee
County, South Carolina. The project
does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Beth E. Harris,
Southwest Regional Engineer, Enel
Green Power North America, Inc., 11
Anderson Street, Piedmont, SC 29673;
Telephone (864) 846–0042 ext. 100;
Beth.Harris@Enel.com.
i. FERC Contact: Michael Spencer at
(202) 502–6093, or at michael.spencer@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Pages 40039-40040]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: C1-2019-16749]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Fish and Wildlife Service
[FWS-HQ-ES-2019-N033; FXES11130100000C4-190-FF02ENEH00]
Endangered and Threatened Wildlife and Plants; 28 Draft Recovery
Plan Revisions for 53 Species in the Southeast, Mountain-Prairie, and
Pacific Southwest Regions of the United States
Correction
In notice document 2019-16749, beginning on page 38284 in the issue
of August 6, 2019, make the following correction:
[[Page 40040]]
On page 38285, in the table, on the first line, in column six, the
URL https://ecos.fws.gov/docs/recovery_plan/Orangenacre%20Mucket%20Recovery%20Plan%20Amendment.pdf should read
https://ecos.fws.gov/docs/recovery_plan/Orange-nacre%20Mucket%20Recovery%20Plan%20Amendment.pdf.
[FR Doc. C1-2019-16749 Filed 8-12-19; 8:45 am]
BILLING CODE 1301-00-D