Equitrans, LP; Notice of Request Under Blanket Authorization, 40041-40042 [2019-17251]

Download as PDF jspears on DSK3GMQ082PROD with NOTICES Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: September 30, 2019. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2280–015. m. This application is not ready for environmental analysis at this time. n. Project Description: The Cherokee Falls Project consists of: (1) A 1,819foot-long granite masonry dam with a 1,701-foot-long spillway and 4-foot-high flashboards; (2) a reservoir with a surface area of 83 acres and a storage capacity of 140 acre-feet; (3) a trash rack intake; (4) a 130-foot-long powerhouse containing one generating unit with a capacity of 4,140 kilowatts and an annual generation of 9,354.9 megawatthours; (5) a 150-foot-long tailrace; (6) 93-foot-long generator leads to three 500-kilovolt transformers and (7) a 200foot-long transmission line to a point of interconnection with the grid. The Project is operated in a run-ofriver mode with a continuous year round minimum flow of 65 cubic feet per second (cfs) in the bypassed reach. Project operation starts when inflows exceed 665 cfs, the sum of the minimum hydraulic capacity of the turbine (600 cfs) and the minimum flow. All flows greater than 3,165 cfs, which is the sum of the maximum hydraulic capacity of the turbine (3,100 cfs) and the minimum flow, are passed over the spillway. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at https://www.ferc.gov, using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in paragraph h. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. VerDate Sep<11>2014 17:51 Aug 12, 2019 Jkt 247001 For assistance, contact FERC Online Support. p. Procedural Schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter (if necessary)— October 2019 Issue Acceptance Letter—November 2019 Issue Scoping Document—December 2019 Request Additional information (if necessary)—February 2020 Notice of Ready for Environmental Analysis—May 2020 Filing of recommendations, preliminary terms and conditions, and fishway prescriptions—July 2020 Commission issues EA—October 2020 Comments on EA—November 2020 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 7, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17252 Filed 8–12–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP19–493–000] Equitrans, LP; Notice of Request Under Blanket Authorization Take notice that on July 30, 2019, Equitrans, LP (Equitrans), 2200 Energy Drive, Canonsburg, Pennsylvania 15317, filed in Docket No. CP19–493–000 a prior notice request pursuant to sections 157.205, and 157.216 of the Commission’s regulations under the Natural Gas Act (NGA), and Equitrans’ blanket certificate issued in Docket No. CP96–532–000, to abandon by sale to Peoples Natural Gas Company, LLC approximately 4,287 feet of its TP–7575 Pipeline, located in Allegheny County, Pennsylvania, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 40041 FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Matthew Eggerding, Assistant General Counsel, Equitrans, LP, 2200 Energy Drive, Canonsburg, Pennsylvania 15317, by telephone at (412) 553–5786, or by email at meggerding@ equitransmidstream.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, and will be notified of any meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. E:\FR\FM\13AUN1.SGM 13AUN1 40042 Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices However, the non-party commenters, will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Dated: August 7, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17251 Filed 8–12–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8866–012] jspears on DSK3GMQ082PROD with NOTICES Black Canyon Bliss, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of The Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request To Use the Traditional Licensing Process. b. Project No.: 8866–012. c. Date Filed: February 28, 2019. d. Submitted By: Black Canyon Bliss, LLC (BCB). e. Name of Project: Stevenson No. 2 Hydroelectric Project. f. Location: On an unnamed tributary to the Snake River in Gooding County, Idaho. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Chris Capps, Project Manager, Black Canyon Bliss LLC, P.O. Box 95, Rupert, Idaho 83350; (208) 934–6711; or email at chris.auxilium@gmail.com. i. FERC Contact: Julia Kolberg at (202) 502–8261; or email at julia.kolberg@ ferc.gov. j. Black Canyon Bliss, LLC filed its request to use the Traditional Licensing Process on February 28, 2019. BCB provided public notice of its request on June 13, 2019. In a letter dated July 15, 2019, the Director of the Division of Hydropower Licensing approved BCB’s request to use the Traditional Licensing Process. VerDate Sep<11>2014 17:51 Aug 12, 2019 Jkt 247001 k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402. We are also initiating consultation with the Idaho State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating BCB as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. BCB filed a Pre-Application Document (PAD) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 8866. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by March 1, 2022. p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: August 6, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–17295 Filed 8–12–19; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP19–1452–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Aug 2019 Negotiated Rates Cleanup Filing to be effective 9/1/2019. Filed Date: 8/2/19. Accession Number: 20190802–5003. Comments Due: 5 p.m. ET 8/14/19. Docket Numbers: RP19–1453–000. Applicants: Texas Eastern Transmission, LP. Description: Compliance filing Termination of Rate Schedule X–128 to be effective 9/2/2019. Filed Date: 8/2/19. Accession Number: 20190802–5004. Comments Due: 5 p.m. ET 8/14/19. Docket Numbers: RP19–1454–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Update (Conoco Aug 2019) to be effective 8/5/ 2019. Filed Date: 8/2/19. Accession Number: 20190802–5067. Comments Due: 5 p.m. ET 8/14/19. Docket Numbers: RP19–238–002. Applicants: Southwest Gas Transmission Company, A Limited Partnership. Description: Compliance filing Compliance Filing to Settlement to be effective 8/14/2017. Filed Date: 8/2/19. Accession Number: 20190802–5031. Comments Due: 5 p.m. ET 8/14/19. Docket Numbers: RP19–1455–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Perm Cap Rel Related Neg Rate Agmts (PH 41448, 41455 to BP 51410, 51411) to be effective 8/1/2019. Filed Date: 8/5/19. Accession Number: 20190805–5082. Comments Due: 5 p.m. ET 8/19/19. Docket Numbers: RP19–1456–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: § 4(d) Rate Filing: Vol.2— Negotiated Rate and Non-Conforming Agreement—K2 Commodities to be effective 8/3/2019. Filed Date: 8/5/19. E:\FR\FM\13AUN1.SGM 13AUN1

Agencies

[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Pages 40041-40042]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17251]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP19-493-000]


Equitrans, LP; Notice of Request Under Blanket Authorization

    Take notice that on July 30, 2019, Equitrans, LP (Equitrans), 2200 
Energy Drive, Canonsburg, Pennsylvania 15317, filed in Docket No. CP19-
493-000 a prior notice request pursuant to sections 157.205, and 
157.216 of the Commission's regulations under the Natural Gas Act 
(NGA), and Equitrans' blanket certificate issued in Docket No. CP96-
532-000, to abandon by sale to Peoples Natural Gas Company, LLC 
approximately 4,287 feet of its TP-7575 Pipeline, located in Allegheny 
County, Pennsylvania, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to 
Matthew Eggerding, Assistant General Counsel, Equitrans, LP, 2200 
Energy Drive, Canonsburg, Pennsylvania 15317, by telephone at (412) 
553-5786, or by email at [email protected].
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, and will be 
notified of any meetings associated with the Commission's environmental 
review process. Environmental commenters will not be required to serve 
copies of filed documents on all other parties.

[[Page 40042]]

However, the non-party commenters, will not receive copies of all 
documents filed by other parties or issued by the Commission and will 
not have the right to seek court review of the Commission's final 
order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the eFiling link at 
https://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.

    Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17251 Filed 8-12-19; 8:45 am]