Download as PDF 38676 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices (ADAMS): You may obtain publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • ROP Enhancement Website: Go to https://www.nrc.gov/reactors/operating/ oversight/rop-enhancement.html. jspears on DSK3GMQ082PROD with NOTICES B. Submitting Comments Please include ROP Enhancement and docket ID NRC–2019–0155 in your comment submission. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will enter the comment submissions at https:// www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Discussion The ROP is the program that provides oversight and assessment of operating U.S. nuclear power plants. In 2018, the NRC staff solicited input from both NRC staff and external stakeholders on ways to improve the ROP. The NRC held numerous public meetings to discuss the disposition of this stakeholder feedback, resulting in several staff recommendations for Commission approval, described in SECY–19–0067, ‘‘Recommendations for Enhancing the Reactor Oversight Process,’’ dated June 28, 2019 ADAMS Package Accession No. ML19070A036. Documents, VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 presentations, and meeting summaries associated with the development of this paper are listed on the ROP Enhancement public web page. As described in SECY–19–0067, the NRC staff completed a comprehensive review of every core safety inspection procedure to determine if current sample requirements and resource estimates were appropriate. Of the 16 reactor safety inspection procedures, the staff recommended reducing minimum sample sizes in five inspection procedures, increasing the minimum sample size in one inspection procedure, consolidating two different inspection procedures into one procedure, and revising the frequency of one inspection from biennial to triennial. The NRC staff also initially considered an industry recommendation to credit licensee self-assessments in lieu of some safety inspections; however, the NRC is no longer considering this recommendation. The NRC is currently working on long-term recommendations to enhance the ROP in the following areas: The problem identification and resolution inspection program, the cross-cutting issues process, radiation protection inspection procedures, ISFSI inspections, and the SDP, particularly for the emergency preparedness cornerstone. The NRC is soliciting public comment on these long-term ROP enhancement efforts, the broad range of ROP topics described in SECY–19–0067, and any other areas of the ROP that the staff should consider under this initiative. Specifically, the NRC staff is seeking public comment on the following questions: 1. What areas of the ROP are working well? 2. What areas of the ROP are not working well? 3. How can the NRC improve the ROP in the following areas: The problem identification and resolution inspection program, the cross-cutting issues process, radiation protection inspections, ISFSI inspections, and the SDP? The public comment period is scheduled to close on October 7, 2019. Any comments received on SECY–19– 0067 will be forwarded to the Commission for its consideration. Dated at Rockville, Maryland, this 2nd day of August, 2019. PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 For the Nuclear Regulatory Commission. Christopher G. Miller, Director, Division of Inspection and Regional Support, Office of Nuclear Reactor Regulation. [FR Doc. 2019–16876 Filed 8–6–19; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–277 and 50–278; NRC– 2018–0130] Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3 Nuclear Regulatory Commission. ACTION: Draft supplemental environmental impact statement; public meeting and request for comment. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft plant-specific Supplement 10, Second Renewal, to the Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants, NUREG–1437, regarding the subsequent renewal of Facility Operating License Nos. DPR–44 and DPR–56 for an additional 20 years of operation for Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom). The Peach Bottom facility is located in York County, Pennsylvania. Possible alternatives to the proposed action (subsequent license renewal) include no action and reasonable replacement power alternatives. The NRC staff will hold a public meeting to present an overview of the draft plantspecific supplement to the GEIS and to accept public comment on the document. SUMMARY: The public meeting will be held on September 12, 2019, from 6:00 p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA 17314. Submit either electronic or written comments by September 23, 2019. Comments received after this date will be considered, if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2018–0130. Address questions about NRC docket IDs to Jennifer Borges; telephone: 301–287– 9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER DATES: E:\FR\FM\07AUN1.SGM 07AUN1 Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices section of this document. • Mail comments to: Office of Administration, Mail Stop: TWFN–7– A60M, ATTN: Program Management, Announcements and Editing Staff, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: David Drucker, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415– 6223; email: David.Drucker@nrc.gov. SUPPLEMENTARY INFORMATION: INFORMATION CONTACT jspears on DSK3GMQ082PROD with NOTICES I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2018– 0130 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2018–0130. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publiclyavailable documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that the document is referenced here. Draft plant-specific Supplement 10, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG– 1437, is available in ADAMS under Accession No. ML19210D453. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. • Library: A copy of draft plantspecific Supplement 10, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG– 1437, is available at the following location: Hartford County Public VerDate Sep<11>2014 16:49 Aug 06, 2019 Jkt 247001 Library, Whiteford Branch, 2407 Whiteford Road, Whiteford, MD 21160. B. Submitting Comments Please include Docket ID NRC–2018– 0130 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket. The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed. The NRC will post all comment submissions at https://www.regulations.gov/ as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Discussion The NRC is issuing for public comment draft plant-specific Supplement 10, Second Renewal, to the GEIS for License Renewal of Nuclear Plants, NUREG–1437, regarding the subsequent renewal of Facility Operating License Nos. DPR–44 and DPR–56 for an additional 20 years of operation for Peach Bottom Units 2 and 3. Draft plant-specific Supplement 10, Second Renewal, to the GEIS includes the preliminary analysis that evaluates the environmental impacts of the proposed action and alternatives to the proposed action. The NRC’s preliminary recommendation is that the adverse environmental impacts of subsequent license renewal for Peach Bottom are not so great that preserving the option of subsequent license renewal for energy-planning decisionmakers would be unreasonable. III. Public Meeting The NRC staff will hold a public meeting prior to the close of the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comment on the document. The meeting will be held on September 12, 2019, from 6:00 p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA 17314. There will be an open house one hour PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 38677 before the meeting for members of the public to meet with NRC staff members and sign in to speak. The meeting will be transcribed and will include: (1) A presentation of the contents of the draft plant-specific supplement to the GEIS and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft plant-specific supplement to the GEIS. To be considered in the final supplement to the GEIS, comments must be provided either at the transcribed public meeting or submitted in writing by the comment deadline identified above. Persons may preregister to attend or present oral comments at the meeting by contacting Mr. David Drucker, the NRC Project Manager, at 301–415–6223, or by email at David.Drucker@nrc.gov no later than Thursday, August 29, 2019. Members of the public may also register to provide oral comments within 15 minutes before the start of the meeting. Individual oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Mr. Drucker’s attention no later than Thursday, August 29, 2019, to provide the NRC staff adequate notice to determine whether the request can be accommodated. Dated at Rockville, Maryland, this 1st day of August, 2019. For the Nuclear Regulatory Commission. Eric R. Oesterle, Chief, License Renewal Projects Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation. [FR Doc. 2019–16794 Filed 8–6–19; 8:45 am] BILLING CODE 7590–01–P POSTAL REGULATORY COMMISSION [Docket Nos. MC2019–178 and CP2019–200; MC2019–179 and CP2019–201] New Postal Products Postal Regulatory Commission. Notice. AGENCY: ACTION: The Commission is noticing a recent Postal Service filing for the Commission’s consideration concerning negotiated service agreements. This notice informs the public of the filing, invites public comment, and takes other administrative steps. DATES: Comments are due: August 9, 2019. ADDRESSES: Submit comments electronically via the Commission’s Filing Online system at https:// SUMMARY: E:\FR\FM\07AUN1.SGM 07AUN1

Agencies

[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38676-38677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16794]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-277 and 50-278; NRC-2018-0130]


Exelon Generation Company, LLC; Peach Bottom Atomic Power 
Station, Units 2 and 3

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft supplemental environmental impact statement; public 
meeting and request for comment.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment draft plant-specific Supplement 10, Second Renewal, to 
the Generic Environmental Impact Statement (GEIS) for License Renewal 
of Nuclear Plants, NUREG-1437, regarding the subsequent renewal of 
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20 
years of operation for Peach Bottom Atomic Power Station, Units 2 and 3 
(Peach Bottom). The Peach Bottom facility is located in York County, 
Pennsylvania. Possible alternatives to the proposed action (subsequent 
license renewal) include no action and reasonable replacement power 
alternatives. The NRC staff will hold a public meeting to present an 
overview of the draft plant-specific supplement to the GEIS and to 
accept public comment on the document.

DATES: The public meeting will be held on September 12, 2019, from 6:00 
p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA 
17314. Submit either electronic or written comments by September 23, 
2019. Comments received after this date will be considered, if it is 
practical to do so, but the NRC is able to ensure consideration only 
for comments received on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130. Address 
questions about NRC docket IDs to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER

[[Page 38677]]

INFORMATION CONTACT section of this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, ATTN: Program Management, Announcements and Editing Staff, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: David Drucker, Office of Nuclear 
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001; telephone: 301-415-6223; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2018-0130 when contacting the NRC 
about the availability of information regarding this document. You may 
obtain publicly-available information related to this document by any 
of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may access publicly-available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The ADAMS accession number for each 
document referenced in this document (if that document is available in 
ADAMS) is provided the first time that the document is referenced here. 
Draft plant-specific Supplement 10, Second Renewal, to the GEIS for 
License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS 
under Accession No. ML19210D453.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.
     Library: A copy of draft plant-specific Supplement 10, 
Second Renewal, to the GEIS for License Renewal of Nuclear Plants, 
NUREG-1437, is available at the following location: Hartford County 
Public Library, Whiteford Branch, 2407 Whiteford Road, Whiteford, MD 
21160.

B. Submitting Comments

    Please include Docket ID NRC-2018-0130 in the subject line of your 
comment submission, in order to ensure that the NRC is able to make 
your comment submission available to the public in this docket.
    The NRC cautions you not to include identifying or contact 
information in comment submissions that you do not want to be publicly 
disclosed. The NRC will post all comment submissions at https://www.regulations.gov/ as well as enter the comment submissions into 
ADAMS. The NRC does not routinely edit comment submissions to remove 
identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Discussion

    The NRC is issuing for public comment draft plant-specific 
Supplement 10, Second Renewal, to the GEIS for License Renewal of 
Nuclear Plants, NUREG-1437, regarding the subsequent renewal of 
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20 
years of operation for Peach Bottom Units 2 and 3. Draft plant-specific 
Supplement 10, Second Renewal, to the GEIS includes the preliminary 
analysis that evaluates the environmental impacts of the proposed 
action and alternatives to the proposed action. The NRC's preliminary 
recommendation is that the adverse environmental impacts of subsequent 
license renewal for Peach Bottom are not so great that preserving the 
option of subsequent license renewal for energy-planning decisionmakers 
would be unreasonable.

III. Public Meeting

    The NRC staff will hold a public meeting prior to the close of the 
public comment period to present an overview of the draft plant-
specific supplement to the GEIS and to accept public comment on the 
document. The meeting will be held on September 12, 2019, from 6:00 
p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA 
17314. There will be an open house one hour before the meeting for 
members of the public to meet with NRC staff members and sign in to 
speak. The meeting will be transcribed and will include: (1) A 
presentation of the contents of the draft plant-specific supplement to 
the GEIS and (2) the opportunity for interested government agencies, 
organizations, and individuals to provide comments on the draft plant-
specific supplement to the GEIS. To be considered in the final 
supplement to the GEIS, comments must be provided either at the 
transcribed public meeting or submitted in writing by the comment 
deadline identified above. Persons may pre-register to attend or 
present oral comments at the meeting by contacting Mr. David Drucker, 
the NRC Project Manager, at 301-415-6223, or by email at 
[email protected] no later than Thursday, August 29, 2019. Members 
of the public may also register to provide oral comments within 15 
minutes before the start of the meeting. Individual oral comments may 
be limited by the time available, depending on the number of persons 
who register. If special equipment or accommodations are needed to 
attend or present information at the public meeting, the need should be 
brought to Mr. Drucker's attention no later than Thursday, August 29, 
2019, to provide the NRC staff adequate notice to determine whether the 
request can be accommodated.

    Dated at Rockville, Maryland, this 1st day of August, 2019.

    For the Nuclear Regulatory Commission.
Eric R. Oesterle,
Chief, License Renewal Projects Branch, Division of Materials and 
License Renewal, Office of Nuclear Reactor Regulation.
[FR Doc. 2019-16794 Filed 8-6-19; 8:45 am]