Federal Register / Vol. 84, No. 147 / Wednesday, July 31, 2019 / Notices
e. Name of Project: Turners Falls
Project.
f. Location: On the Connecticut River,
in the power canal of the Turners Falls
Hydroelectric Project No. 1889, in
Franklin County, Massachusetts. No
federal lands are occupied by the project
works or located within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Michael
Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 65 Madison
Avenue, Suite 500, Morristown, NJ
07960; Phone at (973) 998–8400, or
email at michael.scarzello@
eaglecreekre.com.
i. FERC Contact: Amanda Gill, (202)
502–6773 or amanda.gill@ferc.gov.
j. Deadline for filing scoping
comments: August 24, 2019.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–2622–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. Project Description: The Turners
Falls Project consists of: (1) An existing
10-foot-long, 20-foot-wide, 12- to 22foot-high forebay; (2) a 20-foot-wide, 22foot-high trashrack with 1.5-inch clearbar spacing; (3) two 9.75-foot-wide,
10.3-foot-high headgates; (4) an 8.5-footdiameter, 50-foot-long steel penstock;
(5) a 77-foot-long, 42-foot-wide
powerhouse containing one 937kilowatt vertical Francis-type turbinegenerator unit; (6) a 50-foot-long, 10-
VerDate Sep<11>2014
20:09 Jul 30, 2019
Jkt 247001
foot-diameter draft tube; (7) an 80-footlong, 10-foot-wide tailrace; (8) a 280foot-long, 2.3-kilovolt generator lead
line that connects the generator to a
step-up transformer; (9) and
appurtenant facilities.
When generating, the project
withdraws up to 289 cubic feet per
second from FirstLight Hydro
Generating Company’s (FirstLight)
power canal for the Turners Falls
Hydroelectric Project No. 1889, and
discharges directly into the Connecticut
River. Turners Falls Hydro coordinates
project operation with FirstLight via an
off-license Water Use Agreement, which
allows Turners Falls Hydro to generate
only when flows within the power canal
are greater than 15,000 cubic feet per
second (cfs) and the needs of
FirstLight’s Turners Falls Hydroelectric
Project No. 1889 are met. When
operating the project, Turners Falls
Hydro uses the 289-cfs maximum
hydraulic capacity of the turbine for
hydroelectric generation and does not
fluctuate its water use. The average
annual generation of the project is
approximately 1,512 megawatt-hours.
Turners Falls Hydro proposes to
operate the project either: (1) On a
continuous basis between the project’s
minimum and maximum hydraulic
capacities (60 cfs and 289 cfs,
respectively), without the operating
constraints of the off-license Water Use
Agreement with FirstLight; (2) pursuant
to the same provisions of the existing
Water Use Agreement with FirstLight; or
(3) pursuant to a modified Water Use
Agreement with FirstLight.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is available for
inspection and reproduction at the
Montague Public Library, Carnegie
Library Branch located at 201 Avenue
A, Turners Falls, MA 01376.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process.
Commission staff intend to prepare a
single Environmental Assessment (EA)
for the project in accordance with the
National Environmental Policy Act. The
EA will consider both site-specific and
cumulative environmental impacts and
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
37271
reasonable alternatives to the proposed
action.
At this time, we do not anticipate
holding on-site public or agency scoping
meetings. Instead, we are soliciting your
comments and suggestions on the
preliminary list of issues and
alternatives to be addressed in the EA,
as described in scoping document 1
(SD1), issued July 25, 2019.
Copies of the SD1 outlining the
subject areas to be addressed in the EA
were distributed to the parties on the
Commission’s mailing list and the
applicant’s distribution list. Copies of
SD1 may be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: July 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16274 Filed 7–30–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC19–116–000.
Applicants: Black River
Hydroelectric, LLC, Cube Yadkin
Generation LLC, Cube Yadkin
Transmission LLC, Lake Lynn
Generation, LLC, PE Hydro Generation,
LLC, OPG Eagle Creek Holdings LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of Black River
Hydroelectric, LLC, et al.
Filed Date: 7/24/19.
Accession Number: 20190724–5145.
Comments Due: 5 p.m. ET 8/14/19.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1836–015;
ER10–2005–014; ER11–26–014; ER10–
1841–014; ER10–1845–014; ER10–1852–
028; ER10–1897–014; ER10–1905–014;
ER10–1907–013; ER10–1918–014;
ER10–1925–014; ER10–1927–014;
ER10–1950–014; ER10–2006–015;
ER18–2246–003; ER10–1964–014;
ER18–1771–004; ER16–1872–005;
ER10–1970–014; ER10–1972–014;
ER16–2506–006; ER10–1983–014;
ER10–1984–014; ER18–2224–004;
E:\FR\FM\31JYN1.SGM
31JYN1
jbell on DSK3GLQ082PROD with NOTICES
37272
Federal Register / Vol. 84, No. 147 / Wednesday, July 31, 2019 / Notices
ER13–2461–009; ER10–1991–014;
ER17–2270–006; ER12–1660–014;
ER13–2458–009; ER10–2078–015;
ER11–4462–035; ER10–1951–014;
ER17–838–010.
Applicants: Ashtabula Wind, LLC,
Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Butler Ridge Wind
Energy Center, LLC, Crystal Lake Wind
III, LLC, Florida Power & Light
Company, FPL Energy Hancock County
Wind, LLC, FPL Energy Mower County,
LLC, FPL Energy North Dakota Wind,
LLC, FPL Energy North Dakota Wind II,
LLC, FPL Energy Oliver Wind I, LLC,
FPL Energy Oliver Wind II, LLC, Garden
Wind, LLC, Hawkeye Power Partners,
LLC, Heartland Divide Wind Project,
LLC, Lake Benton Power Partners II,
LLC, Langdon Renewables, LLC,
Marshall Solar, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy
Point Beach, LLC, Oliver Wind III, LLC,
Osceola Windpower, LLC, Osceola
Windpower II, LLC, Pegasus Wind, LLC,
Pheasant Run Wind, LLC, Story Wind,
LLC, Stuttgart Solar, LLC, Tuscola Bay
Wind, LLC, Tuscola Wind II, LLC,
White Oak Energy LLC, NEPM II, LLC,
NextEra Energy Services Massachusetts,
LLC, NextEra Energy Marketing, LLC.
Description: Notification of Change in
Status of NextEra Resources Entities, et
al.
Filed Date: 7/24/19.
Accession Number: 20190724–5162.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER17–2059–005.
Applicants: Puget Sound Energy, Inc.
Description: Notice of Non-Material
Change in Status of Puget Sound
Energy, Inc.
Filed Date: 7/24/19.
Accession Number: 20190724–5153.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER18–2085–003.
Applicants: Cambria CoGen
Company.
Description: Notification of Change in
Status of Cambria CoGen Company.
Filed Date: 7/25/19.
Accession Number: 20190725–5061.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–1213–001.
Applicants: Wabash Valley Power
Association, Inc.
Description: Tariff Amendment:
ER19–1213–000 Supplemental
Information to be effective 7/25/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5021.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–1680–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
2236R11 Golden Spread Electric
Cooperative, Inc. NITSA NOA
VerDate Sep<11>2014
20:09 Jul 30, 2019
Jkt 247001
Deficiency Respo to be effective
4/1/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5066.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–1964–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
1518R17 Arkansas Electric Cooperative
Corp NITSA NOA)—Amended Filing
and Defi to be effective 7/1/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5024.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2077–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
OATT–Att O–PSCo Deprec–TCJA
Amendment Filing to be effective
1/1/2018.
Filed Date: 7/25/19.
Accession Number: 20190725–5046.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2084–001.
Applicants: Public Service Company
of Colorado.
Description: Tariff Amendment:
2019–7–25 Depreciation Rates & TCJA
to be effective 1/1/2018.
Filed Date: 7/25/19.
Accession Number: 20190725–5043.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2453–000.
Applicants: Lake Lynn Generation,
LLC.
Description: § 205(d) Rate Filing: Info.
Filing Pursuant to Schedule 2 of the
PJM OATT & Baseline Reactive Tariff to
be effective 9/23/2019.
Filed Date: 7/24/19.
Accession Number: 20190724–5126.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19–2454–000.
Applicants: York Haven Power
Company, LLC.
Description: Baseline eTariff Filing:
Info. Filing Pursuant to Schedule 2 of
the PJM OATT & Baseline Reactive
Tariff to be effective 9/23/2019.
Filed Date: 7/24/19.
Accession Number: 20190724–5129.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19–2455–000.
Applicants: Ohio Power Company,
AEP Ohio Transmission Company, Inc.,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
submits ILDSA, Service Agreement No.
1575 with City of Westerville to be
effective 7/1/2019.
Filed Date: 7/24/19.
Accession Number: 20190724–5136.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19–2456–000.
Applicants: Nevada Power Company.
PO 00000
Frm 00043
Fmt 4703
Sfmt 9990
Description: Notice of Cancellation of
Coordination Power Service Agreement
No. 5 of Nevada Power Company.
Filed Date: 7/24/19.
Accession Number: 20190724–5147.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19–2457–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2019–07–25_SA 3333 ITC–DTE Electric
(J793) to be effective 7/11/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5022.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2458–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Guernsey Holdings LGIA Filing to be
effective 7/12/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5040.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2459–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC–NCEMC NITSA (SA No. 210)
Arlington Tap to be effective 7/3/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5057.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19–2460–000.
Applicants: DWW Solar II, LLC.
Description: Baseline eTariff Filing:
MBR Application and Requests for
Waivers, et al. to be effective 9/23/2019.
Filed Date: 7/25/19.
Accession Number: 20190725–5063.
Comments Due: 5 p.m. ET 8/15/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16277 Filed 7–30–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 84, Number 147 (Wednesday, July 31, 2019)]
[Notices]
[Pages 37271-37272]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16277]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC19-116-000.
Applicants: Black River Hydroelectric, LLC, Cube Yadkin Generation
LLC, Cube Yadkin Transmission LLC, Lake Lynn Generation, LLC, PE Hydro
Generation, LLC, OPG Eagle Creek Holdings LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act, et al. of Black River Hydroelectric, LLC, et
al.
Filed Date: 7/24/19.
Accession Number: 20190724-5145.
Comments Due: 5 p.m. ET 8/14/19.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1836-015; ER10-2005-014; ER11-26-014; ER10-
1841-014; ER10-1845-014; ER10-1852-028; ER10-1897-014; ER10-1905-014;
ER10-1907-013; ER10-1918-014; ER10-1925-014; ER10-1927-014; ER10-1950-
014; ER10-2006-015; ER18-2246-003; ER10-1964-014; ER18-1771-004; ER16-
1872-005; ER10-1970-014; ER10-1972-014; ER16-2506-006; ER10-1983-014;
ER10-1984-014; ER18-2224-004;
[[Page 37272]]
ER13-2461-009; ER10-1991-014; ER17-2270-006; ER12-1660-014; ER13-2458-
009; ER10-2078-015; ER11-4462-035; ER10-1951-014; ER17-838-010.
Applicants: Ashtabula Wind, LLC, Ashtabula Wind II, LLC, Ashtabula
Wind III, LLC, Butler Ridge Wind Energy Center, LLC, Crystal Lake Wind
III, LLC, Florida Power & Light Company, FPL Energy Hancock County
Wind, LLC, FPL Energy Mower County, LLC, FPL Energy North Dakota Wind,
LLC, FPL Energy North Dakota Wind II, LLC, FPL Energy Oliver Wind I,
LLC, FPL Energy Oliver Wind II, LLC, Garden Wind, LLC, Hawkeye Power
Partners, LLC, Heartland Divide Wind Project, LLC, Lake Benton Power
Partners II, LLC, Langdon Renewables, LLC, Marshall Solar, LLC, NextEra
Energy Duane Arnold, LLC, NextEra Energy Point Beach, LLC, Oliver Wind
III, LLC, Osceola Windpower, LLC, Osceola Windpower II, LLC, Pegasus
Wind, LLC, Pheasant Run Wind, LLC, Story Wind, LLC, Stuttgart Solar,
LLC, Tuscola Bay Wind, LLC, Tuscola Wind II, LLC, White Oak Energy LLC,
NEPM II, LLC, NextEra Energy Services Massachusetts, LLC, NextEra
Energy Marketing, LLC.
Description: Notification of Change in Status of NextEra Resources
Entities, et al.
Filed Date: 7/24/19.
Accession Number: 20190724-5162.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER17-2059-005.
Applicants: Puget Sound Energy, Inc.
Description: Notice of Non-Material Change in Status of Puget Sound
Energy, Inc.
Filed Date: 7/24/19.
Accession Number: 20190724-5153.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER18-2085-003.
Applicants: Cambria CoGen Company.
Description: Notification of Change in Status of Cambria CoGen
Company.
Filed Date: 7/25/19.
Accession Number: 20190725-5061.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-1213-001.
Applicants: Wabash Valley Power Association, Inc.
Description: Tariff Amendment: ER19-1213-000 Supplemental
Information to be effective 7/25/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5021.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-1680-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 2236R11 Golden Spread Electric
Cooperative, Inc. NITSA NOA Deficiency Respo to be effective 4/1/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5066.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-1964-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 1518R17 Arkansas Electric
Cooperative Corp NITSA NOA)--Amended Filing and Defi to be effective 7/
1/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5024.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2077-001.
Applicants: Public Service Company of Colorado.
Description: Tariff Amendment: OATT-Att O-PSCo Deprec-TCJA
Amendment Filing to be effective 1/1/2018.
Filed Date: 7/25/19.
Accession Number: 20190725-5046.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2084-001.
Applicants: Public Service Company of Colorado.
Description: Tariff Amendment: 2019-7-25 Depreciation Rates & TCJA
to be effective 1/1/2018.
Filed Date: 7/25/19.
Accession Number: 20190725-5043.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2453-000.
Applicants: Lake Lynn Generation, LLC.
Description: Sec. 205(d) Rate Filing: Info. Filing Pursuant to
Schedule 2 of the PJM OATT & Baseline Reactive Tariff to be effective
9/23/2019.
Filed Date: 7/24/19.
Accession Number: 20190724-5126.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19-2454-000.
Applicants: York Haven Power Company, LLC.
Description: Baseline eTariff Filing: Info. Filing Pursuant to
Schedule 2 of the PJM OATT & Baseline Reactive Tariff to be effective
9/23/2019.
Filed Date: 7/24/19.
Accession Number: 20190724-5129.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19-2455-000.
Applicants: Ohio Power Company, AEP Ohio Transmission Company,
Inc., PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: AEP submits ILDSA, Service
Agreement No. 1575 with City of Westerville to be effective 7/1/2019.
Filed Date: 7/24/19.
Accession Number: 20190724-5136.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19-2456-000.
Applicants: Nevada Power Company.
Description: Notice of Cancellation of Coordination Power Service
Agreement No. 5 of Nevada Power Company.
Filed Date: 7/24/19.
Accession Number: 20190724-5147.
Comments Due: 5 p.m. ET 8/14/19.
Docket Numbers: ER19-2457-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2019-07-25_SA 3333 ITC-DTE
Electric (J793) to be effective 7/11/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5022.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2458-000.
Applicants: Alabama Power Company.
Description: Sec. 205(d) Rate Filing: Guernsey Holdings LGIA
Filing to be effective 7/12/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5040.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2459-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Sec. 205(d) Rate Filing: DEC-NCEMC NITSA (SA No. 210)
Arlington Tap to be effective 7/3/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5057.
Comments Due: 5 p.m. ET 8/15/19.
Docket Numbers: ER19-2460-000.
Applicants: DWW Solar II, LLC.
Description: Baseline eTariff Filing: MBR Application and Requests
for Waivers, et al. to be effective 9/23/2019.
Filed Date: 7/25/19.
Accession Number: 20190725-5063.
Comments Due: 5 p.m. ET 8/15/19.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 25, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-16277 Filed 7-30-19; 8:45 am]
BILLING CODE 6717-01-P