Combined Notice of Filings #1, 37856-37857 [2019-16488]
Download as PDF
37856
Federal Register / Vol. 84, No. 149 / Friday, August 2, 2019 / Notices
Abstract: Ronald E. McNair
Postbaccalaureate Achievement
(McNair) Program grantees must submit
the Annual Performance Report each
year. The reports are used to evaluate
grantees’ performance for substantial
progress, respond to the Government
Performance and Results Act (GPRA),
and award prior experience points at the
end of each project (budget) period. The
Department also aggregates the data to
provide descriptive information on the
projects and to analyze the impact of the
McNair Program on the academic
progress of participating students.
Dated: July 29, 2019.
Kate Mullan,
PRA Coordinator, Information Collection
Clearance Program, Information Management
Branch, Office of the Chief Information
Officer.
Dated: July 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16563 Filed 8–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
[Docket No. EL18–109–000]
Portland General Electric Company;
Notice of Filing
Pursuant to the Federal
Advisory Committee Act, App. 2, and
the Code of Federal Regulations, and
following consultation with the
Committee Management Secretariat,
General Services Administration, notice
is hereby given that the Basic Energy
Sciences Advisory Committee’s
(BESAC) charter will be renewed for a
two-year period.
The Committee will provide advice
and recommendations to the Office of
Science on the Basic Energy Sciences
program.
Additionally, the renewal of the
BESAC has been determined to be
essential to conduct business of the
Department of Energy and to be in the
public interest in connection with the
performance of duties imposed upon the
Department of Energy, by law and
agreement. The Committee will
continue to operate in accordance with
the provisions of the Federal Advisory
Committee Act, the rules and
regulations in implementation of that
Act.
Dr.
Harriet Kung at (301) 903–3081 or
email: harriet.kung@science.doe.gov.
1 Alcoa Power Generation, Inc.—Long Sault
Division, et al., 162 FERC ¶ 61,224 (2018) (Show
Cause Order).
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Basic Energy Sciences Advisory
Committee
Office of Science, Department
of Energy.
AGENCY:
ACTION:
Notice of renewal.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
VerDate Sep<11>2014
18:02 Aug 01, 2019
Jkt 247001
[FR Doc. 2019–16460 Filed 8–1–19; 8:45 am]
BILLING CODE 6450–01–P
Take notice that on July 25, 2019,
Portland General Electric Company
submitted a response (Supplemental
Rate Analysis) to the March 15, 2018
Show Cause Order.1
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the website that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on August 15, 2019.
[FR Doc. 2019–16451 Filed 8–1–19; 8:45 am]
jbell on DSK3GLQ082PROD with NOTICES
Signed in Washington, DC, on July 26,
2019.
Rachael J. Beitler,
Committee Management Officer.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–77–001.
Applicants: Twin Eagle Resource
Management, LLC, Public Service
Company of Colorado.
Description: Notification of
Consummation and Change in
Circumstances of Xcel Energy Services
Inc., on behalf of Public Service
Company of Colorado, et al.
Filed Date: 7/26/19.
Accession Number: 20190726–5193.
Comments Due: 5 p.m. ET 8/5/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER19–1166–000.
Applicants: ISO New England Inc.
Description: Response of ISO New
England Inc. to July 27, 2019 Request for
Additional Information (Non-Disclosure
Agreement).
Filed Date: 7/26/19.
Accession Number: 20190726–5197.
Comments Due: 5 p.m. ET 8/2/19.
Docket Numbers: ER19–1641–001.
Applicants: California Independent
System Operator Corporation.
Description: Tariff Amendment:
2019–07–26 Response to Deficiency
Letter—RMR CPM Enhancements to be
effective 9/27/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5002.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–1704–002.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: Tariff Amendment:
2019–07–26_SA 2010 Ameren-SIPC
Second Substitute WDS Agreement to
be effective 7/1/2019.
Filed Date: 7/26/19.
Accession Number: 20190726–5145.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19–1718–001.
Applicants: Duke Energy Florida,
LLC.
Description: Tariff Amendment: DEF
IA Annual Cost Factor Filing (2019)
Response to Deficiency Letter to be
effective 5/1/2019.
E:\FR\FM\02AUN1.SGM
02AUN1
Federal Register / Vol. 84, No. 149 / Friday, August 2, 2019 / Notices
Filed Date: 7/26/19.
Accession Number: 20190726–5135.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19–2099–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–07–26_Amendment to Stage 1B of
ARR Allocation Process filing to be
effective 8/11/2019.
Filed Date: 7/26/19.
Accession Number: 20190726–5150.
Comments Due: 5 p.m. ET 8/5/19.
Docket Numbers: ER19–2476–000.
Applicants: Techren Solar II LLC.
Description: Baseline eTariff Filing:
Application for MBR, Waivers, Blanket
Authority, Confidential & Expedited
Action to be effective 12/31/9998.
Filed Date: 7/26/19.
Accession Number: 20190726–5148.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19–2478–000.
Applicants: Dynegy Resources
Management, LLC.
Description: Tariff Cancellation:
Cancellation of market-based rate tariff
to be effective 7/30/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5047.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2479–000.
Applicants: Aera Energy LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5095.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2480–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
Odom Solar Affected System
Construction Agreement Filing to be
effective 6/27/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5096.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2481–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
Lancaster Solar Affected System
Construction Agreement Filing to be
effective 6/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5102.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2482–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2446R2 Municipal Energy Agency of
Nebraska NITSA and NOA to be
effective 7/1/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5114.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2484–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3095R2 Missouri River Energy Services
NITSA and NOA to be effective 7/1/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5121.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2485–000.
Applicants: Imperial Valley Solar 2,
LLC.
Description: § 205(d) Rate Filing: COC
Cost True Filing to be effective 7/30/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5125.
Comments Due: 5 p.m. ET 8/19/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–45–000;
ES19–46–000
Applicants: AEP Generating
Company, Kingsport Power Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of AEP
Generating Company, et al.
Filed Date: 7/29/19.
Date and time
(Alaska daylight time)
Tuesday September 10, 2019, 5:00–8:00 p.m ...
jbell on DSK3GLQ082PROD with NOTICES
Wednesday September 11, 2019, 5:00–8:00
p.m.
Thursday September 12, 2019, 5:00–8:00 p.m
Other federal agency representatives
may also be in attendance and available
to answer questions about their
respective roles and reviews. Each
comment meeting is scheduled from
18:02 Aug 01, 2019
Jkt 247001
Accession Number: 20190729–5079.
Comments Due: 5 p.m. ET 8/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16488 Filed 8–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–178–000]
Notice of Dates and Locations for
Public Comment Meetings on the Draft
Environmental Impact Statement for
the Alaska Gasline Development
Corporation Alaska LNG Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will be present to receive
comments on the draft Environmental
Impact Statement for the Alaska LNG
Project (Project) as follows:
Public comment meeting locations
Monday September 9, 2019, 5:00–8:00 p.m ......
VerDate Sep<11>2014
37857
Inupiat Heritage Center, 5421 North Star Street, Utqiagvik, AK 99723.
Trapper Creek Elementary School, 6742 Petersville Road, Trapper Creek, AK 99683.
Nuiqsut Kisik Community Center, 2230 Second Avenue, Nuiqsut, AK 99789.
Houston Fire Station 9–1, 13965 W Armstrong Road, Houston, AK 99694.
Tri-Valley Community Center, 0.5 Mile Healy Spur Rd., Healy, AK 99743.
Nikiski Recreation Center—Banquet Hall, Mile 23.4 Kenai Spur Highway, Nikiski, AK 99611.
Morris Thompson Cultural and Visitor’s Center, 101 Dunkel Street, Fairbanks, AK 99701.
Dena’ina Center Khatnu 1 Room, 600 West Seventh Avenue, Anchorage, AK 99501.
5:00 p.m. to 8:00 p.m. (Alaska Daylight
Time). However, staff may conclude the
meeting early if all individuals who
wish to provide comments have had an
opportunity to do so.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
The primary goal of the public
comment meetings is to have you
identify specific environmental issues
and concerns with the draft
Environmental Impact Statement. All
E:\FR\FM\02AUN1.SGM
02AUN1
Agencies
[Federal Register Volume 84, Number 149 (Friday, August 2, 2019)]
[Notices]
[Pages 37856-37857]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16488]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-77-001.
Applicants: Twin Eagle Resource Management, LLC, Public Service
Company of Colorado.
Description: Notification of Consummation and Change in
Circumstances of Xcel Energy Services Inc., on behalf of Public Service
Company of Colorado, et al.
Filed Date: 7/26/19.
Accession Number: 20190726-5193.
Comments Due: 5 p.m. ET 8/5/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER19-1166-000.
Applicants: ISO New England Inc.
Description: Response of ISO New England Inc. to July 27, 2019
Request for Additional Information (Non-Disclosure Agreement).
Filed Date: 7/26/19.
Accession Number: 20190726-5197.
Comments Due: 5 p.m. ET 8/2/19.
Docket Numbers: ER19-1641-001.
Applicants: California Independent System Operator Corporation.
Description: Tariff Amendment: 2019-07-26 Response to Deficiency
Letter--RMR CPM Enhancements to be effective 9/27/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5002.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-1704-002.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Tariff Amendment: 2019-07-26_SA 2010 Ameren-SIPC
Second Substitute WDS Agreement to be effective 7/1/2019.
Filed Date: 7/26/19.
Accession Number: 20190726-5145.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19-1718-001.
Applicants: Duke Energy Florida, LLC.
Description: Tariff Amendment: DEF IA Annual Cost Factor Filing
(2019) Response to Deficiency Letter to be effective 5/1/2019.
[[Page 37857]]
Filed Date: 7/26/19.
Accession Number: 20190726-5135.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19-2099-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2019-07-26_Amendment to Stage 1B of
ARR Allocation Process filing to be effective 8/11/2019.
Filed Date: 7/26/19.
Accession Number: 20190726-5150.
Comments Due: 5 p.m. ET 8/5/19.
Docket Numbers: ER19-2476-000.
Applicants: Techren Solar II LLC.
Description: Baseline eTariff Filing: Application for MBR, Waivers,
Blanket Authority, Confidential & Expedited Action to be effective 12/
31/9998.
Filed Date: 7/26/19.
Accession Number: 20190726-5148.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19-2478-000.
Applicants: Dynegy Resources Management, LLC.
Description: Tariff Cancellation: Cancellation of market-based rate
tariff to be effective 7/30/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5047.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2479-000.
Applicants: Aera Energy LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
to be effective 9/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5095.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2480-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: Odom Solar Affected System
Construction Agreement Filing to be effective 6/27/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5096.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2481-000.
Applicants: Georgia Power Company.
Description: Sec. 205(d) Rate Filing: Lancaster Solar Affected
System Construction Agreement Filing to be effective 6/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5102.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2482-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2446R2 Municipal Energy
Agency of Nebraska NITSA and NOA to be effective 7/1/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5114.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2484-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3095R2 Missouri River Energy
Services NITSA and NOA to be effective 7/1/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5121.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19-2485-000.
Applicants: Imperial Valley Solar 2, LLC.
Description: Sec. 205(d) Rate Filing: COC Cost True Filing to be
effective 7/30/2019.
Filed Date: 7/29/19.
Accession Number: 20190729-5125.
Comments Due: 5 p.m. ET 8/19/19.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES19-45-000; ES19-46-000
Applicants: AEP Generating Company, Kingsport Power Company.
Description: Application under Section 204 of the Federal Power Act
for Authorization to Issue Securities of AEP Generating Company, et al.
Filed Date: 7/29/19.
Accession Number: 20190729-5079.
Comments Due: 5 p.m. ET 8/19/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16488 Filed 8-1-19; 8:45 am]
BILLING CODE 6717-01-P