Denali Commission Fiscal Year 2020 Draft Work Plan, 38604-38606 [2019-16914]

Download as PDF 38604 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices the FACA, all submitted comments will be treated as public documents and will be made available for public inspection, including, but not limited to, being posted on the Board’s website. Dated: August 2, 2019. Aaron T. Siegel, Alternate OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 2019–16875 Filed 8–6–19; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF DEFENSE Department of the Navy Meeting of the Board of Visitors of Marine Corps University Department of the Navy, DoD. Notice of open meeting. AGENCY: ACTION: The Board of Visitors of the Marine Corps University (BOV MCU) will meet to review, develop and provide recommendations on all aspects of the academic and administrative policies of the University; examine all aspects of professional military education operations; and provide such oversight and advice, as is necessary, to facilitate high educational standards and cost effective operations. The Board will be focusing primarily on the internal procedures of Marine Corps University. All sessions of the meeting will be open to the public. DATES: The meeting will be held on Thursday, September 19, 2019, from 8:00 a.m. to 4:30 p.m. and Friday, September 20, 2019, from 8:00 a.m. to 12:30 p.m. Eastern Time Zone. ADDRESSES: The meeting will be held at Marine Corps University in Quantico, Virginia. The address is: 2076 South Street, Quantico, VA 22134. FOR FURTHER INFORMATION CONTACT: Dr. Kim Florich, Director of Faculty Development and Outreach, Marine Corps University Board of Visitors, 2076 South Street, Quantico, Virginia 22134, 703–432–4837. SUMMARY: Dated: August 2, 2019. M.S. Werner, Commander, Judge Advocate General’s Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 2019–16869 Filed 8–6–19; 8:45 am] jspears on DSK3GMQ082PROD with NOTICES BILLING CODE 3810–FF–P DENALI COMMISSION Denali Commission Fiscal Year 2020 Draft Work Plan Denali Commission. Notice. AGENCY: ACTION: VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 The Denali Commission (Commission) is an independent Federal agency based on an innovative federalstate partnership designed to provide critical utilities, infrastructure and support for economic development and training in Alaska by delivering federal services in the most cost-effective manner possible. The Commission was created in 1998 with passage of the October 21, 1998 Denali Commission Act (Act). The Act requires that the Commission develop proposed work plans for future spending and that the annual work plan be published in the Federal Register, providing an opportunity for a 30-day period of public review and written comment. This Federal Register notice serves to announce the 30-day opportunity for public comment on the Denali Commission Draft Work Plan for Federal Fiscal Year 2020 (FY 2020). DATES: Comments and related material to be received by September 2, 2019. ADDRESSES: Submit comments to the Denali Commission, Attention: Elinda Hetami, 510 L Street, Suite 410, Anchorage, AK 99501. FOR FURTHER INFORMATION CONTACT: Elinda Hetami, Denali Commission, 510 L Street, Suite 410, Anchorage, AK 99501. Telephone: (907) 271–3415. Email: ehetemi@denali.gov. SUPPLEMENTARY INFORMATION: Background: The Denali Commission’s mission is to partner with tribal, federal, state, and local governments and collaborate with all Alaskans to improve the effectiveness and efficiency of government services, to build and ensure the operation and maintenance of Alaska’s basic infrastructure, and to develop a well-trained labor force employed in a diversified and sustainable economy. By creating the Commission, Congress mandated that all parties involved partner together to find new and innovative solutions to the unique infrastructure and economic development challenges in America’s most remote communities. Pursuant to the Act, the Commission determines its own basic operating principles and funding criteria on an annual federal fiscal year (October 1 to September 30) basis. The Commission outlines these priorities and funding recommendations in an annual work plan. The FY 2020 Work Plan was developed in the following manner. • A workgroup comprised of Denali Commissioners and Commission staff developed a preliminary draft work plan. • The preliminary draft work plan was published on Denali.gov for review SUMMARY: PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 by the public in advance of public testimony. • A public hearing was held to record public comments and recommendations on the preliminary draft work plan. • Written comments on the preliminary draft work plan were accepted for another ten days after the public hearing. • All public hearing comments and written comments were provided to Commissioners for their review and consideration. • Commissioners discussed the preliminary draft work plan in a public meeting and then voted on the work plan during the meeting. • The Commissioners forwarded their recommended work plan to the Federal Co-Chair, who then prepared the draft work plan for publication in the Federal Register providing a 30-day period for public review and written comment. During this time, the draft work plan will also be disseminated to Commission program partners including, but not limited to, the Bureau of Indian Affairs (BIA), the Economic Development Administration (EDA), Department of Agriculture—Rural Utilities Service (USDA/RUS), and the State of Alaska. • At the conclusion of the Federal Register Public comment period Commission staff provides the Federal Co-Chair with a summary of public comments and recommendations, if any, on the draft work plan. • If no revisions are made to the draft, the Federal Co-Chair provides notice of approval of the work plan to the Commissioners, and forwards the work plan to the Secretary of Commerce for approval; or, if there are revisions the Federal Co-Chair provides notice of modifications to the Commissioners for their consideration and approval, and upon receipt of approval from Commissioners, forwards the work plan to the Secretary of Commerce for approval. • The Secretary of Commerce approves the work plan. • The Federal Co-Chair then approves grants and contracts based upon the approved work plan. FY 2020 Appropriations Summary The Commission has historically received federal funding from several sources. The two primary sources at this time include the Energy & Water Appropriation Bill (‘‘base’’ or ‘‘discretionary’’ funds) and an annual allocation from the Trans-Alaska Pipeline Liability (TAPL) fund. The proposed FY 2020 Work Plan assumes the Commission will receive $15,000,000 of base funds, which is the E:\FR\FM\07AUN1.SGM 07AUN1 38605 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices amount referenced in the reauthorization of the Commission passed by Congress in 2016 (ref: Pub. L. 114–322), and a $2,917,000 TAPL allocation based on discussions with the Office of Management and Budget (OMB). Approximately $2,500,000 of the base funds will be used for administrative expenses and non-project program support, leaving $12,500,000 available for program activities. The total base funding shown in the Work Plan also includes an amount typically available from project closeouts and other de-obligations that occur in any given year. Approximately $117,000 of the TAPL funds will be utilized for administrative expenses and non-project program support, leaving $2,800,000 available for program activities. Absent any new specific direction or limitations provided by Congress in the current Energy & Water Appropriations Bill, these funding sources are governed by the following general principles, either by statute or by language in the Work Plan itself: • Funds from the Energy & Water Appropriation are eligible for use in all programs. • TAPL funds can only be used for bulk fuel related projects and activities. • Appropriated funds may be reduced due to Congressional action, rescissions by OMB, and other federal agency actions. • All Energy & Water and TAPL investment amounts identified in the work plan, are ‘‘up to’’ amounts, and may be reassigned to other programs included in the current year work plan, if they are not fully expended in a program component area or a specific project. • Energy & Water and TAPL funds set aside for administrative expenses that subsequently become available, may be used for program activities included in the current year work plan. Denali Commission FY2020 funding summary Available for program activities Source Energy & Water Funds: FY 2020 Energy & Water Appropriation 1 .................................................................................................................................... Prior Year Funds .......................................................................................................................................................................... $12,500,000 2,000,000 Subtotal ................................................................................................................................................................................. TAPL Funds: FY 2020 Annual Allocation ........................................................................................................................................................... 14,500,000 Grand Total ........................................................................................................................................................................... 17,300,000 2,800,000 Notes: 1. If the final appropriation is less than $15 million the Federal Co-Chair shall reduce investments to balance the FY 2020 Work Plan. Base Energy Reliability and Security: Diesel Power Plants and Interties ........................................................................................ Wind, Hydro, Biomass, Other Proven Renewables and Emerging Technologies ............... Audits, TA, & Community Energy Efficiency Improvements ................................................ RPSU Maintenance and Improvement Projects .................................................................. Total $3,800,000 1,000,000 500,000 1,200,000 ........................ ........................ ........................ ........................ $3,800,000 1,000,000 500,000 1,200,000 6,500,000 ........................ 6,500,000 ........................ ........................ $1,500,000 700,000 1,500,000 700,000 0 2,200,000 2,200,000 150,000 150,000 150,000 150,000 400,000 ........................ ........................ ........................ ........................ ........................ 150,000 150,000 150,000 150,000 400,000 Subtotal ......................................................................................................................... Transportation .............................................................................................................................. Sanitation: Village Water, Wastewater and Solid Waste ....................................................................... 1,000,000 1,000,000 ........................ ........................ 1,000,000 1,000,000 2,000,000 ........................ 2,000,000 Subtotal ......................................................................................................................... Health Facilities ........................................................................................................................... Housing ........................................................................................................................................ Broadband ................................................................................................................................... Workforce Development: Energy and Bulk Fuel ........................................................................................................... Other ..................................................................................................................................... 2,000,000 1,000,000 500,000 1,000,000 ........................ ........................ ........................ ........................ 2,000,000 1,000,000 500,000 1,000,000 500,000 1,000,000 600,000 ........................ 1,100,000 1,000,000 Subtotal ......................................................................................................................... 1,500,000 600,000 2,100,000 Totals ...................................................................................................................... 14,500,000 2,800,000 17,300,000 Subtotal ......................................................................................................................... Bulk Fuel Safety and Security: New/Refurbished Facilities ................................................................................................... Maintenance and Improvement Projects .............................................................................. Subtotal ......................................................................................................................... Village Infrastructure Protection: Mertarvik ............................................................................................................................... Shishmaref ............................................................................................................................ Shaktoolik ............................................................................................................................. Kivalina ................................................................................................................................. Program Support .................................................................................................................. jspears on DSK3GMQ082PROD with NOTICES TAPL VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\07AUN1.SGM 07AUN1 38606 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices Energy, Bulk Fuel, Transportation, Sanitation, Health Facilities, Housing, Broadband, Workforce Development In FY 2020 the Commission is moving in a new direction to work closely with other Federal Agencies, the State of Alaska and regional/local entities with the goal of identifying projects with funding gaps that will allow the Commission to use its small amount of funding to move forward a large number of projects. The Commission has already begun to have conversations with many of our Federal partners and intends to prioritize shovel-ready projects where the Commission can leverage its funds. If the Commission is unable to fully utilize its funding by April of 2020 then it will use any remaining funds to fund Energy and Bulk Fuel projects consistent with a needs-based list established in partnership with the State of Alaska. Mertarvik, Shishmaref, Shaktoolik and Kivalina In FY 2020 the Commission will continue to provide support to these communities by funding the relocation coordinator positions. These coordinators will assist the communities in applying for grants and coordinating relocation efforts. Program Development The $400,000 referenced above for this line item in the Workplan will be used to fund the ETC Grant Writing Center of Excellence at the Alaska Native Tribal Health Consortium. Chad Stovall, Chief Operating Officer. [FR Doc. 2019–16914 Filed 8–6–19; 8:45 am] BILLING CODE 3300–01–P DEPARTMENT OF EDUCATION Applications for New Awards; Technical Assistance and Dissemination To Improve Services and Results for Children With Disabilities—Technical Assistance and Dissemination Center for the Development and Implementation of High-Quality Instruction, Interventions, and Services for Children With Disabilities Office of Special Education and Rehabilitative Services, Department of Education. ACTION: Notice. jspears on DSK3GMQ082PROD with NOTICES AGENCY: The mission of the Office of Special Education and Rehabilitative Services (OSERS) is to improve early childhood, educational, and SUMMARY: VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 employment outcomes and raise expectations for all people with disabilities, their families, their communities, and the Nation. As such, the Department of Education (Department) is issuing a notice inviting applications for new awards for fiscal year (FY) 2019 for a Technical Assistance and Dissemination Center for the Development and Implementation of High-Quality Instruction, Interventions, and Services for Children with Disabilities, Catalog of Federal Domestic Assistance (CFDA) number 84.326C. This Center will develop knowledge, curate resources, and disseminate information related to (1) enabling children with disabilities to make progress toward meeting challenging goals and objectives in light of each child’s circumstances, and (2) supporting local educational agencies (LEAs), charter management organizations (CMOs), private school associations, and schools in developing and implementing high-quality individualized educational programming. This notice relates to the approved information collection under OMB control number 1820–0028. DATES: Applications Available: August 7, 2019. Deadline for Transmittal of Applications: September 6, 2019. Pre-Application Webinar Information: No later than August 12, 2019, OSERS will post pre-recorded informational webinars designed to provide technical assistance to interested applicants. The webinars may be found at www2.ed.gov/ fund/grant/apply/osep/new-osepgrants.html. Pre-Application Q & A Blog: No later than August 12, 2019, OSERS will open a blog where interested applicants may post questions about the application requirements for this competition and where OSERS will post answers to the questions received. OSERS will not respond to questions unrelated to the application requirements for this competition. The blog may be found at www2.ed.gov/fund/grant/apply/osep/ new-osep-grants.html and will remain open until August 26, 2019. After the blog closes, applicants should direct questions to the person listed under FOR FURTHER INFORMATION CONTACT. ADDRESSES: For the addresses for obtaining and submitting an application, please refer to our Common Instructions for Applicants to Department of Education Discretionary Grant Programs, published in the Federal Register on February 13, 2019 (84 FR 3768), and available at PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 www.govinfo.gov/content/pkg/FR-201902-13/pdf/2019-02206.pdf. FOR FURTHER INFORMATION CONTACT: David E. Emenheiser, U.S. Department of Education, 400 Maryland Avenue SW, Room 5134, Potomac Center Plaza, Washington, DC 20202–5076. Telephone: (202) 245–7556. Email: David.Emenheiser@ed.gov. If you use a telecommunications device for the deaf (TDD) or a text telephone (TTY), call the Federal Relay Service (FRS), toll free, at 1–800–877– 8339. SUPPLEMENTARY INFORMATION: Full Text of Announcement I. Funding Opportunity Description Purpose of Program: The purpose of the Technical Assistance and Dissemination to Improve Services and Results for Children with Disabilities program is to promote academic achievement and to improve results for children with disabilities by providing TA, supporting model demonstration projects, disseminating useful information, and implementing activities that are supported by scientifically based research. Priority: This competition includes one absolute priority. In accordance with 34 CFR 75.105(b)(2)(v), this priority is from allowable activities specified in the statute (see sections 663 and 681(d) of the Individuals with Disabilities Education Act (IDEA); 20 U.S.C. 1463 and 1481(d)). Absolute Priority: For FY 2019 and any subsequent year in which we make awards from the list of unfunded applications from this competition, this priority is an absolute priority. Under 34 CFR 75.105(c)(3), we consider only applications that meet this priority. This priority is: Technical Assistance and Dissemination Center for the Development and Implementation of High-Quality Instruction, Interventions, and Services for Children with Disabilities (Center). Background: The Individuals with Disabilities Education Act (IDEA) entitles all eligible children with disabilities to a free appropriate public education (FAPE) that emphasizes special education and related services designed to meet their unique needs and prepare them for further education, employment, and independent living. (20 U.S.C. 1400(d)(1)(A)). The individualized education program (IEP) is the primary vehicle through which FAPE is delivered to those eligible children and is the foundation for each E:\FR\FM\07AUN1.SGM 07AUN1

Agencies

[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38604-38606]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16914]


=======================================================================
-----------------------------------------------------------------------

DENALI COMMISSION


Denali Commission Fiscal Year 2020 Draft Work Plan

AGENCY: Denali Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: The Denali Commission (Commission) is an independent Federal 
agency based on an innovative federal-state partnership designed to 
provide critical utilities, infrastructure and support for economic 
development and training in Alaska by delivering federal services in 
the most cost-effective manner possible. The Commission was created in 
1998 with passage of the October 21, 1998 Denali Commission Act (Act). 
The Act requires that the Commission develop proposed work plans for 
future spending and that the annual work plan be published in the 
Federal Register, providing an opportunity for a 30-day period of 
public review and written comment. This Federal Register notice serves 
to announce the 30-day opportunity for public comment on the Denali 
Commission Draft Work Plan for Federal Fiscal Year 2020 (FY 2020).

DATES: Comments and related material to be received by September 2, 
2019.

ADDRESSES: Submit comments to the Denali Commission, Attention: Elinda 
Hetami, 510 L Street, Suite 410, Anchorage, AK 99501.

FOR FURTHER INFORMATION CONTACT: Elinda Hetami, Denali Commission, 510 
L Street, Suite 410, Anchorage, AK 99501. Telephone: (907) 271-3415. 
Email: [email protected].

SUPPLEMENTARY INFORMATION: Background: The Denali Commission's mission 
is to partner with tribal, federal, state, and local governments and 
collaborate with all Alaskans to improve the effectiveness and 
efficiency of government services, to build and ensure the operation 
and maintenance of Alaska's basic infrastructure, and to develop a 
well-trained labor force employed in a diversified and sustainable 
economy.
    By creating the Commission, Congress mandated that all parties 
involved partner together to find new and innovative solutions to the 
unique infrastructure and economic development challenges in America's 
most remote communities. Pursuant to the Act, the Commission determines 
its own basic operating principles and funding criteria on an annual 
federal fiscal year (October 1 to September 30) basis. The Commission 
outlines these priorities and funding recommendations in an annual work 
plan. The FY 2020 Work Plan was developed in the following manner.
     A workgroup comprised of Denali Commissioners and 
Commission staff developed a preliminary draft work plan.
     The preliminary draft work plan was published on 
Denali.gov for review by the public in advance of public testimony.
     A public hearing was held to record public comments and 
recommendations on the preliminary draft work plan.
     Written comments on the preliminary draft work plan were 
accepted for another ten days after the public hearing.
     All public hearing comments and written comments were 
provided to Commissioners for their review and consideration.
     Commissioners discussed the preliminary draft work plan in 
a public meeting and then voted on the work plan during the meeting.
     The Commissioners forwarded their recommended work plan to 
the Federal Co-Chair, who then prepared the draft work plan for 
publication in the Federal Register providing a 30-day period for 
public review and written comment. During this time, the draft work 
plan will also be disseminated to Commission program partners 
including, but not limited to, the Bureau of Indian Affairs (BIA), the 
Economic Development Administration (EDA), Department of Agriculture--
Rural Utilities Service (USDA/RUS), and the State of Alaska.
     At the conclusion of the Federal Register Public comment 
period Commission staff provides the Federal Co-Chair with a summary of 
public comments and recommendations, if any, on the draft work plan.
     If no revisions are made to the draft, the Federal Co-
Chair provides notice of approval of the work plan to the 
Commissioners, and forwards the work plan to the Secretary of Commerce 
for approval; or, if there are revisions the Federal Co-Chair provides 
notice of modifications to the Commissioners for their consideration 
and approval, and upon receipt of approval from Commissioners, forwards 
the work plan to the Secretary of Commerce for approval.
     The Secretary of Commerce approves the work plan.
     The Federal Co-Chair then approves grants and contracts 
based upon the approved work plan.

FY 2020 Appropriations Summary

    The Commission has historically received federal funding from 
several sources. The two primary sources at this time include the 
Energy & Water Appropriation Bill (``base'' or ``discretionary'' funds) 
and an annual allocation from the Trans-Alaska Pipeline Liability 
(TAPL) fund. The proposed FY 2020 Work Plan assumes the Commission will 
receive $15,000,000 of base funds, which is the

[[Page 38605]]

amount referenced in the reauthorization of the Commission passed by 
Congress in 2016 (ref: Pub. L. 114-322), and a $2,917,000 TAPL 
allocation based on discussions with the Office of Management and 
Budget (OMB). Approximately $2,500,000 of the base funds will be used 
for administrative expenses and non-project program support, leaving 
$12,500,000 available for program activities. The total base funding 
shown in the Work Plan also includes an amount typically available from 
project closeouts and other de-obligations that occur in any given 
year. Approximately $117,000 of the TAPL funds will be utilized for 
administrative expenses and non-project program support, leaving 
$2,800,000 available for program activities. Absent any new specific 
direction or limitations provided by Congress in the current Energy & 
Water Appropriations Bill, these funding sources are governed by the 
following general principles, either by statute or by language in the 
Work Plan itself:
     Funds from the Energy & Water Appropriation are eligible 
for use in all programs.
     TAPL funds can only be used for bulk fuel related projects 
and activities.
     Appropriated funds may be reduced due to Congressional 
action, rescissions by OMB, and other federal agency actions.
     All Energy & Water and TAPL investment amounts identified 
in the work plan, are ``up to'' amounts, and may be reassigned to other 
programs included in the current year work plan, if they are not fully 
expended in a program component area or a specific project.
     Energy & Water and TAPL funds set aside for administrative 
expenses that subsequently become available, may be used for program 
activities included in the current year work plan.

------------------------------------------------------------------------
                Denali Commission FY2020 funding summary
-------------------------------------------------------------------------
                                                           Available for
                         Source                               program
                                                            activities
------------------------------------------------------------------------
Energy & Water Funds:
    FY 2020 Energy & Water Appropriation \1\............     $12,500,000
    Prior Year Funds....................................       2,000,000
                                                         ---------------
        Subtotal........................................      14,500,000
TAPL Funds:
    FY 2020 Annual Allocation...........................       2,800,000
                                                         ---------------
        Grand Total.....................................      17,300,000
------------------------------------------------------------------------
Notes:
\1.\ If the final appropriation is less than $15 million the Federal Co-
  Chair shall reduce investments to balance the FY 2020 Work Plan.


----------------------------------------------------------------------------------------------------------------
                                                                       Base            TAPL            Total
----------------------------------------------------------------------------------------------------------------
Energy Reliability and Security:
    Diesel Power Plants and Interties...........................      $3,800,000  ..............      $3,800,000
    Wind, Hydro, Biomass, Other Proven Renewables and Emerging         1,000,000  ..............       1,000,000
     Technologies...............................................
    Audits, TA, & Community Energy Efficiency Improvements......         500,000  ..............         500,000
    RPSU Maintenance and Improvement Projects...................       1,200,000  ..............       1,200,000
                                                                 -----------------------------------------------
        Subtotal................................................       6,500,000  ..............       6,500,000
Bulk Fuel Safety and Security:
    New/Refurbished Facilities..................................  ..............      $1,500,000       1,500,000
    Maintenance and Improvement Projects........................  ..............         700,000         700,000
                                                                 -----------------------------------------------
        Subtotal................................................               0       2,200,000       2,200,000
Village Infrastructure Protection:
    Mertarvik...................................................         150,000  ..............         150,000
    Shishmaref..................................................         150,000  ..............         150,000
    Shaktoolik..................................................         150,000  ..............         150,000
    Kivalina....................................................         150,000  ..............         150,000
    Program Support.............................................         400,000  ..............         400,000
                                                                 -----------------------------------------------
        Subtotal................................................       1,000,000  ..............       1,000,000
Transportation..................................................       1,000,000  ..............       1,000,000
Sanitation:
    Village Water, Wastewater and Solid Waste...................       2,000,000  ..............       2,000,000
                                                                 -----------------------------------------------
        Subtotal................................................       2,000,000  ..............       2,000,000
Health Facilities...............................................       1,000,000  ..............       1,000,000
Housing.........................................................         500,000  ..............         500,000
Broadband.......................................................       1,000,000  ..............       1,000,000
Workforce Development:
    Energy and Bulk Fuel........................................         500,000         600,000       1,100,000
    Other.......................................................       1,000,000  ..............       1,000,000
                                                                 -----------------------------------------------
        Subtotal................................................       1,500,000         600,000       2,100,000
                                                                 -----------------------------------------------
            Totals..............................................      14,500,000       2,800,000      17,300,000
----------------------------------------------------------------------------------------------------------------


[[Page 38606]]

Energy, Bulk Fuel, Transportation, Sanitation, Health Facilities, 
Housing, Broadband, Workforce Development

    In FY 2020 the Commission is moving in a new direction to work 
closely with other Federal Agencies, the State of Alaska and regional/
local entities with the goal of identifying projects with funding gaps 
that will allow the Commission to use its small amount of funding to 
move forward a large number of projects. The Commission has already 
begun to have conversations with many of our Federal partners and 
intends to prioritize shovel-ready projects where the Commission can 
leverage its funds. If the Commission is unable to fully utilize its 
funding by April of 2020 then it will use any remaining funds to fund 
Energy and Bulk Fuel projects consistent with a needs-based list 
established in partnership with the State of Alaska.

Mertarvik, Shishmaref, Shaktoolik and Kivalina

    In FY 2020 the Commission will continue to provide support to these 
communities by funding the relocation coordinator positions. These 
coordinators will assist the communities in applying for grants and 
coordinating relocation efforts.

Program Development

    The $400,000 referenced above for this line item in the Workplan 
will be used to fund the ETC Grant Writing Center of Excellence at the 
Alaska Native Tribal Health Consortium.

Chad Stovall,
Chief Operating Officer.
[FR Doc. 2019-16914 Filed 8-6-19; 8:45 am]