Turners Falls Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests, 35109-35110 [2019-15485]
Download as PDF
Federal Register / Vol. 84, No. 140 / Monday, July 22, 2019 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RM07–16–000]
[Project No. 2428–007; Project No. 10254–
026; Project No. 10253–032]
Notice of Revision in Official
Document Repository; Filing Via the
Internet
The Federal Energy Regulatory
Commission (FERC) hereby gives notice
that the documents posted on eLibrary
will serve as the Commission’s official
order and/or Commission action, and
eLibrary will serve as the Commission’s
repository for the official record of
Commission proceedings, including
filings and Commission issuances. This
policy revises the previous 2002 policy
on available document formats for FERC
issuances.1 This revision applies to
orders and notices issued by the Office
of the Secretary, as well as to delegated
orders and notices.
Persons with internet access can
review and obtain official Commission
issuances through the Commission’s
eLibrary system by using the FERC
Online links at https://www.ferc.gov. The
FERC website also includes an
eSubscription link that enables persons
with internet access to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659. Persons without
internet access also may contact FERC
Online Support at these telephone
numbers for assistance in obtaining
official Commission issuances.
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–15484 Filed 7–19–19; 8:45 am]
jbell on DSK3GLQ082PROD with NOTICES
BILLING CODE 6717–01–P
1 Notice of Change in Available Document
Formats for FERC Issuances (August 27, 2002),
https://elibrary.ferc.gov/IDMWS/common/
opennat.asp?fileID=9554319.
VerDate Sep<11>2014
19:11 Jul 19, 2019
Jkt 247001
Aquenergy Systems, LLC; Pelzer
Hydro Company, LLC and
Consolidated Hydro Southeast, LLC;
Pelzer Hydro Company, LLC and
Consolidated Hydro Southeast, LLC;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
applications for licenses for the
Piedmont (FERC Project No. 2428–007),
Upper Pelzer (FERC Project No. 10254–
026), and Lower Pelzer (FERC Project
No. 10253–032) Hydroelectric Projects
located on the Saluda River in Anderson
and Greenville Counties, South
Carolina, and has prepared a Draft
Environmental Assessment (DEA).
The DEA contains staff’s analysis of
the potential environmental impacts of
the projects and concludes that
licensing the projects, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the DEA is available for
review at the Commission in the Public
Reference Room, or may be viewed on
the Commission’s website at
www.ferc.gov using the eLibrary link.
Enter one of the docket numbers,
excluding the last three digits in the
docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
45 days from the date of this notice.
Comments may be filed electronically
via the internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s website (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the eFiling link. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
35109
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support
FERCOnlineSupport@ferc.gov. Although
the Commission strongly encourages
electronic filings, documents may also
be paper-filed. To paper-file, mail an
original copy to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426. Please affix
Project Nos. 2428–007, 10254–026, and
10253–032 to all comments.
For further information, contact
Navreet Deo by telephone at 202–502–
6304, or by email at navreet.deo@
ferc.gov.
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–15481 Filed 7–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2622–013]
Turners Falls Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2622–013.
c. Date Filed: February 4, 2019.
d. Applicant: Turners Falls Hydro,
LLC (Turners Falls Hydro).
e. Name of Project: Turners Falls
Project.
f. Location: On the Connecticut River,
in the power canal of the Turners Falls
Hydroelectric Project No. 1889, in
Franklin County, Massachusetts. No
federal lands are occupied by the project
works or located within the project
boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Michael
Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 65 Madison
Avenue, Suite 500, Morristown, NJ
07960; Phone at (973) 998–8400, or
email at michael.scarzello@
eaglecreekre.com.
i. FERC Contact: Amanda Gill, (202)
502–6773 or amanda.gill@ferc.gov.
E:\FR\FM\22JYN1.SGM
22JYN1
jbell on DSK3GLQ082PROD with NOTICES
35110
Federal Register / Vol. 84, No. 140 / Monday, July 22, 2019 / Notices
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2622–013.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. Project Description: The proposed
Turners Falls Project would consist of:
(1) An existing 10-foot-long, 20-footwide, 12- to 22-foot-high forebay; (2) a
20-foot-wide, 22-foot-high trashrack
with 1.5-inch clear-bar spacing; (3) two
headgates; (4) an 8.5-foot-diameter, 50foot-long steel penstock; (5) a 3,847square foot powerhouse containing one
937-kilowatt vertical Francis-type
turbine-generator unit; (6) a 50-footlong, underground flume; (7) an 80-footlong, 10-foot-wide tailrace; (8) a 1,000foot-long, 13.8-kilovolt transmission
line; (9) and appurtenant facilities.
When generating, the project
withdraws up to 289 cubic feet per
second from FirstLight Hydro
Generating Company’s power canal for
the Turners Falls Hydroelectric Project
No. 1889, and discharges directly into
the Connecticut River. Turners Falls
Hydro operates the project in a run-ofriver mode with an average annual
generation of approximately 1,512
megawatt-hours. Turners Falls Hydro
proposes to continue operating the
project in a run-of-river mode and does
not propose any new construction or
modifications to the project.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
VerDate Sep<11>2014
19:11 Jul 19, 2019
Jkt 247001
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
Montague Public Library, Carnegie
Library Branch located at 201 Avenue
A, Turners Falls, MA 01376.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title PROTEST, or MOTION
TO INTERVENE; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Issue Scoping Document 1 for
Comments—July 2019
Request Additional Information (if
necessary)—August 2019
Issue Scoping Document 2—September
2019
Issue Notice of Ready for Environmental
Analysis—September 2019
Issue Notice of Availability of
Environmental Assessment—April
2020
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–15485 Filed 7–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14799–001]
Lock 13 Hydro Partners, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–14799–001.
c. Date filed: July 1, 2019.
d. Applicant: Lock 13 Hydro Partners,
LLC.
e. Name of Project: Evelyn
Hydroelectric Project.
f. Location: On the Kentucky River, in
Lee and Estill Counties, Kentucky. The
project would be located at the
Commonwealth of Kentucky’s existing
Lock and Dam No. 13. No federal land
would be occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: David Brown
Kinloch, Lock 13 Hydro Partners, LLC,
414 S Wenzel Street, Louisville, KY
40204; (502) 589–0975; email—
kyhydropower@gmail.com.
i. FERC Contact: Sarah Salazar, (202)
502–6863 or sarah.salazar@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 84, Number 140 (Monday, July 22, 2019)]
[Notices]
[Pages 35109-35110]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15485]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2622-013]
Turners Falls Hydro, LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2622-013.
c. Date Filed: February 4, 2019.
d. Applicant: Turners Falls Hydro, LLC (Turners Falls Hydro).
e. Name of Project: Turners Falls Project.
f. Location: On the Connecticut River, in the power canal of the
Turners Falls Hydroelectric Project No. 1889, in Franklin County,
Massachusetts. No federal lands are occupied by the project works or
located within the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael Scarzello, Director, Eagle Creek
Renewable Energy, LLC, 65 Madison Avenue, Suite 500, Morristown, NJ
07960; Phone at (973) 998-8400, or email at
[email protected].
i. FERC Contact: Amanda Gill, (202) 502-6773 or
[email protected].
[[Page 35110]]
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene and protests using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, please send a paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426. The
first page of any filing should include docket number P-2622-013.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. Project Description: The proposed Turners Falls Project would
consist of: (1) An existing 10-foot-long, 20-foot-wide, 12- to 22-foot-
high forebay; (2) a 20-foot-wide, 22-foot-high trashrack with 1.5-inch
clear-bar spacing; (3) two headgates; (4) an 8.5-foot-diameter, 50-
foot-long steel penstock; (5) a 3,847-square foot powerhouse containing
one 937-kilowatt vertical Francis-type turbine-generator unit; (6) a
50-foot-long, underground flume; (7) an 80-foot-long, 10-foot-wide
tailrace; (8) a 1,000-foot-long, 13.8-kilovolt transmission line; (9)
and appurtenant facilities.
When generating, the project withdraws up to 289 cubic feet per
second from FirstLight Hydro Generating Company's power canal for the
Turners Falls Hydroelectric Project No. 1889, and discharges directly
into the Connecticut River. Turners Falls Hydro operates the project in
a run-of-river mode with an average annual generation of approximately
1,512 megawatt-hours. Turners Falls Hydro proposes to continue
operating the project in a run-of-river mode and does not propose any
new construction or modifications to the project.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's website at https://www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and
reproduction at the Montague Public Library, Carnegie Library Branch
located at 201 Avenue A, Turners Falls, MA 01376.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) bear in all capital letters the title PROTEST,
or MOTION TO INTERVENE; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain
copies of the application directly from the applicant. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
Issue Scoping Document 1 for Comments--July 2019
Request Additional Information (if necessary)--August 2019
Issue Scoping Document 2--September 2019
Issue Notice of Ready for Environmental Analysis--September 2019
Issue Notice of Availability of Environmental Assessment--April 2020
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-15485 Filed 7-19-19; 8:45 am]