Shell Energy North America (US), L.P.; Notice of Availability of Draft Environmental Assessment, 38960-38961 [2019-16953]
Download as PDF
jbell on DSK3GLQ082PROD with NOTICES
38960
Federal Register / Vol. 84, No. 153 / Thursday, August 8, 2019 / Notices
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
3 copies of filings made in the
proceeding with the Commission and
must provide a copy to the applicant
and to every other party. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commentors
will not be required to serve copies of
filed documents on all other parties.
VerDate Sep<11>2014
16:51 Aug 07, 2019
Jkt 247001
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
As of the February 27, 2018 date of
the Commission’s order in Docket No.
CP16–4–001, the Commission will
apply its revised practice concerning
out-of-time motions to intervene in any
new Natural Gas Act section 3 or section
7 proceeding.1 Persons desiring to
become a party to a certificate
proceeding are to intervene in a timely
manner. If seeking to intervene out-oftime, the movant is required to show
good cause why the time limitation
should be waived, and should provide
justification by reference to factors set
forth in Rule 214(d)(1) of the
Commission’s Rules and Regulations.2
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Comment Date: 5:00 p.m. Eastern
Time on August 21, 2019.
Dated: July 31, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16993 Filed 8–7–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14795–002]
Shell Energy North America (US), L.P.;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Hydro
Battery Pearl Hill Pumped Storage
Project, which would be located on
Rufus Woods Lake, near Bridgeport,
Douglas County, Washington and has
prepared a Draft Environmental
Assessment (DEA) for the project. The
project would be located on state lands
1 Tennessee Gas Pipeline Company, L.L.C., 162
FERC ¶ 61,167 at ¶ 50 (2018).
2 18 CFR 385.214(d)(1).
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
except for the lower reservoir and power
generation and pumping equipment
which would be located on Rufus
Woods Lake, a reservoir operated by the
U.S. Army Corps of Engineers (Corps).
The Corps, a cooperating agency for the
preparation of this environmental
assessment, is reviewing Shell’s project
for permits it would issue under
Sections 10 and 14 of the Rivers and
Harbors act of 1899 and Section 404 of
the Clean Water Act.
The DEA contains staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s website (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the eFiling link. The Commission
strongly encourages electronic filing.
Please file comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14795–002.
The Commission anticipates issuing
the final EA by November 2019.
E:\FR\FM\08AUN1.SGM
08AUN1
Federal Register / Vol. 84, No. 153 / Thursday, August 8, 2019 / Notices
For further information, contact Ryan
Hansen at (202) 502–8074 or at
ryan.hansen@ferc.gov.
Dated: August 2, 2019..
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16953 Filed 8–7–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: August 2, 2019.
Kimberly D. Bose,
Secretary.
[Docket No. ER19–2495–000]
jbell on DSK3GLQ082PROD with NOTICES
Wessington Springs Wind, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2019–16950 Filed 8–7–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced Wessington Springs
Wind, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 22,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
VerDate Sep<11>2014
16:51 Aug 07, 2019
Jkt 247001
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1894–211]
South Carolina Electric & Gas
Company; Notice of Application
Accepted for Filing, Soliciting Motions
To Intervene and Protests, Ready for
Environmental Analysis, and Soliciting
Comments, Recommendations, Terms
and Conditions, and Preliminary
Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–1894–211.
c. Date filed: June 28, 2018.
d. Applicant: South Carolina Electric
& Gas Company (SCE&G).
e. Name of Project: Parr Hydroelectric
Project.
f. Location: The existing project is
located on the Broad River, in Newberry
and Fairfield Counties, South Carolina.
The project occupies 162.61 acres of
federal land administered by the Forest
Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Mr. William
Argentieri, P.E., Manager of Civil
Engineering, South Carolina Electric &
Gas Company, 220 Operation Way, Mail
Code A221, Cayce, SC 29033–3701;
(803) 217–9162; or email at bargentieri@
scana.com.
i. FERC Contact: Monte TerHaar at
(202) 502–6035; or at monte.terhaar@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
38961
recommendations, terms and
conditions, and preliminary
prescriptions: 60 days from the issuance
date of this notice; reply comments are
due 105 days from the issuance date of
this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, terms and
conditions, and preliminary fishway
prescriptions using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–1894–211.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The project
consists of two developments; the 14.88Megawatt (MW) Parr Shoals
Development and the 511.2–MW
Fairfield Pumped Storage Development.
The Parr Shoals Development consists
of: (1) The 15-mile-long, 4,250-acre Parr
Reservoir, at full pond elevation 265.3
feet North American Vertical Datum of
1988 (NAVD 88); (2) the 2,690-foot-long
Parr Shoals Dam, which includes a nonoverflow section, a spillway section
with 10 spillway gates, and a
powerhouse intake section; (3) a
powerhouse integral with the dam, with
six generating units; and (4)
transmission facilities that consist of
three 950-foot-long, 13.8-kilovolt lines
that extend from the hydro station to the
non-project Parr sub-station.
The Fairfield Pumped Storage
Development consists of: (1) The Parr
Reservoir which serves as the lower
pool; (2) the 6,800-acre Monticello
E:\FR\FM\08AUN1.SGM
08AUN1
Agencies
[Federal Register Volume 84, Number 153 (Thursday, August 8, 2019)]
[Notices]
[Pages 38960-38961]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16953]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14795-002]
Shell Energy North America (US), L.P.; Notice of Availability of
Draft Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for license for the Hydro Battery Pearl Hill
Pumped Storage Project, which would be located on Rufus Woods Lake,
near Bridgeport, Douglas County, Washington and has prepared a Draft
Environmental Assessment (DEA) for the project. The project would be
located on state lands except for the lower reservoir and power
generation and pumping equipment which would be located on Rufus Woods
Lake, a reservoir operated by the U.S. Army Corps of Engineers (Corps).
The Corps, a cooperating agency for the preparation of this
environmental assessment, is reviewing Shell's project for permits it
would issue under Sections 10 and 14 of the Rivers and Harbors act of
1899 and Section 404 of the Clean Water Act.
The DEA contains staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the DEA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's website at
https://www.ferc.gov using the eLibrary link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice.
Comments may be filed electronically via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's website
(https://www.ferc.gov/docs-filing/ferconline.asp) under the eFiling
link. The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-14795-002.
The Commission anticipates issuing the final EA by November 2019.
[[Page 38961]]
For further information, contact Ryan Hansen at (202) 502-8074 or
at [email protected].
Dated: August 2, 2019..
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-16953 Filed 8-7-19; 8:45 am]
BILLING CODE 6717-01-P