Columbia Gulf Transmission, L.L.C.; Notice of Schedule for Environmental Review of the Mainline 100 and Mainline 200 Replacement Project, 38026-38027 [2019-16625]
Download as PDF
38026
Federal Register / Vol. 84, No. 150 / Monday, August 5, 2019 / Notices
Members of the public who would
like to provide oral comments can preregister by sending an email to
VTR.EIS@nuclear.energy.gov.
Alternatively, participants will be able
to request to speak during the webcast.
Those who pre-register should indicate
at which session they want to speak and
their name.
If you are joining the webcast scoping
meeting via internet, copy and paste the
link below to login to the meeting site,
then follow the prompts. If you are
joining the webcast meeting via phone,
dial the U.S. toll-free number below and
follow the prompts. Comments will be
accepted during the webcast meeting, by
mail, and by email.
• Join webcast scoping meeting via
the internet:
August 27: https://
78449.themediaframe.com/dataconf/
productusers/ldos/mediaframe/31759/
indexl.html.
August 28: https://
78449.themediaframe.com/dataconf/
productusers/ldos/mediaframe/31762/
indexl.html.
(Copy and Paste into web browser).
• Join webcast public meeting by
phone: U.S. toll-free: 877–869–3847.
Signed in Washington, DC on July 29,
2019.
Dennis Miotla,
Chief Operating Officer for Nuclear Energy.
[FR Doc. 2019–16578 Filed 8–2–19; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jspears on DSK3GMQ082PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–2134–000.
Applicants: Wheelabrator Shasta
Energy Company Inc.
Description: Supplemental to June 14,
2019 Wheelabrator Shasta Energy
Company Inc. tariff filing.
Filed Date: 7/24/19.
Accession Number: 20190724–5142.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19–2329–001.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: Tariff Amendment:
2019–07–29_SA 2880 Att A-Proj Spec
No. 4 WVPA-EnerStar-West Union
Substitute to be effective 6/3/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5090.
Comments Due: 5 p.m. ET 8/19/19.
VerDate Sep<11>2014
18:42 Aug 02, 2019
Jkt 247001
Docket Numbers: ER19–2486–000.
Applicants: Imperial Valley Solar 2,
LLC.
Description: § 205(d) Rate Filing: COC
LGIA CTA Filing to be effective 7/30/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5126.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2487–000.
Applicants: Imperial Valley Solar 2,
LLC.
Description: § 205(d) Rate Filing: COC
New Substation Filing to be effective 7/
30/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5127.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2489–000.
Applicants: GridLiance High Plains
LLC.
Description: Compliance filing: GHP
eTariff Order No. 842 Revisions to be
effective 5/15/2018.
Filed Date: 7/30/19.
Accession Number: 20190730–5000.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2490–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–07–30_SA 3336 ATC-Waterloo
Utilities D–TIA to be effective 9/29/
2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5029.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2491–000.
Applicants: Interstate Power and
Light Company.
Description: § 205(d) Rate Filing:
Concurrence to Wholesale Distribution
Service Agreement (George) to be
effective 9/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5058.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2492–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
Construction Agmt—Conversion RossLex-Swift Rev 2 to be effective 9/29/
2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5060.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2493–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 217 to be effective 10/1/
2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5063.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2494–000.
Applicants: Arizona Public Service
Company.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Description: § 205(d) Rate Filing:
Revisions to Service Agreement Nos.
218 and 335 to be effective 7/1/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5079.
Comments Due: 5 p.m. ET 8/20/19.
Docket Numbers: ER19–2495–000.
Applicants: Wessington Springs
Wind, LLC.
Description: Baseline eTariff Filing:
Wessington Springs Wind, LLC
Application for MBR Authority to be
effective 9/29/2019.
Filed Date: 7/30/19.
Accession Number: 20190730–5090.
Comments Due: 5 p.m. ET 8/20/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16621 Filed 8–2–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–193–000]
Columbia Gulf Transmission, L.L.C.;
Notice of Schedule for Environmental
Review of the Mainline 100 and
Mainline 200 Replacement Project
On April 22, 2019, Columbia Gulf
Transmission, L.L.C. (Columbia) filed an
application in Docket No. CP19–193
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(c) and 7(b) of the Natural Gas
Act to construct, operate, and abandon
certain natural gas pipeline facilities.
The proposed project is known as the
Mainline 100 and Mainline 200
Replacement Project (Project). The
Project as proposed would consist of
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 84, No. 150 / Monday, August 5, 2019 / Notices
replacing two older sections of the
Mainline 100 and Mainline 200 with
pipeline containing thicker walls to
minimize safety risks. The Project is
located in Menifee and Montgomery
Counties, Kentucky.
On May 1, 2019, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA—October 25, 2019
90-day Federal Authorization Decision
Deadline—January 23, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
jspears on DSK3GMQ082PROD with NOTICES
Project Description
Columbia proposes replacing
segments of the existing Class 2
Mainline 100 and Mainline 200
pipelines with Class 3 pipelines to meet
the U.S. Department of Transportation’s
safety regulations. The replacement of
Mainline 100 and Mainline 200 consists
of the abandonment and replacement of
approximately 2,650 feet of 30-inchdiameter natural gas transmission
pipeline, within Montgomery and
Menifee Counties, Kentucky.
Background
On July 12, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Mainline 100 and Mainline
200 Replacement Project and Request
for Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; and
other interested parties. To date, no
comments have been received in
response to the NOI. All substantive
comments will be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
VerDate Sep<11>2014
18:42 Aug 02, 2019
Jkt 247001
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP19–193), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16625 Filed 8–2–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL19–86–000]
New York State Public Service
Commission and New York State
Energy Research and Development
Authority v. New York Independent
System Operator, Inc.; Notice of
Complaint
Take notice that on July 29, 2019,
pursuant to sections 206 and 306 of the
Federal Power Act (FPA), 16 U.S.C.
824e and 825e and Rule 206 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206,
New York State Public Service
Commission and New York State Energy
Research and Development Authority
(collectively, Complainants), filed a
formal complaint against New York
Independent System Operator, Inc.
(NYISO or Respondent) alleging that
application of the NYISO’s buyer-side
market (BSM) power mitigation
measures contained in section 23.4 of
attachment H of the NYISO’s Market
Administration and Control Area
Services Tariff results in BSM rules that
limit full market entry and participation
by Energy Storage Resources and
PO 00000
Frm 00042
Fmt 4703
Sfmt 9990
38027
interfere with Federal and State policy
objectives and, therefore, are unjust and
unreasonable, as more fully explained
in the complaint.
Complainants certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 19, 2019.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16622 Filed 8–2–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 84, Number 150 (Monday, August 5, 2019)]
[Notices]
[Pages 38026-38027]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16625]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-193-000]
Columbia Gulf Transmission, L.L.C.; Notice of Schedule for
Environmental Review of the Mainline 100 and Mainline 200 Replacement
Project
On April 22, 2019, Columbia Gulf Transmission, L.L.C. (Columbia)
filed an application in Docket No. CP19-193 requesting a Certificate of
Public Convenience and Necessity pursuant to Section 7(c) and 7(b) of
the Natural Gas Act to construct, operate, and abandon certain natural
gas pipeline facilities. The proposed project is known as the Mainline
100 and Mainline 200 Replacement Project (Project). The Project as
proposed would consist of
[[Page 38027]]
replacing two older sections of the Mainline 100 and Mainline 200 with
pipeline containing thicker walls to minimize safety risks. The Project
is located in Menifee and Montgomery Counties, Kentucky.
On May 1, 2019, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--October 25, 2019
90-day Federal Authorization Decision Deadline--January 23, 2020
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Columbia proposes replacing segments of the existing Class 2
Mainline 100 and Mainline 200 pipelines with Class 3 pipelines to meet
the U.S. Department of Transportation's safety regulations. The
replacement of Mainline 100 and Mainline 200 consists of the
abandonment and replacement of approximately 2,650 feet of 30-inch-
diameter natural gas transmission pipeline, within Montgomery and
Menifee Counties, Kentucky.
Background
On July 12, 2019, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Mainline 100 and
Mainline 200 Replacement Project and Request for Comments on
Environmental Issues (NOI). The NOI was sent to affected landowners;
federal, state, and local government agencies; elected officials;
environmental and public interest groups; Native American tribes; and
other interested parties. To date, no comments have been received in
response to the NOI. All substantive comments will be addressed in the
EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP19-193), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16625 Filed 8-2-19; 8:45 am]