38676
Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced (if it is
available in ADAMS) is provided the
first time that it is mentioned in this
document.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• ROP Enhancement Website: Go to
https://www.nrc.gov/reactors/operating/
oversight/rop-enhancement.html.
jspears on DSK3GMQ082PROD with NOTICES
B. Submitting Comments
Please include ROP Enhancement and
docket ID NRC–2019–0155 in your
comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will enter the comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Discussion
The ROP is the program that provides
oversight and assessment of operating
U.S. nuclear power plants. In 2018, the
NRC staff solicited input from both NRC
staff and external stakeholders on ways
to improve the ROP. The NRC held
numerous public meetings to discuss
the disposition of this stakeholder
feedback, resulting in several staff
recommendations for Commission
approval, described in SECY–19–0067,
‘‘Recommendations for Enhancing the
Reactor Oversight Process,’’ dated June
28, 2019 ADAMS Package Accession
No. ML19070A036. Documents,
VerDate Sep<11>2014
16:49 Aug 06, 2019
Jkt 247001
presentations, and meeting summaries
associated with the development of this
paper are listed on the ROP
Enhancement public web page.
As described in SECY–19–0067, the
NRC staff completed a comprehensive
review of every core safety inspection
procedure to determine if current
sample requirements and resource
estimates were appropriate. Of the 16
reactor safety inspection procedures, the
staff recommended reducing minimum
sample sizes in five inspection
procedures, increasing the minimum
sample size in one inspection
procedure, consolidating two different
inspection procedures into one
procedure, and revising the frequency of
one inspection from biennial to
triennial. The NRC staff also initially
considered an industry recommendation
to credit licensee self-assessments in
lieu of some safety inspections;
however, the NRC is no longer
considering this recommendation.
The NRC is currently working on
long-term recommendations to enhance
the ROP in the following areas: The
problem identification and resolution
inspection program, the cross-cutting
issues process, radiation protection
inspection procedures, ISFSI
inspections, and the SDP, particularly
for the emergency preparedness
cornerstone.
The NRC is soliciting public comment
on these long-term ROP enhancement
efforts, the broad range of ROP topics
described in SECY–19–0067, and any
other areas of the ROP that the staff
should consider under this initiative.
Specifically, the NRC staff is seeking
public comment on the following
questions:
1. What areas of the ROP are working
well?
2. What areas of the ROP are not
working well?
3. How can the NRC improve the ROP
in the following areas: The problem
identification and resolution inspection
program, the cross-cutting issues
process, radiation protection
inspections, ISFSI inspections, and the
SDP?
The public comment period is
scheduled to close on October 7, 2019.
Any comments received on SECY–19–
0067 will be forwarded to the
Commission for its consideration.
Dated at Rockville, Maryland, this 2nd day
of August, 2019.
PO 00000
Frm 00090
Fmt 4703
Sfmt 4703
For the Nuclear Regulatory Commission.
Christopher G. Miller,
Director, Division of Inspection and Regional
Support, Office of Nuclear Reactor
Regulation.
[FR Doc. 2019–16876 Filed 8–6–19; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–277 and 50–278; NRC–
2018–0130]
Exelon Generation Company, LLC;
Peach Bottom Atomic Power Station,
Units 2 and 3
Nuclear Regulatory
Commission.
ACTION: Draft supplemental
environmental impact statement; public
meeting and request for comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment draft plant-specific
Supplement 10, Second Renewal, to the
Generic Environmental Impact
Statement (GEIS) for License Renewal of
Nuclear Plants, NUREG–1437, regarding
the subsequent renewal of Facility
Operating License Nos. DPR–44 and
DPR–56 for an additional 20 years of
operation for Peach Bottom Atomic
Power Station, Units 2 and 3 (Peach
Bottom). The Peach Bottom facility is
located in York County, Pennsylvania.
Possible alternatives to the proposed
action (subsequent license renewal)
include no action and reasonable
replacement power alternatives. The
NRC staff will hold a public meeting to
present an overview of the draft plantspecific supplement to the GEIS and to
accept public comment on the
document.
SUMMARY:
The public meeting will be held
on September 12, 2019, from 6:00 p.m.
to 8:00 p.m. at the Peach Bottom Inn,
6085 Delta Road, Delta, PA 17314.
Submit either electronic or written
comments by September 23, 2019.
Comments received after this date will
be considered, if it is practical to do so,
but the NRC is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2018–0130. Address
questions about NRC docket IDs to
Jennifer Borges; telephone: 301–287–
9127; email: Jennifer.Borges@nrc.gov.
For technical questions, contact the
individual listed in the FOR FURTHER
DATES:
E:\FR\FM\07AUN1.SGM
07AUN1
Federal Register / Vol. 84, No. 152 / Wednesday, August 7, 2019 / Notices
section of this
document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, ATTN: Program Management,
Announcements and Editing Staff, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
David Drucker, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
6223; email: David.Drucker@nrc.gov.
SUPPLEMENTARY INFORMATION:
INFORMATION CONTACT
jspears on DSK3GMQ082PROD with NOTICES
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2018–
0130 when contacting the NRC about
the availability of information regarding
this document. You may obtain
publicly-available information related to
this document by any of the following
methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2018–0130.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that the document is referenced here.
Draft plant-specific Supplement 10,
Second Renewal, to the GEIS for License
Renewal of Nuclear Plants, NUREG–
1437, is available in ADAMS under
Accession No. ML19210D453.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
• Library: A copy of draft plantspecific Supplement 10, Second
Renewal, to the GEIS for License
Renewal of Nuclear Plants, NUREG–
1437, is available at the following
location: Hartford County Public
VerDate Sep<11>2014
16:49 Aug 06, 2019
Jkt 247001
Library, Whiteford Branch, 2407
Whiteford Road, Whiteford, MD 21160.
B. Submitting Comments
Please include Docket ID NRC–2018–
0130 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed. The NRC
will post all comment submissions at
https://www.regulations.gov/ as well as
enter the comment submissions into
ADAMS. The NRC does not routinely
edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Discussion
The NRC is issuing for public
comment draft plant-specific
Supplement 10, Second Renewal, to the
GEIS for License Renewal of Nuclear
Plants, NUREG–1437, regarding the
subsequent renewal of Facility
Operating License Nos. DPR–44 and
DPR–56 for an additional 20 years of
operation for Peach Bottom Units 2 and
3. Draft plant-specific Supplement 10,
Second Renewal, to the GEIS includes
the preliminary analysis that evaluates
the environmental impacts of the
proposed action and alternatives to the
proposed action. The NRC’s preliminary
recommendation is that the adverse
environmental impacts of subsequent
license renewal for Peach Bottom are
not so great that preserving the option
of subsequent license renewal for
energy-planning decisionmakers would
be unreasonable.
III. Public Meeting
The NRC staff will hold a public
meeting prior to the close of the public
comment period to present an overview
of the draft plant-specific supplement to
the GEIS and to accept public comment
on the document. The meeting will be
held on September 12, 2019, from 6:00
p.m. to 8:00 p.m. at the Peach Bottom
Inn, 6085 Delta Road, Delta, PA 17314.
There will be an open house one hour
PO 00000
Frm 00091
Fmt 4703
Sfmt 4703
38677
before the meeting for members of the
public to meet with NRC staff members
and sign in to speak. The meeting will
be transcribed and will include: (1) A
presentation of the contents of the draft
plant-specific supplement to the GEIS
and (2) the opportunity for interested
government agencies, organizations, and
individuals to provide comments on the
draft plant-specific supplement to the
GEIS. To be considered in the final
supplement to the GEIS, comments
must be provided either at the
transcribed public meeting or submitted
in writing by the comment deadline
identified above. Persons may preregister to attend or present oral
comments at the meeting by contacting
Mr. David Drucker, the NRC Project
Manager, at 301–415–6223, or by email
at David.Drucker@nrc.gov no later than
Thursday, August 29, 2019. Members of
the public may also register to provide
oral comments within 15 minutes before
the start of the meeting. Individual oral
comments may be limited by the time
available, depending on the number of
persons who register. If special
equipment or accommodations are
needed to attend or present information
at the public meeting, the need should
be brought to Mr. Drucker’s attention no
later than Thursday, August 29, 2019, to
provide the NRC staff adequate notice to
determine whether the request can be
accommodated.
Dated at Rockville, Maryland, this 1st day
of August, 2019.
For the Nuclear Regulatory Commission.
Eric R. Oesterle,
Chief, License Renewal Projects Branch,
Division of Materials and License Renewal,
Office of Nuclear Reactor Regulation.
[FR Doc. 2019–16794 Filed 8–6–19; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket Nos. MC2019–178 and CP2019–200;
MC2019–179 and CP2019–201]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
negotiated service agreements. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: August 9,
2019.
ADDRESSES: Submit comments
electronically via the Commission’s
Filing Online system at https://
SUMMARY:
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 84, Number 152 (Wednesday, August 7, 2019)]
[Notices]
[Pages 38676-38677]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16794]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-277 and 50-278; NRC-2018-0130]
Exelon Generation Company, LLC; Peach Bottom Atomic Power
Station, Units 2 and 3
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft supplemental environmental impact statement; public
meeting and request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment draft plant-specific Supplement 10, Second Renewal, to
the Generic Environmental Impact Statement (GEIS) for License Renewal
of Nuclear Plants, NUREG-1437, regarding the subsequent renewal of
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20
years of operation for Peach Bottom Atomic Power Station, Units 2 and 3
(Peach Bottom). The Peach Bottom facility is located in York County,
Pennsylvania. Possible alternatives to the proposed action (subsequent
license renewal) include no action and reasonable replacement power
alternatives. The NRC staff will hold a public meeting to present an
overview of the draft plant-specific supplement to the GEIS and to
accept public comment on the document.
DATES: The public meeting will be held on September 12, 2019, from 6:00
p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA
17314. Submit either electronic or written comments by September 23,
2019. Comments received after this date will be considered, if it is
practical to do so, but the NRC is able to ensure consideration only
for comments received on or before this date.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130. Address
questions about NRC docket IDs to Jennifer Borges; telephone: 301-287-
9127; email: [email protected]. For technical questions, contact
the individual listed in the FOR FURTHER
[[Page 38677]]
INFORMATION CONTACT section of this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, ATTN: Program Management, Announcements and Editing Staff,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: David Drucker, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-6223; email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2018-0130 when contacting the NRC
about the availability of information regarding this document. You may
obtain publicly-available information related to this document by any
of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2018-0130.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that the document is referenced here.
Draft plant-specific Supplement 10, Second Renewal, to the GEIS for
License Renewal of Nuclear Plants, NUREG-1437, is available in ADAMS
under Accession No. ML19210D453.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
Library: A copy of draft plant-specific Supplement 10,
Second Renewal, to the GEIS for License Renewal of Nuclear Plants,
NUREG-1437, is available at the following location: Hartford County
Public Library, Whiteford Branch, 2407 Whiteford Road, Whiteford, MD
21160.
B. Submitting Comments
Please include Docket ID NRC-2018-0130 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed. The NRC will post all comment submissions at https://www.regulations.gov/ as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Discussion
The NRC is issuing for public comment draft plant-specific
Supplement 10, Second Renewal, to the GEIS for License Renewal of
Nuclear Plants, NUREG-1437, regarding the subsequent renewal of
Facility Operating License Nos. DPR-44 and DPR-56 for an additional 20
years of operation for Peach Bottom Units 2 and 3. Draft plant-specific
Supplement 10, Second Renewal, to the GEIS includes the preliminary
analysis that evaluates the environmental impacts of the proposed
action and alternatives to the proposed action. The NRC's preliminary
recommendation is that the adverse environmental impacts of subsequent
license renewal for Peach Bottom are not so great that preserving the
option of subsequent license renewal for energy-planning decisionmakers
would be unreasonable.
III. Public Meeting
The NRC staff will hold a public meeting prior to the close of the
public comment period to present an overview of the draft plant-
specific supplement to the GEIS and to accept public comment on the
document. The meeting will be held on September 12, 2019, from 6:00
p.m. to 8:00 p.m. at the Peach Bottom Inn, 6085 Delta Road, Delta, PA
17314. There will be an open house one hour before the meeting for
members of the public to meet with NRC staff members and sign in to
speak. The meeting will be transcribed and will include: (1) A
presentation of the contents of the draft plant-specific supplement to
the GEIS and (2) the opportunity for interested government agencies,
organizations, and individuals to provide comments on the draft plant-
specific supplement to the GEIS. To be considered in the final
supplement to the GEIS, comments must be provided either at the
transcribed public meeting or submitted in writing by the comment
deadline identified above. Persons may pre-register to attend or
present oral comments at the meeting by contacting Mr. David Drucker,
the NRC Project Manager, at 301-415-6223, or by email at
[email protected] no later than Thursday, August 29, 2019. Members
of the public may also register to provide oral comments within 15
minutes before the start of the meeting. Individual oral comments may
be limited by the time available, depending on the number of persons
who register. If special equipment or accommodations are needed to
attend or present information at the public meeting, the need should be
brought to Mr. Drucker's attention no later than Thursday, August 29,
2019, to provide the NRC staff adequate notice to determine whether the
request can be accommodated.
Dated at Rockville, Maryland, this 1st day of August, 2019.
For the Nuclear Regulatory Commission.
Eric R. Oesterle,
Chief, License Renewal Projects Branch, Division of Materials and
License Renewal, Office of Nuclear Reactor Regulation.
[FR Doc. 2019-16794 Filed 8-6-19; 8:45 am]
BILLING CODE 7590-01-P