Bangor-Pacific Hydro Associates; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests, 38618-38619 [2019-16847]

Download as PDF 38618 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE, Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the eLibrary link. Enter the docket number (i.e., CD19–10) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. Dated: August 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16846 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2600–087] jspears on DSK3GMQ082PROD with NOTICES Bangor-Pacific Hydro Associates; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Pre-filing Process. b. Project No.: 2600–087. c. Dated Filed: May 31, 2019. d. Submitted By: Bangor-Pacific Hydro Associates (BPHA). e. Name of Project: West Enfield Project. f. Location: On the Penobscot River in Penobscot County, Maine. The project does not occupy any federal land. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Randy Dorman, Brookfield Renewable, 150 Main Street, Lewiston, ME 04240; phone at (207) 755–5605, or email at Randy.Dorman@ brookfieldrenewable.com. i. FERC Contact: Erin Kimsey at (202) 502–8621 or email at erin.kimsey@ ferc.gov. VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94 FERC 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402; and (b) the Maine State Historic Preservation Officer (SHPO) and Penobscot Nation Tribal Historic Preservation Officer (THPO), as required by section 106 of the National Historic Preservation Act and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Bangor-Pacific Hydro Associates as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act, section 106 of the National Historic Preservation Act, and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act. m. Bangor-Pacific Hydro Associates filed with the Commission a PreApplication Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website (https:// www.ferc.gov), using the eLibrary link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). Copies are also available by request from Mr. Randy Dorman of Brookfield Renewable at (207) 755–5605 or via email at Randy.Dorman@ brookfieldrenewable.com. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, please contact FERC Online Support. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 o. With this notice, we are soliciting comments on the PAD and Commission staff’s Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P–2600–087. All filings with the Commission must bear the appropriate heading: Comments on Pre-Application Document, Study Requests, Comments on Scoping Document 1, Request for Cooperating Agency Status, or Communications to and from Commission Staff. Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so within 60 days of the date of this notice. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. The scoping process will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribe, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be E:\FR\FM\07AUN1.SGM 07AUN1 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices Date: Wednesday, August 28, 2019. Time: 10:00 a.m. Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493. Phone: (207) 732–4270. acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n of this document. Evening Scoping Meeting Meeting Procedures Date: Wednesday, August 28, 2019. Time: 6:00 p.m. Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493. Phone: (207) 732–4270. SD1, which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the web at https://www.ferc.gov, using the eLibrary link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. The meetings will be recorded by a stenographer and will be placed in the public records of the project. addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting Environmental Site Review The licensee and Commission staff will conduct an environmental site review of the project on Tuesday, August 27, 2019, starting at 1:00 p.m. All participants should meet at the project, located at 94 Dam Road, West Enfield, ME 04493. If you plan to attend the environmental site review, please contact Randy Dorman of Brookfield Renewable at (207) 755–5605, or via email at Randy.Dorman@ BrookfieldRenewable.com on or before August 19, 2019, and indicate how many participants will be attending with you. jspears on DSK3GMQ082PROD with NOTICES Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 Dated: July 30, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16847 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2513–000] Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization: Wilton Wind Energy II, LLC This is a supplemental notice in the above-referenced Wilton Wind Energy II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 21, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 38619 must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 1, 2019. Kimberly D. Bose, Secretary. [FR Doc. 2019–16845 Filed 8–6–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP19–1056–001. Applicants: Boardwalk Storage Company, LLC. Description: Compliance filing Compliance Filing in Docket No. RP19– 1056–000 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5031. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1057–001. Applicants: Texas Gas Transmission, LLC. Description: Compliance filing Compliance Filing in Docket No. RP19– 1057–000 to be effective 8/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5033. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1062–001. Applicants: Gulf South Pipeline Company, LP. Description: Compliance filing Compliance Filing in Docket No. RP19– 1062–000 to be effective 8/1/2019. E:\FR\FM\07AUN1.SGM 07AUN1

Agencies

[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38618-38619]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16847]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2600-087]


Bangor-Pacific Hydro Associates; Notice of Intent To File License 
Application, Filing of Pre-Application Document (PAD), Commencement of 
Pre-Filing Process, and Scoping; Request for Comments on the PAD and 
Scoping Document, and Identification of Issues and Associated Study 
Requests

    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Pre-filing Process.
    b. Project No.: 2600-087.
    c. Dated Filed: May 31, 2019.
    d. Submitted By: Bangor-Pacific Hydro Associates (BPHA).
    e. Name of Project: West Enfield Project.
    f. Location: On the Penobscot River in Penobscot County, Maine. The 
project does not occupy any federal land.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Randy Dorman, Brookfield Renewable, 
150 Main Street, Lewiston, ME 04240; phone at (207) 755-5605, or email 
at [email protected].
    i. FERC Contact: Erin Kimsey at (202) 502-8621 or email at 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item o below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC 61,076 
(2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR part 402; and (b) the Maine State 
Historic Preservation Officer (SHPO) and Penobscot Nation Tribal 
Historic Preservation Officer (THPO), as required by section 106 of the 
National Historic Preservation Act and the implementing regulations of 
the Advisory Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Bangor-Pacific Hydro 
Associates as the Commission's non-federal representative for carrying 
out informal consultation, pursuant to section 7 of the Endangered 
Species Act, section 106 of the National Historic Preservation Act, and 
section 305(b) of the Magnuson-Stevens Fishery Conservation and 
Management Act.
    m. Bangor-Pacific Hydro Associates filed with the Commission a Pre-
Application Document (PAD; including a proposed process plan and 
schedule), pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's website 
(https://www.ferc.gov), using the eLibrary link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). Copies are also available by request from Mr. Randy Dorman 
of Brookfield Renewable at (207) 755-5605 or via email at 
[email protected].
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, please 
contact FERC Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Commission staff's Scoping Document 1 (SD1), as well as study requests. 
All comments on the PAD and SD1, and study requests should be sent to 
the address above in paragraph h. In addition, all comments on the PAD 
and SD1, study requests, requests for cooperating agency status, and 
all communications to and from Commission staff related to the merits 
of the potential application must be filed with the Commission.
    The Commission strongly encourages electronic filing. Please file 
all documents using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected]. In lieu of electronic filing, please send a 
paper copy to: Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. The first page of any filing 
should include docket number P-2600-087.
    All filings with the Commission must bear the appropriate heading: 
Comments on Pre-Application Document, Study Requests, Comments on 
Scoping Document 1, Request for Cooperating Agency Status, or 
Communications to and from Commission Staff. Any individual or entity 
interested in submitting study requests, commenting on the PAD or SD1, 
and any agency requesting cooperating status must do so within 60 days 
of the date of this notice.
    p. Although our current intent is to prepare an environmental 
assessment (EA), there is the possibility that an Environmental Impact 
Statement (EIS) will be required. The scoping process will satisfy the 
NEPA scoping requirements, irrespective of whether an EA or EIS is 
issued by the Commission.

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribe, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be

[[Page 38619]]

addressed in the environmental document. The times and locations of 
these meetings are as follows:

Daytime Scoping Meeting

    Date: Wednesday, August 28, 2019.
    Time: 10:00 a.m.
    Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493.
    Phone: (207) 732-4270.

Evening Scoping Meeting

    Date: Wednesday, August 28, 2019.
    Time: 6:00 p.m.
    Location: Enfield Town Office, 789 Hammett Road, Enfield, ME 04493.
    Phone: (207) 732-4270.
    SD1, which outlines the subject areas to be addressed in the 
environmental document, was mailed to the individuals and entities on 
the Commission's mailing list. Copies of SD1 will be available at the 
scoping meetings, or may be viewed on the web at https://www.ferc.gov, 
using the eLibrary link. Follow the directions for accessing 
information in paragraph n. Based on all oral and written comments, a 
Scoping Document 2 (SD2) may be issued. SD2 may include a revised 
process plan and schedule, as well as a list of issues, identified 
through the scoping process.

Environmental Site Review

    The licensee and Commission staff will conduct an environmental 
site review of the project on Tuesday, August 27, 2019, starting at 
1:00 p.m. All participants should meet at the project, located at 94 
Dam Road, West Enfield, ME 04493.
    If you plan to attend the environmental site review, please contact 
Randy Dorman of Brookfield Renewable at (207) 755-5605, or via email at 
[email protected] on or before August 19, 2019, and 
indicate how many participants will be attending with you.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will be placed 
in the public records of the project.

    Dated: July 30, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-16847 Filed 8-6-19; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.