Combined Notice of Filings, 38619-38621 [2019-16851]
Download as PDF
Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices
Date: Wednesday, August 28, 2019.
Time: 10:00 a.m.
Location: Enfield Town Office, 789
Hammett Road, Enfield, ME 04493.
Phone: (207) 732–4270.
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n of this document.
Evening Scoping Meeting
Meeting Procedures
Date: Wednesday, August 28, 2019.
Time: 6:00 p.m.
Location: Enfield Town Office, 789
Hammett Road, Enfield, ME 04493.
Phone: (207) 732–4270.
SD1, which outlines the subject areas
to be addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
eLibrary link. Follow the directions for
accessing information in paragraph n.
Based on all oral and written comments,
a Scoping Document 2 (SD2) may be
issued. SD2 may include a revised
process plan and schedule, as well as a
list of issues, identified through the
scoping process.
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Environmental Site Review
The licensee and Commission staff
will conduct an environmental site
review of the project on Tuesday,
August 27, 2019, starting at 1:00 p.m.
All participants should meet at the
project, located at 94 Dam Road, West
Enfield, ME 04493.
If you plan to attend the
environmental site review, please
contact Randy Dorman of Brookfield
Renewable at (207) 755–5605, or via
email at Randy.Dorman@
BrookfieldRenewable.com on or before
August 19, 2019, and indicate how
many participants will be attending
with you.
jspears on DSK3GMQ082PROD with NOTICES
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
VerDate Sep<11>2014
16:49 Aug 06, 2019
Jkt 247001
Dated: July 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16847 Filed 8–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2513–000]
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization: Wilton Wind Energy II,
LLC
This is a supplemental notice in the
above-referenced Wilton Wind Energy
II, LLC’s application for market-based
rate authority, with an accompanying
rate tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 21,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
38619
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: August 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16845 Filed 8–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1056–001.
Applicants: Boardwalk Storage
Company, LLC.
Description: Compliance filing
Compliance Filing in Docket No. RP19–
1056–000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5031.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1057–001.
Applicants: Texas Gas Transmission,
LLC.
Description: Compliance filing
Compliance Filing in Docket No. RP19–
1057–000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5033.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1062–001.
Applicants: Gulf South Pipeline
Company, LP.
Description: Compliance filing
Compliance Filing in Docket No. RP19–
1062–000 to be effective 8/1/2019.
E:\FR\FM\07AUN1.SGM
07AUN1
jspears on DSK3GMQ082PROD with NOTICES
38620
Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices
Filed Date: 7/31/19.
Accession Number: 20190731–5029.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1072–001.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: Compliance filing
Compliance Filing in Docket No. RP19–
1072–000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5030.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1411–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Columbia Gas 860005
Aug 1 releases to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5002.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1412–000.
Applicants: Great Lakes Gas
Transmission Limited Partnership.
Description: Compliance filing SemiAnnual Transporter’s Use Report July
2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5004.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1413–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiable Provisions to be effective 8/
31/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5024.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1414–000.
Applicants: Florida Gas Transmission
Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate & Exhibit B Update
(FPL Sanford) to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5025.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1415–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Atlanta Gas 8438
to various shippers eff 8–1–2019) to be
effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5026.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1416–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Aethon 37657,
50488 to Scona 51400, 51393) to be
effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5027.
Comments Due: 5 p.m. ET 8/12/19.
VerDate Sep<11>2014
16:49 Aug 06, 2019
Jkt 247001
Docket Numbers: RP19–1417–000.
Applicants: Ruby Pipeline, L.L.C.
Description: § 4(d) Rate Filing: FLU
and EPC Recomputation Filing to be
effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5042.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1418–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amendment to Negotiated Rate
Agreement-Macquarie Energy to be
effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5045.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1419–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing Chevron 7–31–
2019 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5046.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1420–000.
Applicants: Florida Southeast
Connection, LLC.
Description: Compliance filing Order
No. 587–Y Compliance Filing to be
effective 7/31/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5058.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1421–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing Flow
Through of Dominion Penalty Sharing
2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5059.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1422–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—NStar release to BP
799653 eff 8–1–19 to be effective 8/1/
2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5060.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1423–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Filing
(#215882–FTWIC Castleton
Commodities) to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5061.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1424–000.
Applicants: Kern River Gas
Transmission Company.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Description: § 4(d) Rate Filing: 2019
Concord Amendment to be effective 8/
1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5063.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1425–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel
and L&U Reimbursement Percentage
Update to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5064.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1426–000.
Applicants: National Fuel Gas Supply
Corporation.
Description: § 4(d) Rate Filing:
National Fuel Rate Case (eFiled 07/31/
19) to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5067.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1427–000.
Applicants: Gulf Crossing Pipeline
Company LLC.
Description: § 4(d) Rate Filing:
Remove Expired and Terminated
Agreements from Tariff to be effective 8/
1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5076.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1428–000.
Applicants: Dominion Energy
Transmission, Inc.
Description: § 4(d) Rate Filing: DETI—
July 31, 2019 Gas Processing Provisions
to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5103.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1429–000.
Applicants: Rockies Express Pipeline
LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–07–31 Six One Commodities
to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5165.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1430–000.
Applicants: ETC Tiger Pipeline, LLC.
Description: § 4(d) Rate Filing:
Assignment of Petrohawk Agreement to
BP Energy to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5184.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1431–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: § 4(d) Rate Filing: Neg
Rate 2019–07–31–19 5 sharing Ks to be
effective 8/1/2019.
Filed Date: 7/31/19.
E:\FR\FM\07AUN1.SGM
07AUN1
Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices
Accession Number: 20190731–5200.
Comments Due: 5 p.m. ET 8/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16851 Filed 8–6–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF19–4–000]
jspears on DSK3GMQ082PROD with NOTICES
Venture Global Delta LNG, LLC and
Venture Global Delta Express, LLC;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Planned Delta LNG and Delta
Express Pipeline Project, Request for
Comments on Environmental Issues,
and Notice of Public Scoping Session
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Delta LNG and Delta
Express Pipeline Project (Project)
involving construction and operation of
facilities by Venture Global Delta LNG,
LLC and Venture Global Delta Express,
LLC (collectively referred to as Delta
LNG) in Plaquemines, Richland,
Franklin, Catahoula, Concordia,
Avoyelles, St. Landry, Pointe Coupee,
West Baton Rouge, Iberville, Ascension,
Assumption, Lafourche, and Jefferson
Parishes, Louisiana. The Commission
will use this EIS in its decision-making
process to determine whether the
Project is in the public interest and
public convenience and necessity.
VerDate Sep<11>2014
16:49 Aug 06, 2019
Jkt 247001
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the Project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of an
authorization. NEPA also requires the
Commission to discover concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EIS on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of issues to
address in the EIS. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on August 29, 2019.
You can make a difference by
submitting your specific comments or
concerns about the Project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EIS. Commission staff
will consider all comments received
during the preparation of the EIS.
If you sent comments on this Project
to the Commission before the opening of
this docket on April 30, 2019 you will
need to file those comments in Docket
No. PF19–4–000 to ensure they are
considered as part of this proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this Project. State and
local government representatives should
notify their constituents of this planned
Project and encourage them to comment
on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
planned facilities. The company would
seek to negotiate a mutually acceptable
pipeline easement agreement. You are
not required to enter into an agreement.
However, if the Commission approves
the pipeline, that approval conveys with
it the right of eminent domain.
Therefore, if you and the company do
not reach an easement agreement, the
pipeline company could initiate
condemnation proceedings in court. In
such instances, compensation would be
determined by a judge in accordance
with state law.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
38621
A document prepared by the FERC
entitled An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know? is available for viewing on
the FERC website (www.ferc.gov) at
https://www.ferc.gov/resources/guides/
gas/gas.pdf. This document addresses a
number of typically asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings.
Public Participation
The Commission offers a free service
called eSubscription which makes it
easy to stay informed of all issuances
and submittals regarding the dockets/
projects to which you subscribe. These
instant email notifications are the fastest
way to receive notification and provide
a link to the document files which can
reduce the amount of time you spend
researching proceedings. To sign up go
to www.ferc.gov/docs-filing/
esubscription.asp.
For your convenience, there are four
methods you can use to submit your
comments to the Commission. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. Using eComment is an easy
method for submitting brief, text-only
comments on a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
eRegister. You will be asked to select the
type of filing you are making; a
comment on a particular project is
considered a Comment on a Filing; or
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the Project docket number (PF19–4–000)
with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
(4) In lieu of sending written
comments, the Commission invites you
to attend one of the public scoping
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38619-38621]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16851]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19-1056-001.
Applicants: Boardwalk Storage Company, LLC.
Description: Compliance filing Compliance Filing in Docket No.
RP19-1056-000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5031.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1057-001.
Applicants: Texas Gas Transmission, LLC.
Description: Compliance filing Compliance Filing in Docket No.
RP19-1057-000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5033.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1062-001.
Applicants: Gulf South Pipeline Company, LP.
Description: Compliance filing Compliance Filing in Docket No.
RP19-1062-000 to be effective 8/1/2019.
[[Page 38620]]
Filed Date: 7/31/19.
Accession Number: 20190731-5029.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1072-001.
Applicants: Gulf Crossing Pipeline Company LLC.
Description: Compliance filing Compliance Filing in Docket No.
RP19-1072-000 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5030.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1411-000.
Applicants: NEXUS Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--Columbia Gas
860005 Aug 1 releases to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5002.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1412-000.
Applicants: Great Lakes Gas Transmission Limited Partnership.
Description: Compliance filing Semi-Annual Transporter's Use Report
July 2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5004.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1413-000.
Applicants: Equitrans, L.P.
Description: Sec. 4(d) Rate Filing: Negotiable Provisions to be
effective 8/31/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5024.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1414-000.
Applicants: Florida Gas Transmission Company, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rate & Exhibit B
Update (FPL Sanford) to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5025.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1415-000.
Applicants: Gulf South Pipeline Company, LP.
Description: Sec. 4(d) Rate Filing: Cap Rel Neg Rate Agmts
(Atlanta Gas 8438 to various shippers eff 8-1-2019) to be effective 8/
1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5026.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1416-000.
Applicants: Gulf South Pipeline Company, LP.
Description: Sec. 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Aethon
37657, 50488 to Scona 51400, 51393) to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5027.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1417-000.
Applicants: Ruby Pipeline, L.L.C.
Description: Sec. 4(d) Rate Filing: FLU and EPC Recomputation
Filing to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5042.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1418-000.
Applicants: Natural Gas Pipeline Company of America.
Description: Sec. 4(d) Rate Filing: Amendment to Negotiated Rate
Agreement-Macquarie Energy to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5045.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1419-000.
Applicants: Dauphin Island Gathering Partners.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Filing Chevron
7-31-2019 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5046.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1420-000.
Applicants: Florida Southeast Connection, LLC.
Description: Compliance filing Order No. 587-Y Compliance Filing to
be effective 7/31/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5058.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1421-000.
Applicants: Transcontinental Gas Pipe Line Company, LLC.
Description: Compliance filing Flow Through of Dominion Penalty
Sharing 2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5059.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1422-000.
Applicants: Algonquin Gas Transmission, LLC.
Description: Sec. 4(d) Rate Filing: Negotiated Rates--NStar
release to BP 799653 eff 8-1-19 to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5060.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1423-000.
Applicants: Wyoming Interstate Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Negotiated Rate Agreement
Filing (#215882-FTWIC Castleton Commodities) to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5061.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1424-000.
Applicants: Kern River Gas Transmission Company.
Description: Sec. 4(d) Rate Filing: 2019 Concord Amendment to be
effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5063.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1425-000.
Applicants: Wyoming Interstate Company, L.L.C.
Description: Sec. 4(d) Rate Filing: Fuel and L&U Reimbursement
Percentage Update to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5064.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1426-000.
Applicants: National Fuel Gas Supply Corporation.
Description: Sec. 4(d) Rate Filing: National Fuel Rate Case
(eFiled 07/31/19) to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5067.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1427-000.
Applicants: Gulf Crossing Pipeline Company LLC.
Description: Sec. 4(d) Rate Filing: Remove Expired and Terminated
Agreements from Tariff to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5076.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1428-000.
Applicants: Dominion Energy Transmission, Inc.
Description: Sec. 4(d) Rate Filing: DETI--July 31, 2019 Gas
Processing Provisions to be effective 9/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5103.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1429-000.
Applicants: Rockies Express Pipeline LLC.
Description: Sec. 4(d) Rate Filing: Neg Rate 2019-07-31 Six One
Commodities to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5165.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1430-000.
Applicants: ETC Tiger Pipeline, LLC.
Description: Sec. 4(d) Rate Filing: Assignment of Petrohawk
Agreement to BP Energy to be effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5184.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19-1431-000.
Applicants: Trailblazer Pipeline Company LLC.
Description: Sec. 4(d) Rate Filing: Neg Rate 2019-07-31-19 5
sharing Ks to be effective 8/1/2019.
Filed Date: 7/31/19.
[[Page 38621]]
Accession Number: 20190731-5200.
Comments Due: 5 p.m. ET 8/12/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 1, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-16851 Filed 8-6-19; 8:45 am]
BILLING CODE 6717-01-P