Combined Notice of Filings #1, 38248-38250 [2019-16726]

Download as PDF 38248 Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices Bureau’s estimate of the burden of the collection of information, including the validity of the methods and the assumptions used; (c) Ways to enhance the quality, utility, and clarity of the information to be collected; and (d) Ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology. Comments submitted in response to this notice will be reviewed by OMB as part of its review of this request. All comments will become a matter of public record. Dated: August 2, 2019. Mary McLeod, General Counsel, Bureau of Consumer Financial Protection. [FR Doc. 2019–16919 Filed 8–2–19; 4:15 pm] BILLING CODE 4810–AM–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER19–2460–000] jbell on DSK3GLQ082PROD with NOTICES DWW Solar II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced DWW Solar II, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 20, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be VerDate Sep<11>2014 19:21 Aug 05, 2019 Jkt 247001 listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–16728 Filed 8–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: July 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER19–2479–000] Aera Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced Aera LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 future issuances of securities and assumptions of liability, is August 20, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2019–16725 Filed 8–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG19–158–000. Applicants: Wright Solar Park LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Wright Solar Park LLC. Filed Date: 7/31/19. Accession Number: 20190731–5102. Comments Due: 5 p.m. ET 8/21/19. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER18–1906–001; ER16–221–002; ER18–1907–001; ER17– E:\FR\FM\06AUN1.SGM 06AUN1 jbell on DSK3GLQ082PROD with NOTICES Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices 1757–002; ER10–1767–004; ER10–1532– 004; ER10–1541–005; ER10–1642–006; ER13–2349–003; ER13–2350–003. Applicants: Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, EAM Nelson Holding, LLC, RS Cogen, LLC. Description: Supplement to June 24, 2019 Notification of Change in Status [Attachment B—Excel format] of the Entergy Central MBR Utilities. Filed Date: 7/26/19. Accession Number: 20190726–5175. Comments Due: 5 p.m. ET 8/5/19. Docket Numbers: ER18–1918–003. Applicants: Kestrel Acquisition, LLC. Description: Report Filing: Refund Report 2019 to 5 to be effective N/A. Filed Date: 7/31/19. Accession Number: 20190731–5141. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–1936–001. Applicants: Idaho Power Company. Description: Compliance filing: Response to Deficiency Letter Regarding Order Nos. 845 and 845–A Filing to be effective 5/22/2019. Filed Date: 7/30/19. Accession Number: 20190730–5101. Comments Due: 5 p.m. ET 8/20/19. Docket Numbers: ER19–2496–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Amendment to Agreement of Cotenancy (RS 139) to be effective 7/31/2019. Filed Date: 7/30/19. Accession Number: 20190730–5099. Comments Due: 5 p.m. ET 8/20/19. Docket Numbers: ER19–2497–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2019–07–30 Real-Time Neutrality Settlement Amendment to be effective 8/1/2019. Filed Date: 7/30/19. Accession Number: 20190730–5100. Comments Due: 5 p.m. ET 8/20/19. Docket Numbers: ER19–2498–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2019–07–31_SA 3152 Polaris Wind Energy-METC 1st Rev GIA (J533) to be effective 7/17/2019. Filed Date: 7/31/19. Accession Number: 20190731–5022. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2499–000. Applicants: Tuscola Wind II, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 9/29/2019. VerDate Sep<11>2014 19:21 Aug 05, 2019 Jkt 247001 Filed Date: 7/31/19. Accession Number: 20190731–5047. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2500–000. Applicants: Pheasant Run Wind, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 9/29/2019. Filed Date: 7/31/19. Accession Number: 20190731–5048. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2501–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3126R4 WAPA NITSA and NOA to be effective 7/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5056. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2502–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Wiregrass LGIA Filing to be effective 7/ 17/2019. Filed Date: 7/31/19. Accession Number: 20190731–5077. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2503–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: SCE Revised TO Tariff Appendix X to be effective 7/26/2019. Filed Date: 7/31/19. Accession Number: 20190731–5084. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2504–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: SCE Revised WDAT Attachment J to be effective 7/26/2019. Filed Date: 7/31/19. Accession Number: 20190731–5085. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2505–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: WDAT Energy Storage to be effective 9/ 30/2019. Filed Date: 7/31/19. Accession Number: 20190731–5101. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2506–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Q2 2019 Quarterly Filing of City and County of San Francisco’s WDT SA (SA 275) to be effective 6/30/2019. Filed Date: 7/31/19. Accession Number: 20190731–5115. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2507–000. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 38249 Applicants: Convergent Energy and Power LP. Description: § 205(d) Rate Filing: Normal filing 2019 to be effective 8/1/ 2019. Filed Date: 7/31/19. Accession Number: 20190731–5116. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2508–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3215R6 People’s Electric Cooperative NITSA NOA to be effective 7/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5121. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2509–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3563 ETEC, MISO and Entergy Services Attachment AO to be effective 7/1/2019. Filed Date: 7/31/19. Accession Number: 20190731–5130. Comments Due: 5 p.m. ET 8/21/19. Docket Numbers: ER19–2510–000. Applicants: Public Service Company of Colorado. Description: § 205(d) Rate Filing: PSCo-Multi-CFA–350-Exh I & L 0.1.0Exh N 0.0.0 to be effective 9/30/2019. Filed Date: 7/31/19. Accession Number: 20190731–5143. Comments Due: 5 p.m. ET 8/21/19. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES19–47–000. Applicants: Consumers Energy Company. Description: Application under Section 204 of the Federal Power Act for Authorization to Issue Securities of Consumers Energy Company. Filed Date: 7/30/19. Accession Number: 20190730–5124. Comments Due: 5 p.m. ET 8/20/19. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF19–1431–000. Applicants: Milton Regional Sewer Authority. Description: Form 556 of Milton Regional Sewer Authority. Filed Date: 7/31/19. Accession Number: 20190731–5032. Comments Due: Non-Applicable. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s E:\FR\FM\06AUN1.SGM 06AUN1 38250 Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–16726 Filed 8–5–19; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. Er19–2461–000] Dated: July 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. jbell on DSK3GLQ082PROD with NOTICES Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization; Crowned Ridge Wind, LLC [FR Doc. 2019–16724 Filed 8–5–19; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced Crowned Ridge Wind, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 20, 2019. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an VerDate Sep<11>2014 19:21 Aug 05, 2019 Jkt 247001 eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the website that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP19–1406–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Rate Schedule S–2 Tracker Filing eff 8–1– 2019 to be effective 8/1/2019. Filed Date: 7/30/19. Accession Number: 20190730–5020. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1407–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Keyspan release to Vitol eff 8–1–19 to be effective 8/1/2019. Filed Date: 7/30/19. Accession Number: 20190730–5027. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1408–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: Negotiated Rate—MC Global to Morgan 8958691 eff 8–1–19 to be effective 8/1/ 2019. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Filed Date: 7/30/19. Accession Number: 20190730–5031. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1409–000. Applicants: Algonquin Gas Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—BUG release to Emera eff 8–1–19 to be effective 8/1/2019. Filed Date: 7/30/19. Accession Number: 20190730–5039. Comments Due: 5 p.m. ET 8/12/19. Docket Numbers: RP19–1410–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Cherokee AGL— Replacement Shippers—Aug 2019 to be effective 8/1/2019. Filed Date: 7/30/19. Accession Number: 20190730–5045. Comments Due: 5 p.m. ET 8/12/19. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 31, 2019. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2019–16727 Filed 8–5–19; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2017–0751; FRL–9997–26] Interim Registration Review Decisions and Case Closures for Several Pesticides; Notice of Availability Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This notice announces the availability of EPA’s interim registration review decision for the following chemicals: abamectin, ametryn, SUMMARY: E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 84, Number 151 (Tuesday, August 6, 2019)]
[Notices]
[Pages 38248-38250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16726]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG19-158-000.
    Applicants: Wright Solar Park LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Wright Solar Park LLC.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5102.
    Comments Due: 5 p.m. ET 8/21/19.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER18-1906-001; ER16-221-002; ER18-1907-001; ER17-

[[Page 38249]]

1757-002; ER10-1767-004; ER10-1532-004; ER10-1541-005; ER10-1642-006; 
ER13-2349-003; ER13-2350-003.
    Applicants: Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy 
Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., 
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, 
EAM Nelson Holding, LLC, RS Cogen, LLC.
    Description: Supplement to June 24, 2019 Notification of Change in 
Status [Attachment B--Excel format] of the Entergy Central MBR 
Utilities.
    Filed Date: 7/26/19.
    Accession Number: 20190726-5175.
    Comments Due: 5 p.m. ET 8/5/19.

    Docket Numbers: ER18-1918-003.
    Applicants: Kestrel Acquisition, LLC.
    Description: Report Filing: Refund Report 2019 to 5 to be effective 
N/A.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5141.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-1936-001.
    Applicants: Idaho Power Company.
    Description: Compliance filing: Response to Deficiency Letter 
Regarding Order Nos. 845 and 845-A Filing to be effective 5/22/2019.
    Filed Date: 7/30/19.
    Accession Number: 20190730-5101.
    Comments Due: 5 p.m. ET 8/20/19.

    Docket Numbers: ER19-2496-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Amendment to Agreement of 
Cotenancy (RS 139) to be effective 7/31/2019.
    Filed Date: 7/30/19.
    Accession Number: 20190730-5099.
    Comments Due: 5 p.m. ET 8/20/19.

    Docket Numbers: ER19-2497-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2019-07-30 Real-Time 
Neutrality Settlement Amendment to be effective 8/1/2019.
    Filed Date: 7/30/19.
    Accession Number: 20190730-5100.
    Comments Due: 5 p.m. ET 8/20/19.

    Docket Numbers: ER19-2498-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2019-07-31_SA 3152 Polaris 
Wind Energy-METC 1st Rev GIA (J533) to be effective 7/17/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5022.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2499-000.
    Applicants: Tuscola Wind II, LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
Filing to be effective 9/29/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5047.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2500-000.
    Applicants: Pheasant Run Wind, LLC.
    Description: Baseline eTariff Filing: Reactive Power Compensation 
Filing to be effective 9/29/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5048.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2501-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3126R4 WAPA NITSA and NOA to 
be effective 7/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5056.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2502-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Wiregrass LGIA Filing to be 
effective 7/17/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5077.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2503-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: SCE Revised TO Tariff 
Appendix X to be effective 7/26/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5084.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2504-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: SCE Revised WDAT Attachment 
J to be effective 7/26/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5085.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2505-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: WDAT Energy Storage to be 
effective 9/30/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5101.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2506-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Q2 2019 Quarterly Filing of 
City and County of San Francisco's WDT SA (SA 275) to be effective 6/
30/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5115.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2507-000.
    Applicants: Convergent Energy and Power LP.
    Description: Sec.  205(d) Rate Filing: Normal filing 2019 to be 
effective 8/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5116.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2508-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3215R6 People's Electric 
Cooperative NITSA NOA to be effective 7/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5121.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2509-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3563 ETEC, MISO and Entergy 
Services Attachment AO to be effective 7/1/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5130.
    Comments Due: 5 p.m. ET 8/21/19.

    Docket Numbers: ER19-2510-000.
    Applicants: Public Service Company of Colorado.
    Description: Sec.  205(d) Rate Filing: PSCo-Multi-CFA-350-Exh I & L 
0.1.0-Exh N 0.0.0 to be effective 9/30/2019.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5143.
    Comments Due: 5 p.m. ET 8/21/19.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES19-47-000.
    Applicants: Consumers Energy Company.
    Description: Application under Section 204 of the Federal Power Act 
for Authorization to Issue Securities of Consumers Energy Company.
    Filed Date: 7/30/19.
    Accession Number: 20190730-5124.
    Comments Due: 5 p.m. ET 8/20/19.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF19-1431-000.
    Applicants: Milton Regional Sewer Authority.
    Description: Form 556 of Milton Regional Sewer Authority.
    Filed Date: 7/31/19.
    Accession Number: 20190731-5032.
    Comments Due: Non-Applicable.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's

[[Page 38250]]

Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern 
time on the specified comment date. Protests may be considered, but 
intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16726 Filed 8-5-19; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.