Federal Register / Vol. 84, No. 140 / Monday, July 22, 2019 / Notices
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 30, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–14799–001.
m. The application is not ready for
environmental analysis at this time.
n. The proposed Evelyn Project would
be operated in a run-of-river mode and
would consist of: (1) An existing
estimated 223-acre impoundment at a
pool elevation of 617.38 feet mean sea
level (North American Vertical Datum of
1988); (2) an existing concrete dam with
a 246-foot-long, 34-foot-wide, and 38.2foot-high spillway and a 148-foot-long,
38.2-foot-high, and 52-foot-wide lock
chamber; (3) a new 73-foot-long by 52foot-wide reinforced concrete
powerhouse that would be submerged
in the existing lock chamber, with five
Flygt axial-flow propeller turbine
generator units each rated at 560kilowatts (kW), for a total installed
capacity of 2.8 MW; (4) a new 110-footlong buried cable transmitting power
from the submerged powerhouse to a
new two story, 48-foot-long by 30-footwide Control Building onshore which
would house the project controls; (5) a
new 600-foot-long, 12.47-kilovolt
overhead transmission line that would
connect to an existing Jackson Energy
Cooperative line of the same voltage;
and (6) appurtenant facilities. The
estimated average annual generation
would be 11,274 megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s website at
https://www.ferc.gov using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item h above.
VerDate Sep<11>2014
19:11 Jul 19, 2019
Jkt 247001
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance—December
2019
Issue notice of ready for environmental
analysis—December 2019
Commission issues EA—August 2020
Comments on EA—September 2020
Dated: July 15, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–15466 Filed 7–19–19; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER17–1821–002]
Panda Stonewall LLC; Notice
Establishing Answer Period
On July 10, 2019, Panda Stonewall
LLC (Panda) filed a Motion for
Extension of Time (Motion), from July
18, 2019 to October 8, 2019, to file briefs
opposing exceptions to the Initial
Decision, in the above referenced
proceedings. Included in the Motion
was a request that the Commission
shorten to two days the period for
answers to the Motion. Joint Customers 1
and Commission Trial Staff filed
answers opposing Panda’s request for a
shortened answer period.
Upon consideration, notice is hereby
given that answers to Panda’s Motion
are due by 5 p.m. Eastern Time on July
17, 2019.
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–15482 Filed 7–19–19; 8:45 am]
BILLING CODE 6717–01–P
1 The Joint Customers are Old Dominion Electric
Cooperative, North Carolina Electric Membership
Corporation, Northern Virginia Electric
Cooperative, Inc., and Dominion Energy Services,
Inc., on behalf of Virginia Electric and Power
Company d/b/a Dominion Energy Virginia/North
Carolina.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
35111
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP19–479–000]
Northern Natural Gas Company; Notice
of Intent To Prepare an Environmental
Assessment for The Proposed
Bushton to Clifton A-Line Replacement
Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Bushton to Clifton A-line
Abandonment Project (Project)
involving construction and operation of
facilities by Northern Natural Gas
Company (Northern) in Clay, Cloud,
Ellsworth, Lincoln, Ottawa, and Rice
counties in Kansas. The Commission
will use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about issues
regarding the project. The National
Environmental Policy Act (NEPA)
requires the Commission to take into
account the environmental impacts that
could result from its action whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity.
NEPA also requires the Commission to
discover concerns the public may have
about proposals. This process is referred
to as scoping. The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. By this notice, the
Commission requests public comments
on the scope of issues to address in the
EA. To ensure that your comments are
timely and properly recorded, please
submit your comments so that the
Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on August 15, 2019.
You can make a difference by
submitting your specific comments or
concerns about the project. Your
comments should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. Your
input will help the Commission staff
determine what issues they need to
evaluate in the EA. Commission staff
will consider all filed comments during
the preparation of the EA.
If you sent comments on this project
to the Commission before the opening of
this docket on June 7, 2019, you will
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 84, Number 140 (Monday, July 22, 2019)]
[Notices]
[Page 35111]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-15482]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER17-1821-002]
Panda Stonewall LLC; Notice Establishing Answer Period
On July 10, 2019, Panda Stonewall LLC (Panda) filed a Motion for
Extension of Time (Motion), from July 18, 2019 to October 8, 2019, to
file briefs opposing exceptions to the Initial Decision, in the above
referenced proceedings. Included in the Motion was a request that the
Commission shorten to two days the period for answers to the Motion.
Joint Customers \1\ and Commission Trial Staff filed answers opposing
Panda's request for a shortened answer period.
---------------------------------------------------------------------------
\1\ The Joint Customers are Old Dominion Electric Cooperative,
North Carolina Electric Membership Corporation, Northern Virginia
Electric Cooperative, Inc., and Dominion Energy Services, Inc., on
behalf of Virginia Electric and Power Company d/b/a Dominion Energy
Virginia/North Carolina.
---------------------------------------------------------------------------
Upon consideration, notice is hereby given that answers to Panda's
Motion are due by 5 p.m. Eastern Time on July 17, 2019.
Dated: July 16, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-15482 Filed 7-19-19; 8:45 am]
BILLING CODE 6717-01-P