Equitrans, LP; Notice of Request Under Blanket Authorization, 40041-40042 [2019-17251]
Download as PDF
jspears on DSK3GMQ082PROD with NOTICES
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 30, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2280–015.
m. This application is not ready for
environmental analysis at this time.
n. Project Description: The Cherokee
Falls Project consists of: (1) A 1,819foot-long granite masonry dam with a
1,701-foot-long spillway and 4-foot-high
flashboards; (2) a reservoir with a
surface area of 83 acres and a storage
capacity of 140 acre-feet; (3) a trash rack
intake; (4) a 130-foot-long powerhouse
containing one generating unit with a
capacity of 4,140 kilowatts and an
annual generation of 9,354.9 megawatthours; (5) a 150-foot-long tailrace; (6)
93-foot-long generator leads to three
500-kilovolt transformers and (7) a 200foot-long transmission line to a point of
interconnection with the grid.
The Project is operated in a run-ofriver mode with a continuous year
round minimum flow of 65 cubic feet
per second (cfs) in the bypassed reach.
Project operation starts when inflows
exceed 665 cfs, the sum of the minimum
hydraulic capacity of the turbine (600
cfs) and the minimum flow. All flows
greater than 3,165 cfs, which is the sum
of the maximum hydraulic capacity of
the turbine (3,100 cfs) and the minimum
flow, are passed over the spillway.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in paragraph h.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
For assistance, contact FERC Online
Support.
p. Procedural Schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Deficiency Letter (if necessary)—
October 2019
Issue Acceptance Letter—November
2019
Issue Scoping Document—December
2019
Request Additional information (if
necessary)—February 2020
Notice of Ready for Environmental
Analysis—May 2020
Filing of recommendations, preliminary
terms and conditions, and fishway
prescriptions—July 2020
Commission issues EA—October 2020
Comments on EA—November 2020
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17252 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–493–000]
Equitrans, LP; Notice of Request
Under Blanket Authorization
Take notice that on July 30, 2019,
Equitrans, LP (Equitrans), 2200 Energy
Drive, Canonsburg, Pennsylvania 15317,
filed in Docket No. CP19–493–000 a
prior notice request pursuant to sections
157.205, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Equitrans’
blanket certificate issued in Docket No.
CP96–532–000, to abandon by sale to
Peoples Natural Gas Company, LLC
approximately 4,287 feet of its TP–7575
Pipeline, located in Allegheny County,
Pennsylvania, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
40041
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Matthew
Eggerding, Assistant General Counsel,
Equitrans, LP, 2200 Energy Drive,
Canonsburg, Pennsylvania 15317, by
telephone at (412) 553–5786, or by
email at meggerding@
equitransmidstream.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
E:\FR\FM\13AUN1.SGM
13AUN1
40042
Federal Register / Vol. 84, No. 156 / Tuesday, August 13, 2019 / Notices
However, the non-party commenters,
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and seven
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17251 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8866–012]
jspears on DSK3GMQ082PROD with NOTICES
Black Canyon Bliss, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of The Traditional
Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request
To Use the Traditional Licensing
Process.
b. Project No.: 8866–012.
c. Date Filed: February 28, 2019.
d. Submitted By: Black Canyon Bliss,
LLC (BCB).
e. Name of Project: Stevenson No. 2
Hydroelectric Project.
f. Location: On an unnamed tributary
to the Snake River in Gooding County,
Idaho. No federal lands are occupied by
the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Chris
Capps, Project Manager, Black Canyon
Bliss LLC, P.O. Box 95, Rupert, Idaho
83350; (208) 934–6711; or email at
chris.auxilium@gmail.com.
i. FERC Contact: Julia Kolberg at (202)
502–8261; or email at julia.kolberg@
ferc.gov.
j. Black Canyon Bliss, LLC filed its
request to use the Traditional Licensing
Process on February 28, 2019. BCB
provided public notice of its request on
June 13, 2019. In a letter dated July 15,
2019, the Director of the Division of
Hydropower Licensing approved BCB’s
request to use the Traditional Licensing
Process.
VerDate Sep<11>2014
17:51 Aug 12, 2019
Jkt 247001
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service under section 7 of
the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, Part 402. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
BCB as the Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. BCB filed a Pre-Application
Document (PAD) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the eLibrary link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in
paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 8866.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by March 1, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: August 6, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–17295 Filed 8–12–19; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1452–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: Aug
2019 Negotiated Rates Cleanup Filing to
be effective 9/1/2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5003.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1453–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing
Termination of Rate Schedule X–128 to
be effective 9/2/2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5004.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1454–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(Conoco Aug 2019) to be effective 8/5/
2019.
Filed Date: 8/2/19.
Accession Number: 20190802–5067.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–238–002.
Applicants: Southwest Gas
Transmission Company, A Limited
Partnership.
Description: Compliance filing
Compliance Filing to Settlement to be
effective 8/14/2017.
Filed Date: 8/2/19.
Accession Number: 20190802–5031.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: RP19–1455–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Perm
Cap Rel Related Neg Rate Agmts (PH
41448, 41455 to BP 51410, 51411) to be
effective 8/1/2019.
Filed Date: 8/5/19.
Accession Number: 20190805–5082.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: RP19–1456–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: § 4(d) Rate Filing: Vol.2—
Negotiated Rate and Non-Conforming
Agreement—K2 Commodities to be
effective 8/3/2019.
Filed Date: 8/5/19.
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 84, Number 156 (Tuesday, August 13, 2019)]
[Notices]
[Pages 40041-40042]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-17251]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-493-000]
Equitrans, LP; Notice of Request Under Blanket Authorization
Take notice that on July 30, 2019, Equitrans, LP (Equitrans), 2200
Energy Drive, Canonsburg, Pennsylvania 15317, filed in Docket No. CP19-
493-000 a prior notice request pursuant to sections 157.205, and
157.216 of the Commission's regulations under the Natural Gas Act
(NGA), and Equitrans' blanket certificate issued in Docket No. CP96-
532-000, to abandon by sale to Peoples Natural Gas Company, LLC
approximately 4,287 feet of its TP-7575 Pipeline, located in Allegheny
County, Pennsylvania, all as more fully set forth in the application
which is on file with the Commission and open to public inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to
Matthew Eggerding, Assistant General Counsel, Equitrans, LP, 2200
Energy Drive, Canonsburg, Pennsylvania 15317, by telephone at (412)
553-5786, or by email at [email protected].
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties.
[[Page 40042]]
However, the non-party commenters, will not receive copies of all
documents filed by other parties or issued by the Commission and will
not have the right to seek court review of the Commission's final
order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
Dated: August 7, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-17251 Filed 8-12-19; 8:45 am]
BILLING CODE 6717-01-P