Download as PDF Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices Date: Wednesday, August 28, 2019. Time: 10:00 a.m. Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493. Phone: (207) 732–4270. acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n of this document. Evening Scoping Meeting Meeting Procedures Date: Wednesday, August 28, 2019. Time: 6:00 p.m. Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493. Phone: (207) 732–4270. SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the web at https://www.ferc.gov, using the eLibrary link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. The meetings will be recorded by a stenographer and will be placed in the public records of the project. addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting Environmental Site Review The licensee and Commission staff will conduct an environmental site review of the project on Tuesday, August 27, 2019, starting at 1:00 p.m. All participants should meet at the project, located at 94 Dam Road, West Enfield, ME 04493. If you plan to attend the environmental site review, please contact Randy Dorman of Brookfield Renewable at (207) 755–5605, or via email at Randy.Dorman@ BrookfieldRenewable.com on or before August 19, 2019, and indicate how many participants will be attending with you. jspears on DSK3GMQ082PROD with NOTICES Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 Dated: July 30, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16847 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2513–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Wilton Wind Energy II, LLC This is a supplemental notice in the above-referenced Wilton Wind Energy II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 21, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 38619 must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16845 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP19–1056–001. Applicants: Boardwalk Storage Company, LLC. Description: Compliance filing Compliance Filing in Docket No. RP19– 1056–000 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5031. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1057–001. Applicants: Texas Gas Transmission, LLC. Description: Compliance filing Compliance Filing in Docket No. RP19– 1057–000 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5033. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1062–001. Applicants: Gulf South Pipeline Company, LP. Description: Compliance filing Compliance Filing in Docket No. RP19– 1062–000 to be effective 8/1/2019. E:\FR\FM\07AUN1.SGM 07AUN1 jspears on DSK3GMQ082PROD with NOTICES 38620 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices Filed Date: 7/31/19. Accession Number: 20190731–5029. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1072–001. Applicants: Gulf Crossing Pipeline Company LLC. Description: Compliance filing Compliance Filing in Docket No. RP19– 1072–000 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5030. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1411–000. Applicants: NEXUS Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Columbia Gas 860005 Aug 1 releases to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5002. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1412–000. Applicants: Great Lakes Gas Transmission Limited Partnership. Description: Compliance filing SemiAnnual Transporter’s Use Report July 2019. Filed Date: 7/31/19. Accession Number: 20190731–5004. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1413–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Negotiable Provisions to be effective 8/ 31/2019. Filed Date: 7/31/19. Accession Number: 20190731–5024. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1414–000. Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rate & Exhibit B Update (FPL Sanford) to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5025. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1415–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 to various shippers eff 8–1–2019) to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5026. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1416–000. Applicants: Gulf South Pipeline Company, LP. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon 37657, 50488 to Scona 51400, 51393) to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5027. Comments Due: 5 p.m. ET 8/12/19. VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 Docket Numbers: RP19–1417–000. Applicants: Ruby Pipeline, L.L.C. Description: § 4(d) Rate Filing: FLU and EPC Recomputation Filing to be effective 9/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5042. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1418–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Amendment to Negotiated Rate Agreement-Macquarie Energy to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5045. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1419–000. Applicants: Dauphin Island Gathering Partners. Description: § 4(d) Rate Filing: Negotiated Rate Filing Chevron 7–31– 2019 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5046. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1420–000. Applicants: Florida Southeast Connection, LLC. Description: Compliance filing Order No. 587–Y Compliance Filing to be effective 7/31/2019. Filed Date: 7/31/19. Accession Number: 20190731–5058. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1421–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: Compliance filing Flow Through of Dominion Penalty Sharing 2019. Filed Date: 7/31/19. Accession Number: 20190731–5059. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1422–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—NStar release to BP 799653 eff 8–1–19 to be effective 8/1/ 2019. Filed Date: 7/31/19. Accession Number: 20190731–5060. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1423–000. Applicants: Wyoming Interstate Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreement Filing (#215882–FTWIC Castleton Commodities) to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5061. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1424–000. Applicants: Kern River Gas Transmission Company. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Description: § 4(d) Rate Filing: 2019 Concord Amendment to be effective 8/ 1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5063. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1425–000. Applicants: Wyoming Interstate Company, L.L.C. Description: § 4(d) Rate Filing: Fuel and L&U Reimbursement Percentage Update to be effective 9/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5064. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1426–000. Applicants: National Fuel Gas Supply Corporation. Description: § 4(d) Rate Filing: National Fuel Rate Case (eFiled 07/31/ 19) to be effective 9/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5067. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1427–000. Applicants: Gulf Crossing Pipeline Company LLC. Description: § 4(d) Rate Filing: Remove Expired and Terminated Agreements from Tariff to be effective 8/ 1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5076. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1428–000. Applicants: Dominion Energy Transmission, Inc. Description: § 4(d) Rate Filing: DETI— July 31, 2019 Gas Processing Provisions to be effective 9/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5103. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1429–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–07–31 Six One Commodities to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5165. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1430–000. Applicants: ETC Tiger Pipeline, LLC. Description: § 4(d) Rate Filing: Assignment of Petrohawk Agreement to BP Energy to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5184. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1431–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: Neg Rate 2019–07–31–19 5 sharing Ks to be effective 8/1/2019. Filed Date: 7/31/19. E:\FR\FM\07AUN1.SGM 07AUN1 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices Accession Number: 20190731–5200. Comments Due: 5 p.m. ET 8/12/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16851 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF19–4–000] jspears on DSK3GMQ082PROD with NOTICES Venture Global Delta LNG, LLC and Venture Global Delta Express, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Delta LNG and Delta Express Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Session The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Delta LNG and Delta Express Pipeline Project (Project) involving construction and operation of facilities by Venture Global Delta LNG, LLC and Venture Global Delta Express, LLC (collectively referred to as Delta LNG) in Plaquemines, Richland, Franklin, Catahoula, Concordia, Avoyelles, St. Landry, Pointe Coupee, West Baton Rouge, Iberville, Ascension, Assumption, Lafourche, and Jefferson Parishes, Louisiana. The Commission will use this EIS in its decision-making process to determine whether the Project is in the public interest and public convenience and necessity. VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies about issues regarding the Project. The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from its action whenever it considers the issuance of an authorization. NEPA also requires the Commission to discover concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EIS on the important environmental issues. By this notice, the Commission requests public comments on the scope of issues to address in the EIS. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. Eastern Time on August 29, 2019. You can make a difference by submitting your specific comments or concerns about the Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. Your input will help the Commission staff determine what issues they need to evaluate in the EIS. Commission staff will consider all comments received during the preparation of the EIS. If you sent comments on this Project to the Commission before the opening of this docket on April 30, 2019 you will need to file those comments in Docket No. PF19–4–000 to ensure they are considered as part of this proceeding. This notice is being sent to the Commission’s current environmental mailing list for this Project. State and local government representatives should notify their constituents of this planned Project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable pipeline easement agreement. You are not required to enter into an agreement. However, if the Commission approves the pipeline, that approval conveys with it the right of eminent domain. Therefore, if you and the company do not reach an easement agreement, the pipeline company could initiate condemnation proceedings in court. In such instances, compensation would be determined by a judge in accordance with state law. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 38621 A document prepared by the FERC entitled An Interstate Natural Gas Facility On My Land? What Do I Need To Know? is available for viewing on the FERC website (www.ferc.gov) at https://www.ferc.gov/resources/guides/ gas/gas.pdf. This document addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. Public Participation The Commission offers a free service called eSubscription which makes it easy to stay informed of all issuances and submittals regarding the dockets/ projects to which you subscribe. These instant email notifications are the fastest way to receive notification and provide a link to the document files which can reduce the amount of time you spend researching proceedings. To sign up go to www.ferc.gov/docs-filing/ esubscription.asp. For your convenience, there are four methods you can use to submit your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208–3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded. (1) You can file your comments electronically using the eComment feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. Using eComment is an easy method for submitting brief, text-only comments on a project; (2) You can file your comments electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. You will be asked to select the type of filing you are making; a comment on a particular project is considered a Comment on a Filing; or (3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the Project docket number (PF19–4–000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. (4) In lieu of sending written comments, the Commission invites you to attend one of the public scoping E:\FR\FM\07AUN1.SGM 07AUN1

Agencies

[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38619-38621]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16851]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP19-1056-001.
    Applicants: Boardwalk Storage Company, LLC.
    Description: Compliance filing Compliance Filing in Docket No. 
RP19-1056-000 to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5031.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1057-001.
    Applicants: Texas Gas Transmission, LLC.
    Description: Compliance filing Compliance Filing in Docket No. 
RP19-1057-000 to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5033.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1062-001.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Compliance filing Compliance Filing in Docket No. 
RP19-1062-000 to be effective 8/1/2019.

[[Page 38620]]

    Filed Date: 7/31/19.
    Accession Number: 20190731-5029.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1072-001.
    Applicants: Gulf Crossing Pipeline Company LLC.
    Description: Compliance filing Compliance Filing in Docket No. 
RP19-1072-000 to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5030.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1411-000.
    Applicants: NEXUS Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rates--Columbia Gas 
860005 Aug 1 releases to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5002.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1412-000.
    Applicants: Great Lakes Gas Transmission Limited Partnership.
    Description: Compliance filing Semi-Annual Transporter's Use Report 
July 2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5004.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1413-000.
    Applicants: Equitrans, L.P.
    Description: Sec.  4(d) Rate Filing: Negotiable Provisions to be 
effective 8/31/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5024.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1414-000.
    Applicants: Florida Gas Transmission Company, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate & Exhibit B 
Update (FPL Sanford) to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5025.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1415-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts 
(Atlanta Gas 8438 to various shippers eff 8-1-2019) to be effective 8/
1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5026.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1416-000.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Sec.  4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon 
37657, 50488 to Scona 51400, 51393) to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5027.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1417-000.
    Applicants: Ruby Pipeline, L.L.C.
    Description: Sec.  4(d) Rate Filing: FLU and EPC Recomputation 
Filing to be effective 9/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5042.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1418-000.
    Applicants: Natural Gas Pipeline Company of America.
    Description: Sec.  4(d) Rate Filing: Amendment to Negotiated Rate 
Agreement-Macquarie Energy to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5045.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1419-000.
    Applicants: Dauphin Island Gathering Partners.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Filing Chevron 
7-31-2019 to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5046.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1420-000.
    Applicants: Florida Southeast Connection, LLC.
    Description: Compliance filing Order No. 587-Y Compliance Filing to 
be effective 7/31/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5058.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1421-000.
    Applicants: Transcontinental Gas Pipe Line Company, LLC.
    Description: Compliance filing Flow Through of Dominion Penalty 
Sharing 2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5059.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1422-000.
    Applicants: Algonquin Gas Transmission, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rates--NStar 
release to BP 799653 eff 8-1-19 to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5060.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1423-000.
    Applicants: Wyoming Interstate Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Agreement 
Filing (#215882-FTWIC Castleton Commodities) to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5061.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1424-000.
    Applicants: Kern River Gas Transmission Company.
    Description: Sec.  4(d) Rate Filing: 2019 Concord Amendment to be 
effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5063.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1425-000.
    Applicants: Wyoming Interstate Company, L.L.C.
    Description: Sec.  4(d) Rate Filing: Fuel and L&U Reimbursement 
Percentage Update to be effective 9/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5064.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1426-000.
    Applicants: National Fuel Gas Supply Corporation.
    Description: Sec.  4(d) Rate Filing: National Fuel Rate Case 
(eFiled 07/31/19) to be effective 9/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5067.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1427-000.
    Applicants: Gulf Crossing Pipeline Company LLC.
    Description: Sec.  4(d) Rate Filing: Remove Expired and Terminated 
Agreements from Tariff to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5076.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1428-000.
    Applicants: Dominion Energy Transmission, Inc.
    Description: Sec.  4(d) Rate Filing: DETI--July 31, 2019 Gas 
Processing Provisions to be effective 9/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5103.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1429-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2019-07-31 Six One 
Commodities to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5165.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1430-000.
    Applicants: ETC Tiger Pipeline, LLC.
    Description: Sec.  4(d) Rate Filing: Assignment of Petrohawk 
Agreement to BP Energy to be effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5184.
    Comments Due: 5 p.m. ET 8/12/19.

    Docket Numbers: RP19-1431-000.
    Applicants: Trailblazer Pipeline Company LLC.
    Description: Sec.  4(d) Rate Filing: Neg Rate 2019-07-31-19 5 
sharing Ks to be effective 8/1/2019.
    Filed Date: 7/31/19.

[[Page 38621]]

    Accession Number: 20190731-5200.
    Comments Due: 5 p.m. ET 8/12/19.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 1, 2019.
Kimberly D. Bose,
Secretary.