Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments: Cherokee Falls Hydroelectric Project, LLC, 40040-40041 [2019-17252]
Download as PDF
40040
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
On page 38285, in the table, on the
first line, in column six, the URL
https://ecos.fws.gov/docs/recovery_
plan/Orangenacre%20Mucket
%20Recovery%20Plan
%20Amendment.pdf should read
https://ecos.fws.gov/docs/recovery_
plan/Orange-nacre%20Mucket
%20Recovery%20Plan%20Amendment.
pdf.
[FR Doc. C1–2019–16749 Filed 8–12–19; 8:45 am]
BILLING CODE 1301–00–D
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–117–000.
Applicants: Simon Solar Farm LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Simon Solar
Farm LLC.
Filed Date: 8/6/19.
Accession Number: 20190806–5167.
Comments Due: 5 p.m. ET 8/27/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1156–001.
Applicants: St. Joseph Energy Center,
LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 8/7/19.
Accession Number: 20190807–5047.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER18–2002–001.
Applicants: Essential Power Rock
Springs, LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 8/7/19.
Accession Number: 20190807–5042.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2537–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–08–06 Non-conforming Reliability
Coordinator Service Agreement—
Gridforce to be effective 10/7/2019.
Filed Date: 8/6/19.
Accession Number: 20190806–5145.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2538–000.
Applicants: Black Hills Power, Inc.
Description: § 205(d) Rate Filing:
Second Amended Generation Dispatch
and Energy Management Agreement to
be effective 9/3/2019.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
Filed Date: 8/6/19.
Accession Number: 20190806–5153.
Comments Due: 5 p.m. ET 8/27/19.
Docket Numbers: ER19–2539–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—First Wind Energy
to be effective 8/6/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5014.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2540–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—Blue Sky West,
LLC to be effective 10/27/2016.
Filed Date: 8/7/19.
Accession Number: 20190807–5015.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2541–000.
Applicants: Emera Maine.
Description: Tariff Cancellation:
Notice of Termination of Expired
Service Agreement—Aroostook Wind to
be effective 10/8/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5016.
Comments Due: 5 p.m. ET 8/28/19.
Docket Numbers: ER19–2542–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 5451; Queue
No. AD1–018 to be effective 7/9/2019.
Filed Date: 8/7/19.
Accession Number: 20190807–5049.
Comments Due: 5 p.m. ET 8/28/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17249 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2880–015]
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Licensing and Deadline for
Submission of Final Amendments:
Cherokee Falls Hydroelectric Project,
LLC
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New License.
b. Project No.: 2880–015.
c. Date Filed: July 31, 2019.
d. Applicant: Cherokee Falls
Hydroelectric Project, LLC.
e. Name of Project: Cherokee Falls
Hydroelectric Project (Cherokee Falls
Project).
f. Location: The existing project is
located the Broad River, in Cherokee
County, South Carolina. The project
does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Beth E. Harris,
Southwest Regional Engineer, Enel
Green Power North America, Inc., 11
Anderson Street, Piedmont, SC 29673;
Telephone (864) 846–0042 ext. 100;
Beth.Harris@Enel.com.
i. FERC Contact: Michael Spencer at
(202) 502–6093, or at michael.spencer@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
E:\FR\FM\13AUN1.SGM
13AUN1
jspears on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 30, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2280–015.
m. This application is not ready for
environmental analysis at this time.
n. Project Description: The Cherokee
Falls Project consists of: (1) A 1,819foot-long granite masonry dam with a
1,701-foot-long spillway and 4-foot-high
flashboards; (2) a reservoir with a
surface area of 83 acres and a storage
capacity of 140 acre-feet; (3) a trash rack
intake; (4) a 130-foot-long powerhouse
containing one generating unit with a
capacity of 4,140 kilowatts and an
annual generation of 9,354.9 megawatthours; (5) a 150-foot-long tailrace; (6)
93-foot-long generator leads to three
500-kilovolt transformers and (7) a 200foot-long transmission line to a point of
interconnection with the grid.
The Project is operated in a run-ofriver mode with a continuous year
round minimum flow of 65 cubic feet
per second (cfs) in the bypassed reach.
Project operation starts when inflows
exceed 665 cfs, the sum of the minimum
hydraulic capacity of the turbine (600
cfs) and the minimum flow. All flows
greater than 3,165 cfs, which is the sum
of the maximum hydraulic capacity of
the turbine (3,100 cfs) and the minimum
flow, are passed over the spillway.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in paragraph h.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
For assistance, contact FERC Online
Support.
p. Procedural Schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)—
October 2019
Issue Acceptance Letter—November
2019
Issue Scoping Document—December
2019
Request Additional information (if
necessary)—February 2020
Notice of Ready for Environmental
Analysis—May 2020
Filing of recommendations, preliminary
terms and conditions, and fishway
prescriptions—July 2020
Commission issues EA—October 2020
Comments on EA—November 2020
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17252 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–493–000]
Equitrans, LP; Notice of Request
Under Blanket Authorization
Take notice that on July 30, 2019,
Equitrans, LP (Equitrans), 2200 Energy
Drive, Canonsburg, Pennsylvania 15317,
filed in Docket No. CP19–493–000 a
prior notice request pursuant to sections
157.205, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Equitrans’
blanket certificate issued in Docket No.
CP96–532–000, to abandon by sale to
Peoples Natural Gas Company, LLC
approximately 4,287 feet of its TP–7575
Pipeline, located in Allegheny County,
Pennsylvania, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
40041
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Matthew
Eggerding, Assistant General Counsel,
Equitrans, LP, 2200 Energy Drive,
Canonsburg, Pennsylvania 15317, by
telephone at (412) 553–5786, or by
email at meggerding@
equitransmidstream.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Pages 40040-40041]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17252]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2880-015]
Notice of Application Tendered for Filing With the Commission and
Soliciting Additional Study Requests and Establishing Procedural
Schedule for Licensing and Deadline for Submission of Final Amendments:
Cherokee Falls Hydroelectric Project, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License.
b. Project No.: 2880-015.
c. Date Filed: July 31, 2019.
d. Applicant: Cherokee Falls Hydroelectric Project, LLC.
e. Name of Project: Cherokee Falls Hydroelectric Project (Cherokee
Falls Project).
f. Location: The existing project is located the Broad River, in
Cherokee County, South Carolina. The project does not affect federal
lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Beth E. Harris, Southwest Regional Engineer,
Enel Green Power North America, Inc., 11 Anderson Street, Piedmont, SC
29673; Telephone (864) 846-0042 ext. 100; [email protected].
i. FERC Contact: Michael Spencer at (202) 502-6093, or at
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and
[[Page 40041]]
serve a copy of the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 30, 2019.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first page of any filing should include
docket number P-2280-015.
m. This application is not ready for environmental analysis at this
time.
n. Project Description: The Cherokee Falls Project consists of: (1)
A 1,819-foot-long granite masonry dam with a 1,701-foot-long spillway
and 4-foot-high flashboards; (2) a reservoir with a surface area of 83
acres and a storage capacity of 140 acre-feet; (3) a trash rack intake;
(4) a 130-foot-long powerhouse containing one generating unit with a
capacity of 4,140 kilowatts and an annual generation of 9,354.9
megawatt-hours; (5) a 150-foot-long tailrace; (6) 93-foot-long
generator leads to three 500-kilovolt transformers and (7) a 200-foot-
long transmission line to a point of interconnection with the grid.
The Project is operated in a run-of-river mode with a continuous
year round minimum flow of 65 cubic feet per second (cfs) in the
bypassed reach. Project operation starts when inflows exceed 665 cfs,
the sum of the minimum hydraulic capacity of the turbine (600 cfs) and
the minimum flow. All flows greater than 3,165 cfs, which is the sum of
the maximum hydraulic capacity of the turbine (3,100 cfs) and the
minimum flow, are passed over the spillway.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov, using the eLibrary link.
Enter the docket number, excluding the last three digits in the docket
number field, to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the address in paragraph h.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural Schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--October 2019
Issue Acceptance Letter--November 2019
Issue Scoping Document--December 2019
Request Additional information (if necessary)--February 2020
Notice of Ready for Environmental Analysis--May 2020
Filing of recommendations, preliminary terms and conditions, and
fishway prescriptions--July 2020
Commission issues EA--October 2020
Comments on EA--November 2020
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.