Black Canyon Bliss, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of The Traditional Licensing Process, 40042 [2019-17295]
Download as PDF
40042
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
However, the non-party commenters,
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and seven
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17251 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8866–012]
jspears on DSK3GMQ082PROD with NOTICES
Black Canyon Bliss, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of The Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request
To Use the Traditional Licensing
Process.
b. Project No.: 8866–012.
c. Date Filed: February 28, 2019.
d. Submitted By: Black Canyon Bliss,
LLC (BCB).
e. Name of Project: Stevenson No. 2
Hydroelectric Project.
f. Location: On an unnamed tributary
to the Snake River in Gooding County,
Idaho. No federal lands are occupied by
the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Chris
Capps, Project Manager, Black Canyon
Bliss LLC, P.O. Box 95, Rupert, Idaho
83350; (208) 934–6711; or email at
chris.auxilium@gmail.com.
i. FERC Contact: Julia Kolberg at (202)
502–8261; or email at julia.kolberg@
ferc.gov.
j. Black Canyon Bliss, LLC filed its
request to use the Traditional Licensing
Process on February 28, 2019. BCB
provided public notice of its request on
June 13, 2019. In a letter dated July 15,
2019, the Director of the Division of
Hydropower Licensing approved BCB’s
request to use the Traditional Licensing
Process.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, Part 402. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
BCB as the Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. BCB filed a Pre-Application
Document (PAD) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 8866.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by March 1, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: August 6, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17295 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1452–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: Aug
2019 Negotiated Rates Cleanup Filing to
be effective 9/1/2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5003.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1453–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing
Termination of Rate Schedule X–128 to
be effective 9/2/2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5004.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1454–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Conoco Aug 2019) to be effective 8/5/
2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5067.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–238–002.
Applicants: Southwest Gas
Transmission Company, A Limited
Partnership.
Description: Compliance filing
Compliance Filing to Settlement to be
effective 8/14/2017.
Filed Date: 8/2/19.
Accession Number: 20190802–5031.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1455–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Perm
Cap Rel Related Neg Rate Agmts (PH
41448, 41455 to BP 51410, 51411) to be
effective 8/1/2019.
Filed Date: 8/5/19.
Accession Number: 20190805–5082.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: RP19–1456–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: § 4(d) Rate Filing: Vol.2—
Negotiated Rate and Non-Conforming
Agreement—K2 Commodities to be
effective 8/3/2019.
Filed Date: 8/5/19.
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Page 40042]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17295]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 8866-012]
Black Canyon Bliss, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of The
Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request To Use the Traditional Licensing Process.
b. Project No.: 8866-012.
c. Date Filed: February 28, 2019.
d. Submitted By: Black Canyon Bliss, LLC (BCB).
e. Name of Project: Stevenson No. 2 Hydroelectric Project.
f. Location: On an unnamed tributary to the Snake River in Gooding
County, Idaho. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Chris Capps, Project Manager, Black
Canyon Bliss LLC, P.O. Box 95, Rupert, Idaho 83350; (208) 934-6711; or
email at [email protected].
i. FERC Contact: Julia Kolberg at (202) 502-8261; or email at
[email protected].
j. Black Canyon Bliss, LLC filed its request to use the Traditional
Licensing Process on February 28, 2019. BCB provided public notice of
its request on June 13, 2019. In a letter dated July 15, 2019, the
Director of the Division of Hydropower Licensing approved BCB's request
to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service under section 7 of the Endangered
Species Act and the joint agency regulations thereunder at 50 CFR, Part
402. We are also initiating consultation with the Idaho State Historic
Preservation Officer, as required by section 106, National Historic
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating BCB as the Commission's
non-federal representative for carrying out informal consultation
pursuant to section 7 of the Endangered Species Act; and consultation
pursuant to section 106 of the National Historic Preservation Act.
m. BCB filed a Pre-Application Document (PAD) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the eLibrary link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 8866. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by March 1,
2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: August 6, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17295 Filed 8-12-19; 8:45 am]