Notice of Dates and Locations for Public Comment Meetings on the Draft Environmental Impact Statement for the Alaska Gasline Development Corporation Alaska LNG Project, 37857-37858 [2019-16456]
Download as PDF
Federal Register / Vol. 84, No. 149 / Friday, August 2, 2019 / Notices
Filed Date: 7/26/19.
Accession Number: 20190726–5135.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19–2099–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2019–07–26_Amendment to Stage 1B of
ARR Allocation Process filing to be
effective 8/11/2019.
Filed Date: 7/26/19.
Accession Number: 20190726–5150.
Comments Due: 5 p.m. ET 8/5/19.
Docket Numbers: ER19–2476–000.
Applicants: Techren Solar II LLC.
Description: Baseline eTariff Filing:
Application for MBR, Waivers, Blanket
Authority, Confidential & Expedited
Action to be effective 12/31/9998.
Filed Date: 7/26/19.
Accession Number: 20190726–5148.
Comments Due: 5 p.m. ET 8/16/19.
Docket Numbers: ER19–2478–000.
Applicants: Dynegy Resources
Management, LLC.
Description: Tariff Cancellation:
Cancellation of market-based rate tariff
to be effective 7/30/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5047.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2479–000.
Applicants: Aera Energy LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5095.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2480–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
Odom Solar Affected System
Construction Agreement Filing to be
effective 6/27/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5096.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2481–000.
Applicants: Georgia Power Company.
Description: § 205(d) Rate Filing:
Lancaster Solar Affected System
Construction Agreement Filing to be
effective 6/28/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5102.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2482–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2446R2 Municipal Energy Agency of
Nebraska NITSA and NOA to be
effective 7/1/2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5114.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2484–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3095R2 Missouri River Energy Services
NITSA and NOA to be effective 7/1/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5121.
Comments Due: 5 p.m. ET 8/19/19.
Docket Numbers: ER19–2485–000.
Applicants: Imperial Valley Solar 2,
LLC.
Description: § 205(d) Rate Filing: COC
Cost True Filing to be effective 7/30/
2019.
Filed Date: 7/29/19.
Accession Number: 20190729–5125.
Comments Due: 5 p.m. ET 8/19/19.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES19–45–000;
ES19–46–000
Applicants: AEP Generating
Company, Kingsport Power Company.
Description: Application under
Section 204 of the Federal Power Act for
Authorization to Issue Securities of AEP
Generating Company, et al.
Filed Date: 7/29/19.
Date and time
(Alaska daylight time)
Tuesday September 10, 2019, 5:00–8:00 p.m ...
jbell on DSK3GLQ082PROD with NOTICES
Wednesday September 11, 2019, 5:00–8:00
p.m.
Thursday September 12, 2019, 5:00–8:00 p.m
Other federal agency representatives
may also be in attendance and available
to answer questions about their
respective roles and reviews. Each
comment meeting is scheduled from
18:02 Aug 01, 2019
Jkt 247001
Accession Number: 20190729–5079.
Comments Due: 5 p.m. ET 8/19/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 29, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16488 Filed 8–1–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP17–178–000]
Notice of Dates and Locations for
Public Comment Meetings on the Draft
Environmental Impact Statement for
the Alaska Gasline Development
Corporation Alaska LNG Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will be present to receive
comments on the draft Environmental
Impact Statement for the Alaska LNG
Project (Project) as follows:
Public comment meeting locations
Monday September 9, 2019, 5:00–8:00 p.m ......
VerDate Sep<11>2014
37857
Inupiat Heritage Center, 5421 North Star Street, Utqiagvik, AK 99723.
Trapper Creek Elementary School, 6742 Petersville Road, Trapper Creek, AK 99683.
Nuiqsut Kisik Community Center, 2230 Second Avenue, Nuiqsut, AK 99789.
Houston Fire Station 9–1, 13965 W Armstrong Road, Houston, AK 99694.
Tri-Valley Community Center, 0.5 Mile Healy Spur Rd., Healy, AK 99743.
Nikiski Recreation Center—Banquet Hall, Mile 23.4 Kenai Spur Highway, Nikiski, AK 99611.
Morris Thompson Cultural and Visitor’s Center, 101 Dunkel Street, Fairbanks, AK 99701.
Dena’ina Center Khatnu 1 Room, 600 West Seventh Avenue, Anchorage, AK 99501.
5:00 p.m. to 8:00 p.m. (Alaska Daylight
Time). However, staff may conclude the
meeting early if all individuals who
wish to provide comments have had an
opportunity to do so.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
The primary goal of the public
comment meetings is to have you
identify specific environmental issues
and concerns with the draft
Environmental Impact Statement. All
E:\FR\FM\02AUN1.SGM
02AUN1
37858
Federal Register / Vol. 84, No. 149 / Friday, August 2, 2019 / Notices
verbal comments will be recorded by a
Court Reporter and become part of the
public record for these proceedings.
Transcripts of all comments from the
meetings will be publicly available on
FERC’s website (www.ferc.gov) through
our eLibrary system. It is important to
note that written comments mailed to
the Commission and those submitted
electronically are reviewed by staff with
the same scrutiny and consideration as
the verbal comments given at the public
comment meetings. Therefore, you do
not need to attend a meeting in order for
your comments to be considered.
The Bureau of Land Management will
hold public subsistence hearings and
solicit public testimony in two
Date and time
(Alaska time)
Subsistence hearing location
Tuesday, September 17, 2019, 6:00–9:00 p.m ..
Thursday, September 19, 2019, 6:00–9:00 p.m
jbell on DSK3GLQ082PROD with NOTICES
As a reminder, the Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions for
your electronic or written comments so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on the Project.
(2) You can file your comments
electronically by using the eFiling
feature on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on eRegister. If you are filing a
comment on a particular project, please
select Comment on a Filing as the filing
type. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission’s
website https://www.ferc.gov/docs-filing/
efiling.asp.
(3) You can file a paper copy of your
comments by mailing them to the
following address. Be sure to reference
the Project docket number (CP17–178–
000) with your submission: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Dated: July 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16456 Filed 8–1–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:02 Aug 01, 2019
additional potentially affected
communities as a part of its
consideration under Section 810(a) of
the Alaska National Interest Lands
Conservation Act. The Bureau of Land
Management will conduct those
hearings at the following locations and
times:
Jkt 247001
Anaktuvuk Pass Community Center, 3031 Main Street, Anaktuvuk Pass, AK 99721.
Kaktovik Community Center, 2051 Barter Avenue, Kaktovik, AK 99747.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–489–000]
Notice of Request Under Blanket
Authorization; El Paso Natural Gas
Company, L.L.C.
Take notice that on July 16, 2019, El
Paso Natural Gas Company, L.L.C. (El
Paso) Post Office Box 1087, Colorado
Springs, Colorado 80944, filed a prior
notice request pursuant to sections
157.205, 157.208(b), and 157.210 of the
Commission’s regulations under the
Natural Gas Act for authorization to
replace the driver for one of its existing
compressors at its existing Waha
Compressor Station located in Reeves
County, Texas. This project is referred
to as El Paso’s Waha Compressor Station
Project. The total cost of this Project is
approximately $16.2 million and the
target in-service date for the proposed
replacement EMD unit is second quarter
of 2020, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed
Francisco Tarin, Director, Regulatory, El
Paso Natural Gas Company, L.L.C.; P.O.
Box 1087, Colorado Springs, Colorado
80944 at (719) 667–7517 or by fax at
(719) 520–4697, or David K. Dewey,
Vice President Managing Counsel, El
Paso Natural Gas Company, L.L.C.; P.O.
Box 1087, Colorado Springs, Colorado
80944 at (719) 520–4227 or by fax at
(719) 520–4898.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
More specifically, El Paso and
Enterprise Field Service, LLC
(Enterprise) had a shared interest in the
existing compressor unit through an
operating agreement; where Enterprise
was to operate and maintain the existing
gas compressor unit. However, in 2017
the compressor unit stopped working
due to mechanical issues. Enterprise
averred that the unit had exceeded its
useful life and decommissioned the
unit. Herein, El Paso is proposing to
construct and operate one 10,000
horsepower electric motor drive (EMD)
unit in place of the lost horsepower and
capacity formerly provided by the
decommissioned unit operated by
Enterprise.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
E:\FR\FM\02AUN1.SGM
02AUN1
Agencies
[Federal Register Volume 84, Number 149 (Friday, August 2, 2019)]
[Notices]
[Pages 37857-37858]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16456]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP17-178-000]
Notice of Dates and Locations for Public Comment Meetings on the
Draft Environmental Impact Statement for the Alaska Gasline Development
Corporation Alaska LNG Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will be present to receive comments on the draft
Environmental Impact Statement for the Alaska LNG Project (Project) as
follows:
------------------------------------------------------------------------
Date and time (Alaska
daylight time) Public comment meeting locations
------------------------------------------------------------------------
Monday September 9, 2019, Inupiat Heritage Center, 5421 North Star
5:00-8:00 p.m. Street, Utqiagvik, AK 99723.
Trapper Creek Elementary School, 6742
Petersville Road, Trapper Creek, AK
99683.
Tuesday September 10, 2019, Nuiqsut Kisik Community Center, 2230
5:00-8:00 p.m. Second Avenue, Nuiqsut, AK 99789.
Houston Fire Station 9-1, 13965 W
Armstrong Road, Houston, AK 99694.
Wednesday September 11, 2019, Tri-Valley Community Center, 0.5 Mile
5:00-8:00 p.m. Healy Spur Rd., Healy, AK 99743.
Nikiski Recreation Center--Banquet Hall,
Mile 23.4 Kenai Spur Highway, Nikiski,
AK 99611.
Thursday September 12, 2019, Morris Thompson Cultural and Visitor's
5:00-8:00 p.m. Center, 101 Dunkel Street, Fairbanks, AK
99701.
Dena'ina Center Khatnu 1 Room, 600 West
Seventh Avenue, Anchorage, AK 99501.
------------------------------------------------------------------------
Other federal agency representatives may also be in attendance and
available to answer questions about their respective roles and reviews.
Each comment meeting is scheduled from 5:00 p.m. to 8:00 p.m. (Alaska
Daylight Time). However, staff may conclude the meeting early if all
individuals who wish to provide comments have had an opportunity to do
so.
The primary goal of the public comment meetings is to have you
identify specific environmental issues and concerns with the draft
Environmental Impact Statement. All
[[Page 37858]]
verbal comments will be recorded by a Court Reporter and become part of
the public record for these proceedings. Transcripts of all comments
from the meetings will be publicly available on FERC's website
(www.ferc.gov) through our eLibrary system. It is important to note
that written comments mailed to the Commission and those submitted
electronically are reviewed by staff with the same scrutiny and
consideration as the verbal comments given at the public comment
meetings. Therefore, you do not need to attend a meeting in order for
your comments to be considered.
The Bureau of Land Management will hold public subsistence hearings
and solicit public testimony in two additional potentially affected
communities as a part of its consideration under Section 810(a) of the
Alaska National Interest Lands Conservation Act. The Bureau of Land
Management will conduct those hearings at the following locations and
times:
------------------------------------------------------------------------
Date and time (Alaska time) Subsistence hearing location
------------------------------------------------------------------------
Tuesday, September 17, 2019, Anaktuvuk Pass Community Center, 3031
6:00-9:00 p.m. Main Street, Anaktuvuk Pass, AK 99721.
Thursday, September 19, 2019, Kaktovik Community Center, 2051 Barter
6:00-9:00 p.m. Avenue, Kaktovik, AK 99747.
------------------------------------------------------------------------
As a reminder, the Commission encourages electronic filing of
comments and has staff available to assist you at (866) 208-3676 or
[email protected]. Please carefully follow these instructions
for your electronic or written comments so that your comments are
properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for submitting brief,
text-only comments on the Project.
(2) You can file your comments electronically by using the eFiling
feature on the Commission's website (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
eRegister. If you are filing a comment on a particular project, please
select Comment on a Filing as the filing type. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's website
https://www.ferc.gov/docs-filing/efiling.asp.
(3) You can file a paper copy of your comments by mailing them to
the following address. Be sure to reference the Project docket number
(CP17-178-000) with your submission: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426.
Dated: July 26, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16456 Filed 8-1-19; 8:45 am]
BILLING CODE 6717-01-P