Notice of Request Under Blanket Authorization: Columbia Gas Transmission, LLC, 36910-36911 [2019-16113]
Download as PDF
jspears on DSK3GMQ082PROD with NOTICES
36910
Federal Register / Vol. 84, No. 146 / Tuesday, July 30, 2019 / Notices
Description: Baseline eTariff Filing:
Emmons-Logan Wind, LLC Application
for MBR Authority to be effective 9/21/
2019.
Filed Date: 7/22/19.
Accession Number: 20190722–5131.
Comments Due: 5 p.m. ET 8/12/19.
Docket Numbers: ER19–2438–000.
Applicants: Hickory Run Energy, LLC.
Description: Request for Limited
Waiver, et al. of Hickory Run Energy,
LLC.
Filed Date: 7/22/19.
Accession Number: 20190722–5145.
Comments Due: 5 p.m. ET 8/1/19.
Docket Numbers: ER19–2439–000.
Applicants: Tampa Electric Company.
Description: Petition for Waiver of
Affiliate Transaction Pricing Rule of
Tampa Electric Company.
Filed Date: 7/23/19.
Accession Number: 20190723–5044.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2440–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Baseline eTariff Filing:
Tri-State Stated Rate Filing, FERC
Electric Tariff Volume No. 1 to be
effective 9/21/2019.
Filed Date: 7/23/19.
Accession Number: 20190723–5061.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2441–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Baseline eTariff Filing:
Baseline Open Access Transmission
Tariff to be effective 9/21/2019.
Filed Date: 7/23/19.
Accession Number: 20190723–5063.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2442–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Baseline eTariff Filing:
Tri-State Baseline Market-Based Rate
Tariff to be effective 9/21/2019.
Filed Date: 7/23/19.
Accession Number: 20190723–5073.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2443–000.
Applicants: Thermo Cogeneration
Partnership, L.P.
Description: Baseline eTariff Filing:
Thermo Cogeneration Baseline MarketBased Rate Tariff to be effective 9/21/
2019.
Filed Date: 7/23/19.
Accession Number: 20190723–5075.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2444–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Baseline eTariff Filing:
Tri-State Wholesale Electric Service
Contracts to be effective 9/21/2019.
VerDate Sep<11>2014
16:42 Jul 29, 2019
Jkt 247001
Filed Date: 7/23/19.
Accession Number: 20190723–5077.
Comments Due: 5 p.m. ET 8/13/19.
Docket Numbers: ER19–2445–000.
Applicants: Florida Power & Light
Company.
Description: § 205(d) Rate Filing: FPL
and LMR Solar Engineering and
Construction for Affected System
Agreement to be effective 7/24/2019.
Filed Date: 7/23/19.
Accession Number: 20190723–5131.
Comments Due: 5 p.m. ET 8/13/19.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR19–7–000.
Applicants: North American Electric
Reliability Corporation.
Description: North American Electric
Reliability Corporation Five-Year
Electric Reliability Organization (ERO)
Performance Assessment Report.
Filed Date: 7/22/19.
Accession Number: 20190722–5155.
Comments Due: 5 p.m. ET 8/22/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16110 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–487–000]
Notice of Request Under Blanket
Authorization: Columbia Gas
Transmission, LLC
Take notice that on July 12, 2019,
Columbia Gas Transmission, LLC
(Columbia Gas), 700 Louisiana Street,
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Houston, Texas 77002, filed in Docket
No. CP19–487–000 a prior notice
request pursuant to sections 157.205,
and 157.216 of the Commission’s
regulations under the Natural Gas Act
for authorization to abandon three
injection/withdrawal wells and
associated pipelines and appurtenances,
located in its Brinker Storage Field in
Columbiana County, Ohio. Columbia
proposes to abandon these facilities
under authorities granted by its blanket
certificate issued in Docket No. CP83–
76, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection.
The filing may also be viewed on the
web at https://www.ferc.gov using the
eLibrary link. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Sorana
Linder, Director, Modernization &
Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana
Street, Suite 700, Houston, Texas
77002–2700, at (832) 320–5209 or
sorana_linder@transcanada.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the EA
E:\FR\FM\30JYN1.SGM
30JYN1
Federal Register / Vol. 84, No. 146 / Tuesday, July 30, 2019 / Notices
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list and will be
notified of any meetings associated with
the Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions in lieu of paper using
the eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 3 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street NE, Washington, DC
20426.
Dated: July 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–16113 Filed 7–29–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 190–105]
jspears on DSK3GMQ082PROD with NOTICES
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests: Moon Lake
Electric Association, Inc.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor, new
license.
b. Project No.: P–190–105.
c. Date filed: January 31, 2017.
d. Applicant: Moon Lake Electric
Association, Inc.
VerDate Sep<11>2014
16:42 Jul 29, 2019
Jkt 247001
e. Name of Project: Uintah
Hydroelectric Project.
f. Location: The project is located near
the Town of Neola, Duchesne County,
Utah and diverts water from primarily
the Uinta River as well as Big Springs
Creek and Pole Creek. The project is
located almost entirely on the tribal
lands of the Uintah and Ouray Native
American Reservation and federal lands
managed by Ashley National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Patrick Corun,
Engineering Manager, Moon Lake
Electric Association, Inc., 800 West U.S.
Hwy 40, Roosevelt, Utah 84066, (435)
722–5406, pcorun@mleainc.com.
i. FERC Contact: Quinn Emmering,
(202) 502–6382, quinn.emmering@
ferc.gov.
j. Deadline for filing motions to
intervene and protests and requests for
cooperating agency status: 60 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–190–105.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. Project Description: The Uintah
Hydroelectric Project operates as a runof-river facility delivering water to the
project facilities from primarily the
Uinta River as well as Big Springs and
Pole Creek. Existing project facilities
include: (1) A stop-log diversion
structure on the that conveys flow from
Big Springs Creek and a non-project
canal to a 916-foot-long, 28-inch
diameter, steel pipeline that connects to
the point of diversion on the Uinta
River; (2) an 80-foot-long, 4-foot-wide,
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
36911
3-foot-high overflow-type concrete
diversion structure with a 10-foot-high,
6.5-foot-wide steel slide gate on the
Uinta River; (3) a concrete structure
with manual slide gates for dewatering
the main supply canal and returning
water to the Uinta River immediately
downstream of the Uinta diversion; (4)
an emergency slide gate about midway
along the main supply canal; (5) a 16foot-wide, 8-foot-deep, 25,614-foot-long,
clay-lined main supply canal which
conveys water from Big Springs Creek
and the Uinta River; (6) a stop-log
diversion structure with non-functional
control gates which diverts water from
Pole Creek; (7) a 6-foot-wide, 4-footdeep, 6,200-foot-long Pole Creek canal
that collects water from the Pole Creek
diversion; (8) an 86-inch-wide, 80-inchlong, 43-inch-high transition bay and a
140-foot-long, 14-inch diameter steel
penstock collects water from the Pole
Creek canal; (9) a 23-foot by 13-foot
concrete forebay structure containing
trashracks with 2.5-inch spacing, a
headgate that is located at the
termination of the main supply canal
and the Pole Creek penstock, and an
overflow channel; (10) a single 5,238foot-long, 36-inch diameter
polyurethane and steel penstock which
delivers water to a concrete powerhouse
with two Pelton turbines driving two
600-kilowatt (KW) generators; (11) a
600-foot-long tailrace; (12) an 8.5-milelong, 4.75-mile-long 24.9-kilovolt (KV)
single wood pole distribution line; and
(13) appurtenant facilities.
The estimated average annual
generation is about 6,073 megawatthours. Moon Lake proposes to modify
the project boundary to account for an
update to the project transmission line
that reduced its total length from 8.5
miles to 4.75 miles.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 84, Number 146 (Tuesday, July 30, 2019)]
[Notices]
[Pages 36910-36911]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-16113]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP19-487-000]
Notice of Request Under Blanket Authorization: Columbia Gas
Transmission, LLC
Take notice that on July 12, 2019, Columbia Gas Transmission, LLC
(Columbia Gas), 700 Louisiana Street, Houston, Texas 77002, filed in
Docket No. CP19-487-000 a prior notice request pursuant to sections
157.205, and 157.216 of the Commission's regulations under the Natural
Gas Act for authorization to abandon three injection/withdrawal wells
and associated pipelines and appurtenances, located in its Brinker
Storage Field in Columbiana County, Ohio. Columbia proposes to abandon
these facilities under authorities granted by its blanket certificate
issued in Docket No. CP83-76, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection.
The filing may also be viewed on the web at https://www.ferc.gov
using the eLibrary link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
[email protected] or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Sorana
Linder, Director, Modernization & Certificates, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 700, Houston, Texas
77002-2700, at (832) 320-5209 or [email protected].
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the EA
[[Page 36911]]
for this proposal. The filing of the EA in the Commission's public
record for this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list and will be
notified of any meetings associated with the Commission's environmental
review process. Environmental commenters will not be required to serve
copies of filed documents on all other parties. However, the non-party
commenters will not receive copies of all documents filed by other
parties or issued by the Commission and will not have the right to seek
court review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions in lieu of paper using the eFiling link at
https://www.ferc.gov. Persons unable to file electronically should
submit an original and 3 copies of the protest or intervention to the
Federal Energy regulatory Commission, 888 First Street NE, Washington,
DC 20426.
Dated: July 22, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019-16113 Filed 7-29-19; 8:45 am]
BILLING CODE 6717-01-P