Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments: Cherokee Falls Hydroelectric Project, LLC, 40040-40041 [2019-17252]

Download as PDF 40040 Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices On page 38285, in the table, on the first line, in column six, the URL https://ecos.fws.gov/docs/recovery_ plan/Orangenacre%20Mucket %20Recovery%20Plan %20Amendment.pdf should read https://ecos.fws.gov/docs/recovery_ plan/Orange-nacre%20Mucket %20Recovery%20Plan%20Amendment. pdf. [FR Doc. C1–2019–16749 Filed 8–12–19; 8:45 am] BILLING CODE 1301–00–D DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jspears on DSK3GMQ082PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC19–117–000. Applicants: Simon Solar Farm LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, et al. of Simon Solar Farm LLC. Filed Date: 8/6/19. Accession Number: 20190806–5167. Comments Due: 5 p.m. ET 8/27/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1156–001. Applicants: St. Joseph Energy Center, LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 8/7/19. Accession Number: 20190807–5047. Comments Due: 5 p.m. ET 8/28/19. Docket Numbers: ER18–2002–001. Applicants: Essential Power Rock Springs, LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 8/7/19. Accession Number: 20190807–5042. Comments Due: 5 p.m. ET 8/28/19. Docket Numbers: ER19–2537–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–08–06 Non-conforming Reliability Coordinator Service Agreement— Gridforce to be effective 10/7/2019. Filed Date: 8/6/19. Accession Number: 20190806–5145. Comments Due: 5 p.m. ET 8/27/19. Docket Numbers: ER19–2538–000. Applicants: Black Hills Power, Inc. Description: § 205(d) Rate Filing: Second Amended Generation Dispatch and Energy Management Agreement to be effective 9/3/2019. VerDate Sep<11>2014 17:51 Aug 12, 2019 Jkt 247001 Filed Date: 8/6/19. Accession Number: 20190806–5153. Comments Due: 5 p.m. ET 8/27/19. Docket Numbers: ER19–2539–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired Service Agreement—First Wind Energy to be effective 8/6/2019. Filed Date: 8/7/19. Accession Number: 20190807–5014. Comments Due: 5 p.m. ET 8/28/19. Docket Numbers: ER19–2540–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired Service Agreement—Blue Sky West, LLC to be effective 10/27/2016. Filed Date: 8/7/19. Accession Number: 20190807–5015. Comments Due: 5 p.m. ET 8/28/19. Docket Numbers: ER19–2541–000. Applicants: Emera Maine. Description: Tariff Cancellation: Notice of Termination of Expired Service Agreement—Aroostook Wind to be effective 10/8/2019. Filed Date: 8/7/19. Accession Number: 20190807–5016. Comments Due: 5 p.m. ET 8/28/19. Docket Numbers: ER19–2542–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA SA No. 5451; Queue No. AD1–018 to be effective 7/9/2019. Filed Date: 8/7/19. Accession Number: 20190807–5049. Comments Due: 5 p.m. ET 8/28/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 7, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17249 Filed 8–12–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2880–015] Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments: Cherokee Falls Hydroelectric Project, LLC Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License. b. Project No.: 2880–015. c. Date Filed: July 31, 2019. d. Applicant: Cherokee Falls Hydroelectric Project, LLC. e. Name of Project: Cherokee Falls Hydroelectric Project (Cherokee Falls Project). f. Location: The existing project is located the Broad River, in Cherokee County, South Carolina. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Beth E. Harris, Southwest Regional Engineer, Enel Green Power North America, Inc., 11 Anderson Street, Piedmont, SC 29673; Telephone (864) 846–0042 ext. 100; Beth.Harris@Enel.com. i. FERC Contact: Michael Spencer at (202) 502–6093, or at michael.spencer@ ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and E:\FR\FM\13AUN1.SGM 13AUN1 jspears on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: September 30, 2019. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2280–015. m. This application is not ready for environmental analysis at this time. n. Project Description: The Cherokee Falls Project consists of: (1) A 1,819foot-long granite masonry dam with a 1,701-foot-long spillway and 4-foot-high flashboards; (2) a reservoir with a surface area of 83 acres and a storage capacity of 140 acre-feet; (3) a trash rack intake; (4) a 130-foot-long powerhouse containing one generating unit with a capacity of 4,140 kilowatts and an annual generation of 9,354.9 megawatthours; (5) a 150-foot-long tailrace; (6) 93-foot-long generator leads to three 500-kilovolt transformers and (7) a 200foot-long transmission line to a point of interconnection with the grid. The Project is operated in a run-ofriver mode with a continuous year round minimum flow of 65 cubic feet per second (cfs) in the bypassed reach. Project operation starts when inflows exceed 665 cfs, the sum of the minimum hydraulic capacity of the turbine (600 cfs) and the minimum flow. All flows greater than 3,165 cfs, which is the sum of the maximum hydraulic capacity of the turbine (3,100 cfs) and the minimum flow, are passed over the spillway. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov, using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in paragraph h. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. VerDate Sep<11>2014 17:51 Aug 12, 2019 Jkt 247001 For assistance, contact FERC Online Support. p. Procedural Schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary)— October 2019 Issue Acceptance Letter—November 2019 Issue Scoping Document—December 2019 Request Additional information (if necessary)—February 2020 Notice of Ready for Environmental Analysis—May 2020 Filing of recommendations, preliminary terms and conditions, and fishway prescriptions—July 2020 Commission issues EA—October 2020 Comments on EA—November 2020 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 7, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17252 Filed 8–12–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–493–000] Equitrans, LP; Notice of Request Under Blanket Authorization Take notice that on July 30, 2019, Equitrans, LP (Equitrans), 2200 Energy Drive, Canonsburg, Pennsylvania 15317, filed in Docket No. CP19–493–000 a prior notice request pursuant to sections 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA), and Equitrans’ blanket certificate issued in Docket No. CP96–532–000, to abandon by sale to Peoples Natural Gas Company, LLC approximately 4,287 feet of its TP–7575 Pipeline, located in Allegheny County, Pennsylvania, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 40041 FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Matthew Eggerding, Assistant General Counsel, Equitrans, LP, 2200 Energy Drive, Canonsburg, Pennsylvania 15317, by telephone at (412) 553–5786, or by email at meggerding@ equitransmidstream.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. E:\FR\FM\13AUN1.SGM 13AUN1

Agencies

[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Pages 40040-40041]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17252]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2880-015]


Notice of Application Tendered for Filing With the Commission and 
Soliciting Additional Study Requests and Establishing Procedural 
Schedule for Licensing and Deadline for Submission of Final Amendments: 
Cherokee Falls Hydroelectric Project, LLC

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 2880-015.
    c. Date Filed: July 31, 2019.
    d. Applicant: Cherokee Falls Hydroelectric Project, LLC.
    e. Name of Project: Cherokee Falls Hydroelectric Project (Cherokee 
Falls Project).
    f. Location: The existing project is located the Broad River, in 
Cherokee County, South Carolina. The project does not affect federal 
lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Beth E. Harris, Southwest Regional Engineer, 
Enel Green Power North America, Inc., 11 Anderson Street, Piedmont, SC 
29673; Telephone (864) 846-0042 ext. 100; [email protected].
    i. FERC Contact: Michael Spencer at (202) 502-6093, or at 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and

[[Page 40041]]

serve a copy of the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: September 30, 2019.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, please send a paper copy 
to: Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE, Washington, DC 20426. The first page of any filing should include 
docket number P-2280-015.
    m. This application is not ready for environmental analysis at this 
time.
    n. Project Description: The Cherokee Falls Project consists of: (1) 
A 1,819-foot-long granite masonry dam with a 1,701-foot-long spillway 
and 4-foot-high flashboards; (2) a reservoir with a surface area of 83 
acres and a storage capacity of 140 acre-feet; (3) a trash rack intake; 
(4) a 130-foot-long powerhouse containing one generating unit with a 
capacity of 4,140 kilowatts and an annual generation of 9,354.9 
megawatt-hours; (5) a 150-foot-long tailrace; (6) 93-foot-long 
generator leads to three 500-kilovolt transformers and (7) a 200-foot-
long transmission line to a point of interconnection with the grid.
    The Project is operated in a run-of-river mode with a continuous 
year round minimum flow of 65 cubic feet per second (cfs) in the 
bypassed reach. Project operation starts when inflows exceed 665 cfs, 
the sum of the minimum hydraulic capacity of the turbine (600 cfs) and 
the minimum flow. All flows greater than 3,165 cfs, which is the sum of 
the maximum hydraulic capacity of the turbine (3,100 cfs) and the 
minimum flow, are passed over the spillway.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's website at https://www.ferc.gov, using the eLibrary link. 
Enter the docket number, excluding the last three digits in the docket 
number field, to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural Schedule and final amendments: The application will 
be processed according to the following preliminary Hydro Licensing 
Schedule. Revisions to the schedule will be made as appropriate.

Issue Deficiency Letter (if necessary)--October 2019
Issue Acceptance Letter--November 2019
Issue Scoping Document--December 2019
Request Additional information (if necessary)--February 2020
Notice of Ready for Environmental Analysis--May 2020
Filing of recommendations, preliminary terms and conditions, and 
fishway prescriptions--July 2020
Commission issues EA--October 2020
Comments on EA--November 2020

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17252 Filed 8-12-19; 8:45 am]
 BILLING CODE 6717-01-P