New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 36918 [2019-16115]
Download as PDF
36918
Federal Register / Vol. 84, No. 146 / Tuesday, July 30, 2019 / Notices
assumptions of liability, is August 12,
2019.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16114 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14997–000]
jspears on DSK3GMQ082PROD with NOTICES
New England Hydropower Company,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 23, 2019, New England
Hydropower Company, LLC, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of hydropower on the Lehigh
Canal in Lehigh County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
VerDate Sep<11>2014
16:42 Jul 29, 2019
Jkt 247001
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Lehigh Canal
Allentown Hydroelectric Project would
consist of the following: (1) An existing
11-foot-high, 480-foot-long concrete
gravity dam (i.e., the Hamilton Street
Dam); (2) an existing impoundment
with an approximate surface area of 50
acres and a storage capacity of 371 acrefeet at a normal surface elevation of 240
feet mean sea level; (3) an existing canal
approximately 0.58 mile long; (4) an
existing 20-foot-wide gate structure on
the canal with a spillway; (5) a new 14foot-wide, 20-foot-long intake channel;
(6) a new 16-foot by 20-foot powerhouse
containing one Archimedes Screw
turbine-generator unit with a total
capacity of 485 kilowatts; (7) a new 480volt, 350-foot-long transmission line
connecting the powerhouse to a nearby
grid interconnection point; and (8)
appurtenant facilities. The proposed
project would have an average annual
generation of 3,560 megawatt-hours.
Applicant Contact: Michael C. Kerr,
New England Hydropower Company,
LLC, 100 Cummings Center, Suite 451C,
Beverly, MA 01915; phone: (978) 360–
2547.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The first page of any filing should
include docket number P–14997–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the eLibrary
link of the Commission’s website at
PO 00000
Frm 00035
Fmt 4703
Sfmt 9990
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14997) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: July 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16115 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–471–000]
Notice of Environmental Onsite
Review: Bluewater Gas Storage, LLC
On August 7, 2019, the Office of
Energy Projects staff will conduct a site
visit of the proposed Bluewater Gas
Storage, LLC’s (Bluewater) Omo Road
Compressor Station site and potential
alternative sites. The purpose of the site
visit is to evaluate the proposed location
and any feasible alternatives.
All interested parties planning to
attend must provide their own
transportation. Those attending should
meet at the following time and location:
• 11:00 a.m. (EDT) at the Ray
Township Hall, 64255 Wolcott Road,
Ray, MI 48096.
FERC staff will also attend a
Bluewater-sponsored open house on
August 7, 2019 from 4:00 p.m. to 7:00
p.m. (EDT) at the Ray Township Hall,
64255 Wolcott Road, Ray, MI 48096.
Please use the FERC’s free
eSubscription service to keep track of all
formal issuances and submittals in these
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to www.ferc.gov/docs-filing/
esubscription.asp.
Information about specific onsite
environmental reviews is posted on the
Commission’s calendar at https://
www.ferc.gov/EventCalendar/Events
List.aspx. For additional information,
contact Office of External Affairs at
(866) 208–FERC.
Dated: July 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16112 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 84, Number 146 (Tuesday, July 30, 2019)]
[Notices]
[Page 36918]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16115]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14997-000]
New England Hydropower Company, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 23, 2019, New England Hydropower Company, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of
hydropower on the Lehigh Canal in Lehigh County, Pennsylvania. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed Lehigh Canal Allentown Hydroelectric Project would
consist of the following: (1) An existing 11-foot-high, 480-foot-long
concrete gravity dam (i.e., the Hamilton Street Dam); (2) an existing
impoundment with an approximate surface area of 50 acres and a storage
capacity of 371 acre-feet at a normal surface elevation of 240 feet
mean sea level; (3) an existing canal approximately 0.58 mile long; (4)
an existing 20-foot-wide gate structure on the canal with a spillway;
(5) a new 14-foot-wide, 20-foot-long intake channel; (6) a new 16-foot
by 20-foot powerhouse containing one Archimedes Screw turbine-generator
unit with a total capacity of 485 kilowatts; (7) a new 480-volt, 350-
foot-long transmission line connecting the powerhouse to a nearby grid
interconnection point; and (8) appurtenant facilities. The proposed
project would have an average annual generation of 3,560 megawatt-
hours.
Applicant Contact: Michael C. Kerr, New England Hydropower Company,
LLC, 100 Cummings Center, Suite 451C, Beverly, MA 01915; phone: (978)
360-2547.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. The first page of any filing should include
docket number P-14997-000.
More information about this project, including a copy of the
application, can be viewed or printed on the eLibrary link of the
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14997) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: July 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16115 Filed 7-29-19; 8:45 am]
BILLING CODE 6717-01-P