Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process; STS Hydropower, LLC and City of Danville, 36913 [2019-16150]
Download as PDF
Federal Register / Vol. 84, No. 146 / Tuesday, July 30, 2019 / Notices
Authorization to Issue Securities of AEP
Texas Inc., et al.
Filed Date: 7/24/19.
Accession Number: 20190724–5086.
Comments Due: 5 p.m. ET 8/14/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16116 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2411–028]
jspears on DSK3GMQ082PROD with NOTICES
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process; STS
Hydropower, LLC and City of Danville
a. Type of Application: Notice of
Intent to File License Application and
Request to Use the Traditional Licensing
Process.
b. Project No.: 2411–028.
c. Date filed: May 31, 2019.
d. Submitted by: STS Hydropower,
LLC (STS Hydropower) and City of
Danville (Danville).
e. Name of Project: Schoolfield
Hydroelectric Project.
f. Location: Located on the Dan River
in the Town of Danville, Pittsylvania
County, Virginia. The project does not
occupy any federal lands.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Michael Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 116 State
Street, P.O. Box 167, Neshkoro, WI
54960, Phone: (973) 998–8400, Email:
michael.scarzello@eaglecreekre.com.
VerDate Sep<11>2014
16:42 Jul 29, 2019
Jkt 247001
i. FERC Contact: Laurie Bauer, Phone:
(202) 502–6519, Email: laurie.bauer@
ferc.gov.
j. STS Hydropower and Danville filed
its request to use the Traditional
Licensing Process on May 31, 2019. STS
Hydropower provided public notice of
its request on May 30, 2019. In a letter
dated July 24, 2019, the Director of the
Division of Hydropower Licensing
approved Consolidated Hydro’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
Virginia State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
STS Hydropower and Danville as the
Commission’s non-federal
representatives for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. STS Hydropower and Danville
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 2411.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
36913
for license for this project must be filed
by April 30, 2022.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: July 24, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–16150 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[OR19–26–000]
American Aviation Supply LLC, Delta
Air Lines, Inc., JetBlue Airways
Corporation, United Airlines, Inc. v.
Buckeye Pipe Line Company, L.P.;
Notice of Complaint
Take notice that July 22, 2019,
pursuant to sections 1(5), 6, 8, 9, 13, 15
and 16 of the Interstate Commerce Act,1
section 1803 of the Energy Policy Act of
1992 (EPAct),2 Rule 206 of the Rules of
Practice and Procedures of the Federal
Energy Regulatory Commission
(Commission),3 and Rules 343.1(a)
343.2(c) of the Commission’s Procedural
Rules Applicable to Oil Pipeline
Proceedings,4 American Aviation
Supply LLC, Delta Air Lines, Inc.,
JetBlue Airways Corporation, and
United Airlines, Inc. (collectively, Joint
Complainants) filed an amended joint
complaint modifying and
supplementing the original complaint
filed on June 5, 2019 against Buckeye
Pipe Line Company, L.P. (Buckeye or
Respondent), challenging the lawfulness
of the rates charged by Buckeye for
transportation of jet and/or aviation
turbine fuel from Linden, New Jersey to
the New York City market, specifically
Newark International Airport, New
Jersey, J.F. Kennedy International
Airport, New York and LaGuardia
Airport, New York, all as more fully
explained in the complaint.
The Complainant certifies that copies
of the complaint were served on the
contacts listed for Respondent on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
1 49
U.S.C. App. 1(5), 6, 8, 9, 13, 15 and 16.
Law 102–486, 106 Stat. 2772 (1992).
3 18 CFR 385.206 (2018).
4 18 CFR 343.1(a) and 343.2(c) (2018).
2 Public
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 84, Number 146 (Tuesday, July 30, 2019)]
[Notices]
[Page 36913]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16150]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2411-028]
Notice of Intent To File License Application, Filing of Pre-
Application Document, and Approving Use of the Traditional Licensing
Process; STS Hydropower, LLC and City of Danville
a. Type of Application: Notice of Intent to File License
Application and Request to Use the Traditional Licensing Process.
b. Project No.: 2411-028.
c. Date filed: May 31, 2019.
d. Submitted by: STS Hydropower, LLC (STS Hydropower) and City of
Danville (Danville).
e. Name of Project: Schoolfield Hydroelectric Project.
f. Location: Located on the Dan River in the Town of Danville,
Pittsylvania County, Virginia. The project does not occupy any federal
lands.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Mr. Michael Scarzello, Director,
Eagle Creek Renewable Energy, LLC, 116 State Street, P.O. Box 167,
Neshkoro, WI 54960, Phone: (973) 998-8400, Email:
[email protected].
i. FERC Contact: Laurie Bauer, Phone: (202) 502-6519, Email:
[email protected].
j. STS Hydropower and Danville filed its request to use the
Traditional Licensing Process on May 31, 2019. STS Hydropower provided
public notice of its request on May 30, 2019. In a letter dated July
24, 2019, the Director of the Division of Hydropower Licensing approved
Consolidated Hydro's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Virginia State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating STS Hydropower and Danville
as the Commission's non-federal representatives for carrying out
informal consultation pursuant to section 7 of the Endangered Species
Act; and consultation pursuant to section 106 of the National Historic
Preservation Act.
m. STS Hydropower and Danville filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 2411. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by April 30,
2022.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: July 24, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-16150 Filed 7-29-19; 8:45 am]
BILLING CODE 6717-01-P