Combined Notice of Filings #1, 38248-38250 [2019-16726]
Download as PDF
38248
Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices
Bureau’s estimate of the burden of the
collection of information, including the
validity of the methods and the
assumptions used; (c) Ways to enhance
the quality, utility, and clarity of the
information to be collected; and (d)
Ways to minimize the burden of the
collection of information on
respondents, including through the use
of automated collection techniques or
other forms of information technology.
Comments submitted in response to this
notice will be reviewed by OMB as part
of its review of this request. All
comments will become a matter of
public record.
Dated: August 2, 2019.
Mary McLeod,
General Counsel, Bureau of Consumer
Financial Protection.
[FR Doc. 2019–16919 Filed 8–2–19; 4:15 pm]
BILLING CODE 4810–AM–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER19–2460–000]
jbell on DSK3GLQ082PROD with NOTICES
DWW Solar II, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced DWW Solar II, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
VerDate Sep<11>2014
19:21 Aug 05, 2019
Jkt 247001
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16728 Filed 8–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER19–2479–000]
Aera Energy LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced Aera LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
future issuances of securities and
assumptions of liability, is August 20,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2019–16725 Filed 8–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG19–158–000.
Applicants: Wright Solar Park LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Wright Solar Park
LLC.
Filed Date: 7/31/19.
Accession Number: 20190731–5102.
Comments Due: 5 p.m. ET 8/21/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER18–1906–001;
ER16–221–002; ER18–1907–001; ER17–
E:\FR\FM\06AUN1.SGM
06AUN1
jbell on DSK3GLQ082PROD with NOTICES
Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices
1757–002; ER10–1767–004; ER10–1532–
004; ER10–1541–005; ER10–1642–006;
ER13–2349–003; ER13–2350–003.
Applicants: Entergy Arkansas, LLC,
Entergy Louisiana, LLC, Entergy
Mississippi, LLC, Entergy New Orleans,
LLC, Entergy Texas, Inc., Entergy
Nuclear Palisades, LLC, Entergy Power,
LLC, EWO Marketing, LLC, EAM Nelson
Holding, LLC, RS Cogen, LLC.
Description: Supplement to June 24,
2019 Notification of Change in Status
[Attachment B—Excel format] of the
Entergy Central MBR Utilities.
Filed Date: 7/26/19.
Accession Number: 20190726–5175.
Comments Due: 5 p.m. ET 8/5/19.
Docket Numbers: ER18–1918–003.
Applicants: Kestrel Acquisition, LLC.
Description: Report Filing: Refund
Report 2019 to 5 to be effective N/A.
Filed Date: 7/31/19.
Accession Number: 20190731–5141.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–1936–001.
Applicants: Idaho Power Company.
Description: Compliance filing:
Response to Deficiency Letter Regarding
Order Nos. 845 and 845–A Filing to be
effective 5/22/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5101.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2496–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
Amendment to Agreement of Cotenancy
(RS 139) to be effective 7/31/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5099.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2497–000.
Applicants: California Independent
System Operator Corporation.
Description: § 205(d) Rate Filing:
2019–07–30 Real-Time Neutrality
Settlement Amendment to be effective
8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5100.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2498–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–07–31_SA 3152 Polaris Wind
Energy-METC 1st Rev GIA (J533) to be
effective 7/17/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5022.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2499–000.
Applicants: Tuscola Wind II, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 9/29/2019.
VerDate Sep<11>2014
19:21 Aug 05, 2019
Jkt 247001
Filed Date: 7/31/19.
Accession Number: 20190731–5047.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2500–000.
Applicants: Pheasant Run Wind, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 9/29/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5048.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2501–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3126R4 WAPA NITSA and NOA to be
effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5056.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2502–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Wiregrass LGIA Filing to be effective 7/
17/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5077.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2503–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Revised TO Tariff Appendix X to be
effective 7/26/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5084.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2504–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: SCE
Revised WDAT Attachment J to be
effective 7/26/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5085.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2505–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
WDAT Energy Storage to be effective 9/
30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5101.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2506–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing: Q2
2019 Quarterly Filing of City and
County of San Francisco’s WDT SA (SA
275) to be effective 6/30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5115.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2507–000.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
38249
Applicants: Convergent Energy and
Power LP.
Description: § 205(d) Rate Filing:
Normal filing 2019 to be effective 8/1/
2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5116.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2508–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3215R6 People’s Electric Cooperative
NITSA NOA to be effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5121.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2509–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing: 3563
ETEC, MISO and Entergy Services
Attachment AO to be effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5130.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19–2510–000.
Applicants: Public Service Company
of Colorado.
Description: § 205(d) Rate Filing:
PSCo-Multi-CFA–350-Exh I & L 0.1.0Exh N 0.0.0 to be effective 9/30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731–5143.
Comments Due: 5 p.m. ET 8/21/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–47–000.
Applicants: Consumers Energy
Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of
Consumers Energy Company.
Filed Date: 7/30/19.
Accession Number: 20190730–5124.
Comments Due: 5 p.m. ET 8/20/19.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF19–1431–000.
Applicants: Milton Regional Sewer
Authority.
Description: Form 556 of Milton
Regional Sewer Authority.
Filed Date: 7/31/19.
Accession Number: 20190731–5032.
Comments Due: Non-Applicable.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\06AUN1.SGM
06AUN1
38250
Federal Register / Vol. 84, No. 151 / Tuesday, August 6, 2019 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16726 Filed 8–5–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. Er19–2461–000]
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
jbell on DSK3GLQ082PROD with NOTICES
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization; Crowned Ridge Wind,
LLC
[FR Doc. 2019–16724 Filed 8–5–19; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced Crowned Ridge Wind,
LLC’s application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 20,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
VerDate Sep<11>2014
19:21 Aug 05, 2019
Jkt 247001
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1406–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: Rate
Schedule S–2 Tracker Filing eff 8–1–
2019 to be effective 8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5020.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1407–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Keyspan release to
Vitol eff 8–1–19 to be effective 8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5027.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1408–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—MC Global to Morgan
8958691 eff 8–1–19 to be effective 8/1/
2019.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Filed Date: 7/30/19.
Accession Number: 20190730–5031.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1409–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—BUG release to Emera
eff 8–1–19 to be effective 8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5039.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1410–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cherokee AGL—
Replacement Shippers—Aug 2019 to be
effective 8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5045.
Comments Due: 5 p.m. ET 8/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16727 Filed 8–5–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2017–0751; FRL–9997–26]
Interim Registration Review Decisions
and Case Closures for Several
Pesticides; Notice of Availability
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
This notice announces the
availability of EPA’s interim registration
review decision for the following
chemicals: abamectin, ametryn,
SUMMARY:
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 84, Number 151 (Tuesday, August 6, 2019)]
[Notices]
[Pages 38248-38250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16726]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG19-158-000.
Applicants: Wright Solar Park LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Wright Solar Park LLC.
Filed Date: 7/31/19.
Accession Number: 20190731-5102.
Comments Due: 5 p.m. ET 8/21/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER18-1906-001; ER16-221-002; ER18-1907-001; ER17-
[[Page 38249]]
1757-002; ER10-1767-004; ER10-1532-004; ER10-1541-005; ER10-1642-006;
ER13-2349-003; ER13-2350-003.
Applicants: Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy
Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc.,
Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC,
EAM Nelson Holding, LLC, RS Cogen, LLC.
Description: Supplement to June 24, 2019 Notification of Change in
Status [Attachment B--Excel format] of the Entergy Central MBR
Utilities.
Filed Date: 7/26/19.
Accession Number: 20190726-5175.
Comments Due: 5 p.m. ET 8/5/19.
Docket Numbers: ER18-1918-003.
Applicants: Kestrel Acquisition, LLC.
Description: Report Filing: Refund Report 2019 to 5 to be effective
N/A.
Filed Date: 7/31/19.
Accession Number: 20190731-5141.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-1936-001.
Applicants: Idaho Power Company.
Description: Compliance filing: Response to Deficiency Letter
Regarding Order Nos. 845 and 845-A Filing to be effective 5/22/2019.
Filed Date: 7/30/19.
Accession Number: 20190730-5101.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19-2496-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Amendment to Agreement of
Cotenancy (RS 139) to be effective 7/31/2019.
Filed Date: 7/30/19.
Accession Number: 20190730-5099.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19-2497-000.
Applicants: California Independent System Operator Corporation.
Description: Sec. 205(d) Rate Filing: 2019-07-30 Real-Time
Neutrality Settlement Amendment to be effective 8/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730-5100.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19-2498-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-07-31_SA 3152 Polaris
Wind Energy-METC 1st Rev GIA (J533) to be effective 7/17/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5022.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2499-000.
Applicants: Tuscola Wind II, LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 9/29/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5047.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2500-000.
Applicants: Pheasant Run Wind, LLC.
Description: Baseline eTariff Filing: Reactive Power Compensation
Filing to be effective 9/29/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5048.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2501-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3126R4 WAPA NITSA and NOA to
be effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5056.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2502-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Wiregrass LGIA Filing to be
effective 7/17/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5077.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2503-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Revised TO Tariff
Appendix X to be effective 7/26/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5084.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2504-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: SCE Revised WDAT Attachment
J to be effective 7/26/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5085.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2505-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: WDAT Energy Storage to be
effective 9/30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5101.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2506-000.
Applicants: Pacific Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: Q2 2019 Quarterly Filing of
City and County of San Francisco's WDT SA (SA 275) to be effective 6/
30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5115.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2507-000.
Applicants: Convergent Energy and Power LP.
Description: Sec. 205(d) Rate Filing: Normal filing 2019 to be
effective 8/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5116.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2508-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3215R6 People's Electric
Cooperative NITSA NOA to be effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5121.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2509-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3563 ETEC, MISO and Entergy
Services Attachment AO to be effective 7/1/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5130.
Comments Due: 5 p.m. ET 8/21/19.
Docket Numbers: ER19-2510-000.
Applicants: Public Service Company of Colorado.
Description: Sec. 205(d) Rate Filing: PSCo-Multi-CFA-350-Exh I & L
0.1.0-Exh N 0.0.0 to be effective 9/30/2019.
Filed Date: 7/31/19.
Accession Number: 20190731-5143.
Comments Due: 5 p.m. ET 8/21/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-47-000.
Applicants: Consumers Energy Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of Consumers Energy Company.
Filed Date: 7/30/19.
Accession Number: 20190730-5124.
Comments Due: 5 p.m. ET 8/20/19.
Take notice that the Commission received the following qualifying
facility filings:
Docket Numbers: QF19-1431-000.
Applicants: Milton Regional Sewer Authority.
Description: Form 556 of Milton Regional Sewer Authority.
Filed Date: 7/31/19.
Accession Number: 20190731-5032.
Comments Due: Non-Applicable.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's
[[Page 38250]]
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 31, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16726 Filed 8-5-19; 8:45 am]
BILLING CODE 6717-01-P