Northern Natural Gas Company; Notice of Schedule for Environmental Review of The Bushton to Clifton A-Line Abandonment Project, 38028 [2019-16623]
Download as PDF
38028
Federal Register / Vol. 84, No. 150 / Monday, August 5, 2019 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–479–000]
Northern Natural Gas Company; Notice
of Schedule for Environmental Review
of The Bushton to Clifton A-Line
Abandonment Project
On June 7, 2019, Northern Natural
Gas Company (Northern) filed an
application in Docket No. CP19–479
requesting a Certificate of Public
Convenience and Necessity pursuant to
Section 7(b) and 7(c) of the Natural Gas
Act to abandon, construct, and operate
certain natural gas pipeline facilities.
The proposed project is known as the
Bushton to Clifton A-line Abandonment
Project (Project). The Project would
consist of abandoning in-place segments
of Northern’s A-line and J-line facilities
and constructing modifications at the
existing Tescott Compressor Station.
Due to the age of the pipeline, Northern
has been operating segments of the Aline and J-line at reduced pressures to
minimize safety risks, and the proposed
abandonment will eliminate these safety
concerns. The Project is located in Clay,
Cloud, Ellsworth, Lincoln, Ottawa, and
Rice Counties, Kansas.
On June 16, 2019, the Federal Energy
Regulatory Commission (Commission or
FERC) issued its Notice of Application
for the Project. Among other things, that
notice alerted agencies issuing federal
authorizations of the requirement to
complete all necessary reviews and to
reach a final decision on a request for
a federal authorization within 90 days of
the date of issuance of the Commission
staff’s Environmental Assessment (EA)
for the Project. This instant notice
identifies the FERC staff’s planned
schedule for the completion of the EA
for the Project.
Schedule for Environmental Review
Issuance of EA—November 8, 2019
90-day Federal Authorization Decision
Deadline—February 6, 2020
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
jspears on DSK3GMQ082PROD with NOTICES
Project Description
Northern is proposing to abandon inplace the A-line facilities consisting of
approximately 92.76 miles of 26-inchdiameter pipeline on Northern’s M640A
and M630A and 15.74 miles of 24-inchdiameter pipeline on its M640J pipeline
systems and other appurtenant facilities.
VerDate Sep<11>2014
18:42 Aug 02, 2019
Jkt 247001
The Project would consist of the
following pipelines and facilities:
• The M640A and M630A-lines:
Abandonment of the M640 A-line in
Kansas consists of approximately 45.64
miles of 26-inch-diameter pipeline
beginning at Northern’s Bushton
Compressor Station located in Ellsworth
County, Kansas, and ending near the
Tescott Compressor Station in Ottawa
County, Kansas. Abandonment of the
M630 A-line in Kansas consists of
approximately 47.12 miles of 26-inchdiameter pipeline beginning at the
Tescott Compressor Station and ending
at Northern’s Clifton Compressor
Station located in Clay County, Kansas.
• The M640 J-line: Abandonment of
the M640 J-line in Kansas consists of
approximately 15.74 miles of 24-inchdiameter pipeline beginning at Block
Valve JBJ04 located in Ellsworth
County, Kansas, and ending near Block
Valve JXA07 located in Ottawa County,
Kansas.
• Tescott Compressor Station:
Northern proposes to construct and
operate an additional natural gas-driven
ISO rated 11,152 horsepower Solar Mars
turbine unit (Unit No. 6) at the existing
Tescott Compressor Station. The unit
will tie into station piping that is
connected to Northern’s existing
mainlines. Approximately 85 feet of 24inch-diameter station piping,
approximately 40 feet of 36-inchdiameter station piping, and
approximately 80 feet of 8-inchdiameter station piping will be removed
to accommodate tie-ins.
After abandonment, Northern will
continue to operate the other pipelines
in its right-of-way and maintain its
pipeline easements with the exception
of a segment of J-line that will be
abandoned in-place.
Background
On July 16, 2019, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Bushton to Clifton A-Line
Abandonment Project and Request for
Comments on Environmental Issues
(NOI). The NOI was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties. To date, no comments
have been received in response to the
NOI. All substantive comments will be
addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
eLibrary link, select General Search
from the eLibrary menu, enter the
selected date range and Docket Number
excluding the last three digits (i.e.,
CP19–479), and follow the instructions.
For assistance with access to eLibrary,
the helpline can be reached at (866)
208–3676, TTY (202) 502–8659, or at
FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16623 Filed 8–2–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP19–1401–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—Chevron to EcoEnergy eff 8–1–19 to be effective 8/1/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5028.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1402–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Boston releases to
SFE eff 8–1–19 to be effective 8/1/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5033.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: RP19–1403–000.
Applicants: Big Sandy Pipeline, LLC.
Description: Compliance filing Big
Sandy Fuel Filing effective 9/1/2019.
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 84, Number 150 (Monday, August 5, 2019)]
[Notices]
[Page 38028]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16623]
[[Page 38028]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-479-000]
Northern Natural Gas Company; Notice of Schedule for
Environmental Review of The Bushton to Clifton A-Line Abandonment
Project
On June 7, 2019, Northern Natural Gas Company (Northern) filed an
application in Docket No. CP19-479 requesting a Certificate of Public
Convenience and Necessity pursuant to Section 7(b) and 7(c) of the
Natural Gas Act to abandon, construct, and operate certain natural gas
pipeline facilities. The proposed project is known as the Bushton to
Clifton A-line Abandonment Project (Project). The Project would consist
of abandoning in-place segments of Northern's A-line and J-line
facilities and constructing modifications at the existing Tescott
Compressor Station. Due to the age of the pipeline, Northern has been
operating segments of the A-line and J-line at reduced pressures to
minimize safety risks, and the proposed abandonment will eliminate
these safety concerns. The Project is located in Clay, Cloud,
Ellsworth, Lincoln, Ottawa, and Rice Counties, Kansas.
On June 16, 2019, the Federal Energy Regulatory Commission
(Commission or FERC) issued its Notice of Application for the Project.
Among other things, that notice alerted agencies issuing federal
authorizations of the requirement to complete all necessary reviews and
to reach a final decision on a request for a federal authorization
within 90 days of the date of issuance of the Commission staff's
Environmental Assessment (EA) for the Project. This instant notice
identifies the FERC staff's planned schedule for the completion of the
EA for the Project.
Schedule for Environmental Review
Issuance of EA--November 8, 2019
90-day Federal Authorization Decision Deadline--February 6, 2020
If a schedule change becomes necessary, additional notice will be
provided so that the relevant agencies are kept informed of the
Project's progress.
Project Description
Northern is proposing to abandon in-place the A-line facilities
consisting of approximately 92.76 miles of 26-inch-diameter pipeline on
Northern's M640A and M630A and 15.74 miles of 24-inch-diameter pipeline
on its M640J pipeline systems and other appurtenant facilities. The
Project would consist of the following pipelines and facilities:
The M640A and M630A-lines: Abandonment of the M640 A-line
in Kansas consists of approximately 45.64 miles of 26-inch-diameter
pipeline beginning at Northern's Bushton Compressor Station located in
Ellsworth County, Kansas, and ending near the Tescott Compressor
Station in Ottawa County, Kansas. Abandonment of the M630 A-line in
Kansas consists of approximately 47.12 miles of 26-inch-diameter
pipeline beginning at the Tescott Compressor Station and ending at
Northern's Clifton Compressor Station located in Clay County, Kansas.
The M640 J-line: Abandonment of the M640 J-line in Kansas
consists of approximately 15.74 miles of 24-inch-diameter pipeline
beginning at Block Valve JBJ04 located in Ellsworth County, Kansas, and
ending near Block Valve JXA07 located in Ottawa County, Kansas.
Tescott Compressor Station: Northern proposes to construct
and operate an additional natural gas-driven ISO rated 11,152
horsepower Solar Mars turbine unit (Unit No. 6) at the existing Tescott
Compressor Station. The unit will tie into station piping that is
connected to Northern's existing mainlines. Approximately 85 feet of
24-inch-diameter station piping, approximately 40 feet of 36-inch-
diameter station piping, and approximately 80 feet of 8-inch-diameter
station piping will be removed to accommodate tie-ins.
After abandonment, Northern will continue to operate the other
pipelines in its right-of-way and maintain its pipeline easements with
the exception of a segment of J-line that will be abandoned in-place.
Background
On July 16, 2019, the Commission issued a Notice of Intent to
Prepare an Environmental Assessment for the Proposed Bushton to Clifton
A-Line Abandonment Project and Request for Comments on Environmental
Issues (NOI). The NOI was sent to affected landowners; federal, state,
and local government agencies; elected officials; environmental and
public interest groups; Native American tribes; other interested
parties. To date, no comments have been received in response to the
NOI. All substantive comments will be addressed in the EA.
Additional Information
In order to receive notification of the issuance of the EA and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Additional information about the Project is available from the
Commission's Office of External Affairs at (866) 208-FERC or on the
FERC website (www.ferc.gov). Using the eLibrary link, select General
Search from the eLibrary menu, enter the selected date range and Docket
Number excluding the last three digits (i.e., CP19-479), and follow the
instructions. For assistance with access to eLibrary, the helpline can
be reached at (866) 208-3676, TTY (202) 502-8659, or at
[email protected]. The eLibrary link on the FERC website also
provides access to the texts of formal documents issued by the
Commission, such as orders, notices, and rule makings.
Dated: July 30, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16623 Filed 8-2-19; 8:45 am]
BILLING CODE 6717-01-P